Loading...
05-0750 Steve Review No 2 122107 From: Steve Harrington Sent: Friday, December 21, 2007 3:41 PM To: Roberta Allen Subject: Steve FW: Comments for Tahoma Terra Fairway Multi-Family Review # 2 ????HRoberta:  Here are the comments for Tahoma Terra Fairway Multi-Family Review # 2.  I sent them to Jim on 12/06/07, it was my understanding he requested them from me?  You will find them below on this e-mail to Jim. Thank you, Steve From: Steve Harrington Sent: Thursday, December 06, 2007 4:22 PM To: Jim Gibson Subject: Comments for Tahoma Terra Fairway Multi-Family Review # 2 Jim:  The following are review comments for the Tahoma Terra Fairway Multi-Family Review # 2. Item # 2 from the 1st review still needs to be addressed.  This section discusses the pervious area only, does not cover the treatment or infiltration. Item # 7 from the 1st review still needs to be addressed for treatment and infiltration. Item # 8 from the 1st review still needs to be addressed and show, concerning storage volume. Detail on sheet C4.2 (5) Trail Detail callouts are cut off. Item # 30 from the 1st review, the given elevations, appear to have storm run off running up into the interceptor swale? Item # 32 from the 1st review has the roof drains running into the parking lot.  Is this typical for all buildings?  Should the irrigation meter on the domestic water line have a back flow prevention device on it, after the meter? Item # 50 from the 1st review still needs to be addressed. All cleanouts on the side sewers, need to be shown on plans. Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264