Loading...
City of Yelm Inspection Form # 7 Dels Farm Supply City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 5/20/08 Day: Wedneday Time: 4:00 p.m.  Project Name: Dels Farm Supply Project Number SPR-05-0673-YL  Project Description: Commercial Contractor's Name: Wood & Son / Hatton, Godat & Pantier / Lakeside Inc.  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, warm. Soil conditions are rocky, good top course rock.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is working has lined stormed pond portion of parking has been paved by lakeside.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Storm pond has lining material in and portions of parking lot is paved.  Sketch or Paste Pictures Below:    Date 5/20/08 Typed or Printed Name and Title Steve Harrington Signature