05-0673 Punchlist 1 090508
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
September 5, 2008
Randy Paigen
P.O. Box 625
Yelm, WA 98597
RE: Del’s Farm Supply – City of Yelm Project No. SPR-05-0673-YL
Construction Punchlist No. 1
Mr. Paigen:
Please see below for punchlist items that were noted during preliminary project walk-thru. This is a comprehensive list that includes all departments from within the City.
Sewer Department: No Comments, all items completed.
Water Department:
Has the Fire Hydrant lock been paid for?
Raise gate valve at hot tap on Bald Hills Rd
All meter and backflow assemble boxes need to be set to final grade.
Irrigation not connected to water.
No Bollards around Fire Hydrant.
Unable to access gate valve for Fire Hydrant, pallets of supplies stake on top of valve, pallets need to be moved for access to gate valve and fire hydrant, area must remain clear.
Need test results for Double Detector Check Valve Assembly sent to City of Yelm water dept.
Planning Comments:
The streets trees along the frontage of Bald Hills are required to be labeled and planted per the City of Yelm street tree planting detail per approval letter dated 3-13-08. The letter
is attached for your reference.
Engineering Comments:
Type 3 with chevron barricade needed for the end of sidewalk on Bald Hills Road frontages.
Additional items that need to be submitted and reviewed before final occupancy may be issued:
If you have any questions or would like to have a meeting on site to discuss these comments please contact Steve Harrington at (360) 458-8423 or email at steveh@ci.yelm.wa.us.
Community Development Department
Respectfully,
Steve Harrington
Engineering / Civil Inspector