05-0673 Sewer Review No. 1 051407
CITY OF YELM SEWER DEPARTMENT
Re: Review Del’s Farm Supply
May 14, 2007
The proposed mainline extention is shown as 4” does it need to be this big?
Show the menthod of connection to the existing sewer main.
What is the STEP Tank size?
What is the Depth of bury of this tank?
How many pumps? Simplex or Duplex (I prefer Simplex)
What is the location of the Pump Control Panel?
Where is the nearest hose bib?
The end of the new mainline requires an End of Line Clean Out. Not a blow-off.
What is the size of the service line for this tank?
The Carson Box should be in the planter stripe.
Please show the current details on the drawings.