05-0673 Water Review No. 1 040407 From: Edward Smith
Sent: Wednesday, April 04, 2007 10:02 AM
To: Tim Peterson
Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington
Subject: Del's Farm Supply Plan Review Public Works.doc
??????? City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 4/4/07 Page
1
of
1
Location: Del’s Farm Supply Department: Water
Contractor: Rep:
1. Need to move the domestic water meter to the same location as the irrigation water meter.
2. The one inch domestic water meter and the irrigation meter are required to have a back floe assembly device behind the meters.
3. The main that is on Bald Hills Road is a ten inch water main.
4. On the fire hydrant note, why is there a six inch forty five degree bend?
5. The bollards shown an the print are not what in the City of Yelm specifications.
6. The existing well will need to be pulled , per DOE/DOH requirement and a copy of the report send to the water department.
Reviewed by: John I and Edward Smith
Signed by: Edward Smith