Loading...
05-0673 Water Review 3 020808 From: Edward Smith Sent: Friday, February 08, 2008 10:03 AM To: Tim Peterson Cc: Deonne Hardy; Kevin Ray; Karen Bennett; John Ivey; Jim Gibson; Steve Harrington Subject: Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc Del's Farme Supply water plan review 8 /Feb / 08 ?????? City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date: 8 February 08                                                                           Page 1   Location:  Del’s Farm Supply                                                          Department:  Water   Contractor:                                                                                          Rep: 1.         The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2.         The City of Yelm water department will need a copy of the well removable report. 3.         IMPORTANT; The water main and sewer main on Morris Road and going across Bald Hills Road maybe to close. There is an existing ten inch water main on the Southeast side of Morris Road. 4.         The water main on Bald Hills Road is a ten inch water main on the East side of the road. 5.         The sewer main will need to be ten feet away from the existing water main. 6.         The gate valve housing pipe needs to be six inch SDR 21 class 200 pipe, NOT six inch SDR 35 PVC. 7.         Don’t need four inch PVC pipe in the meter boxes. 8.         Will need to have the appropriate backflow assembly for the hazard in this business and the irrigation system.   Reviewed by:  Edward Smith, John I Signed by:    Edward Smith