Del's Farm Supply 8 Feb 08 Plan Review Public Works docIPM.Note
Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc
Steve Harrington
Edward Smith
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Edward Smith
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Deonne Hardy; Kevin Ray; Karen Bennett; John Ivey; Jim Gibson; Steve Harrington
Tim Peterson
Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
Del's Farme Supply water plan review 8 /Feb / 08
________________________________
City of Yelm
Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 8 February 08
Page 1
Location: Del’s Farm Supply
Department: Water
Contractor:
Rep:
1. The developer is responsible for the cost of the fire hydrant
locks and the City of Yelm Water Department will order and install them.
The project will not be final until the City of Yelm has received the
payment in full for the fire hydrant locks.
2. The City of Yelm water department will need a copy of the
well removable report.
3. IMPORTANT; The water main and sewer main on Morris Road and
going across Bald Hills Road maybe to close. There is an existing ten
inch water main on the Southeast side of Morris Road.
4. The water main on Bald Hills Road is a ten inch water main on
the East side of the road.
5. The sewer main will need to be ten feet away from the
existing water main.
6. The gate valve housing pipe needs to be six inch SDR 21 class
200 pipe, NOT six inch SDR 35 PVC.
7. Don’t need four inch PVC pipe in the meter boxes.
8. Will need to have the appropriate backflow assembly for the
hazard in this business and the irrigation system.
Reviewed by: Edward Smith, John I
Signed by: Edward Smith
<DC90029353CCCD468AA2A2858FFCD8F5051442@server1.ci.yelm.wa.us>
Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc.EML
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
458-8499
Public Works
Tim Peterson
Tim Peterson
tim
Deonne Hardy
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne
deonne@ci.yelm.wa.us
deonne
Public Works
Deonne Hardy
Deonne Hardy
deonne
Kevin Ray
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin
kevin@ci.yelm.wa.us
kevin
458-8412
Public Works
Kevin Ray
Kevin Ray
kevin
Karen Bennett
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KarenB
KarenB@ci.yelm.wa.us
KarenB
Karen Bennett
Karen Bennett
KarenB
John Ivey
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JohnI
JohnI@ci.yelm.wa.us
JohnI
John Ivey
John Ivey
JohnI
Jim Gibson
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
Jim Gibson
Jim Gibson (jimg@ci.yelm.wa.us)
jimg@ci.yelm.wa.us
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
Steve Harrington
STEVEH
image001.gif
.gif
image001.gif
image001.gif
image/gif
image001.gif@01C86A39.B8629E10
image002.gif
.gif
image002.gif
image002.gif
image/gif
image002.gif@01C86A39.B8629E10
image003.gif
.gif
image003.gif
image003.gif
image/gif
image003.gif@01C86A39.B8629E10