Loading...
Del's Farm Supply 8 Feb 08 Plan Review Public Works docIPM.Note Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc Steve Harrington Edward Smith Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Deonne Hardy; Kevin Ray; Karen Bennett; John Ivey; Jim Gibson; Steve Harrington Tim Peterson Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server Del's Farme Supply water plan review 8 /Feb / 08 ________________________________ City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Public Works Inspection Report Date: 8 February 08 Page 1 Location: Del’s Farm Supply Department: Water Contractor: Rep: 1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2. The City of Yelm water department will need a copy of the well removable report. 3. IMPORTANT; The water main and sewer main on Morris Road and going across Bald Hills Road maybe to close. There is an existing ten inch water main on the Southeast side of Morris Road. 4. The water main on Bald Hills Road is a ten inch water main on the East side of the road. 5. The sewer main will need to be ten feet away from the existing water main. 6. The gate valve housing pipe needs to be six inch SDR 21 class 200 pipe, NOT six inch SDR 35 PVC. 7. Don’t need four inch PVC pipe in the meter boxes. 8. Will need to have the appropriate backflow assembly for the hazard in this business and the irrigation system. Reviewed by: Edward Smith, John I Signed by: Edward Smith <DC90029353CCCD468AA2A2858FFCD8F5051442@server1.ci.yelm.wa.us> Del's Farm Supply 8 Feb 08 Plan Review Public Works.doc.EML Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim 458-8499 Public Works Tim Peterson Tim Peterson tim Deonne Hardy EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne deonne@ci.yelm.wa.us deonne Public Works Deonne Hardy Deonne Hardy deonne Kevin Ray EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin kevin@ci.yelm.wa.us kevin 458-8412 Public Works Kevin Ray Kevin Ray kevin Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KarenB KarenB@ci.yelm.wa.us KarenB Karen Bennett Karen Bennett KarenB John Ivey EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JohnI JohnI@ci.yelm.wa.us JohnI John Ivey John Ivey JohnI Jim Gibson Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg Jim Gibson Jim Gibson (jimg@ci.yelm.wa.us) jimg@ci.yelm.wa.us Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh Steve Harrington Steve Harrington STEVEH image001.gif .gif image001.gif image001.gif image/gif image001.gif@01C86A39.B8629E10 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C86A39.B8629E10 image003.gif .gif image003.gif image003.gif image/gif image003.gif@01C86A39.B8629E10