05-0673 Approval Letter 031808City of Yelm
arch 18, 2008
Randy Paigen
toner's Representative
P Box 625
Yelm, A. 98597
~'o unity euelapment Department
105 Yelm Auenue West
P.C1.33ox X79
Yelrfz, WA 98597
RE: Del's Farm Supply - SPR-05-Q673-YL
Approval of Construction Documents dated Jan 23, 2QQ8
r. Paigen,
After discussions with Public Works, and at your request, the City is going to approve
the plans as submitted on January 24, 2008. There are some remaining items that the
City is going to allow to be taken care of in the field during the course of construction.
The comments listed below need to be addressed during construction.
Landscape Flan:
. Add text here Please provide a ~ foot black or gray vinyl fence around the
perimeter of the storm pond keeping the landscaping on the interior side of the
fence.
(360) 4~8-~ i38
~3sa) ~~s-3x~~ F
av w. c €.,ye l . ur a. ac a
9. Please provide the City of Yel street tree planting detail on the landscape
plans, which can be found on the City of elm website.
Street Lights:
1. The street lights should match the street lights that were installed across the
street. The poles are a concrete design an are direct bury. These also do not
require hand holes and a meter cabinet. This should be a substantial savings
for installation.
Attached to this letter are the signed plans. You will need to submit the following
information before a preconstruction meeting can be scheduled,
• 4 sets of signed full size construction drawings
• 1 set of 11x17 signed construction drawings
• 1 cd with the AutoCAD electronic files
* Pay review fees
If you have any additional questions or comments please do not hesitate to call or
contact me at jimg@ci.yelm.wa.us.
Community Qevelopment Department
Respectfully,
k+~
Jim Gibson PE
Development Review Engineer
Cc Hatton Godat Pantier
Enc: Approved plans
Water Details
Sewer Details
March 98, 2008 Rage 2 of 2