Loading...
05-0673 Approval Letter 031808City of Yelm arch 18, 2008 Randy Paigen toner's Representative P Box 625 Yelm, A. 98597 ~'o unity euelapment Department 105 Yelm Auenue West P.C1.33ox X79 Yelrfz, WA 98597 RE: Del's Farm Supply - SPR-05-Q673-YL Approval of Construction Documents dated Jan 23, 2QQ8 r. Paigen, After discussions with Public Works, and at your request, the City is going to approve the plans as submitted on January 24, 2008. There are some remaining items that the City is going to allow to be taken care of in the field during the course of construction. The comments listed below need to be addressed during construction. Landscape Flan: . Add text here Please provide a ~ foot black or gray vinyl fence around the perimeter of the storm pond keeping the landscaping on the interior side of the fence. (360) 4~8-~ i38 ~3sa) ~~s-3x~~ F av w. c €.,ye l . ur a. ac a 9. Please provide the City of Yel street tree planting detail on the landscape plans, which can be found on the City of elm website. Street Lights: 1. The street lights should match the street lights that were installed across the street. The poles are a concrete design an are direct bury. These also do not require hand holes and a meter cabinet. This should be a substantial savings for installation. Attached to this letter are the signed plans. You will need to submit the following information before a preconstruction meeting can be scheduled, • 4 sets of signed full size construction drawings • 1 set of 11x17 signed construction drawings • 1 cd with the AutoCAD electronic files * Pay review fees If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Qevelopment Department Respectfully, k+~ Jim Gibson PE Development Review Engineer Cc Hatton Godat Pantier Enc: Approved plans Water Details Sewer Details March 98, 2008 Rage 2 of 2