DGWaterDetail6-124" SCHEDULE 40 STEEL OR -
REINFORCED CONCRETE MARKER
POST STAMPED WITH "W" AND
DISTANCE TO VALVE
POST TO RECEIVE ONE PRIME
COAT AND TWO COATS OUTDOOR
OIL BASE ENAMEL TO MATCH
HYDRAULIC COLOR .-~i~
CEMENT CONCRETE CLASS
-- 4..
I
3'
V -. //\`-
0. /%
a 2'
4 ~
D b
~ -_,
W
r- ~~i
P
D
a
D °:
o b.
SIDE FRONT
VALVE MARKER POST
~_ 4" DIA. (6" DIA. FOR HYDRANTS LOCATED IN
COMMERCIAL LOADING ZONES)
4" DIAMETER SCHEDULE
20 STEEL POST FILLED
WITH CONCRETE NOTE:
3• 1. LOCATE POSTS 3' FROM HYDRANT
DO NOT BLOCK HYDRANT PORTS
2. PIPE TO RECEIVE ONE PRIME COAT
AND TWO COATS OUTDOOR OIL BASE
ENAMEL (SAME COLOR AS HYDRANT-
,~ ~/~~ v ~~ SEE DETAIL 6-7)
CEMENT CONCRETE
CLASS 3000
//• }
p-.. /~
d, ~ 2.
i
HYDRANT BOLLARD
CITY OF YELM, WASHINGTON
DEPT. OF PUBLIC WORKS
VALVE MARKER POST &
HYDRANT BOLLARD DETAIL
AP~iRO V-[-B, -- DWG. N0.
PUBLIC WORKS DIRECTOR DATE 6- ~ 2
DES. DWN. CKD. DATE
Es SEC TP 4/2007