Loading...
DGSewerDetail7-9 USE 1" UNION TO CONNECT TESTING APARATUS FOR PRESSURE TESTING SERVICE FIBERGLASS LID WITH STAINLESS STEEL ANO NEOPRENE GASKET 18" MIN RISER HEIGHT TYPICAL WITH ALL NON-TRAFFIC BEARING TANKS 1" DI A.PVC HOSE AND VALVE ASSEMBLY LEAVE SUFFICIENT ORIENT BALL VALVE WIRE TO ALLOW FOR AS SHOWN. BALL VALVE PUMP REMOVAL SHALL BE WITH 12" BELOW ELECTRICAL SPLICE BO% WITH CORD GRIPS LID ALL CONNECTIONS SHALL BE MADE WITH HEAT SHRINK BUTT CONNECTORS 21" OR 24" PVC 30" DIA. RIBBED PVC RISER W/LID SLOPE GROUND AWAY FROM RISER RISER WITH NEOPRENE GROMMETS 14 GAUGE OF 10' FROM TOP OF RISER TO LC INSULATED OF ELECTRICAL CONDUIT TONING WIRE INSTALL IN 3/4" EY CONDUIT SEAL TONING WIRE - INSTALL RISER ~ ~ ELECTRICAL CONDUIT TO IN RISER POWER SOUR CE_ EFFLUENT DISCHARGE STANDARD INLET TEE T z 2-PART EPO%V, USE C ~ ORENCO RISER TANK ADAPTOR FOR CONCRETE LIOU ~ ~-ALARM TANKS -REDUNDANT OFF 0 1" PVC FLOAT ASSEMBLY AS SET BV CITY OF YELM 4„m 1-1/4" DIA. INLET HOLES AROUND z ORIFICE PERIMETER OF VAULT ~ 4" DIA. PVC FLOW INDUCER PVC BIOTUBE `SUBMERSIBLE EFFLUENT ORENCO TURBINE 10 GPM P.10 0511 OSI PUMP WITH THE MATERIAL FOR DUPLEX, TRIPLE%, AND CLASS 1 DIVISION 1 5.0. POWER CABLE AND INSTALLATIONS WILL VARY, THE CONTRACTOR SHALL MEET THE 1/B" BY-PASS ORIFICE INTENT OF THE INSTALLATION REQUIREMENTS SHOWN IN THE IN THE DISCHARGE HEAD TYPICAL STEP INSTALLATION. ALL STEP TANKS SHALL BE H-20 LOAD RATED TANKS. THIS POLICY SHALL TAKE EFFECT ON MAY 31, 2007. TYPICAL- SIMPLEX STEP TANK INSTAL-CATION APPROVED DWG. N0. \1~~ 7-9 PUBLIC WORKS DIRECTOR DATE JY ~ JEG TP I 4/2007