07-0135 Water Review Land Use 040207 From: Edward Smith
Sent: Tuesday, April 03, 2007 12:46 PM
To: Tim Peterson
Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington
Subject: Plan Review, Public Works.doc
Todays Dental Plan Review #1
City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date2/April/2007 /2007 Page
1
1 of
1
Location: Today’s Dental Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm will order and install them. The project will not be final until the City of
Yelm has received the payment in full for the fire hydrants locks.
2. What will happen to the existing water meter at 502 Yelm Ave. West?
3. What will happen to the existing water meter at 107 Solberg Street NW, or can it be used for the new building?
4. This is a medical office it will be required to have a Reduced Pressure Back flow Assembly behind the water meter.
5. Can the old water meter at 502 Yelm AVE West, be used as the irrigation system meter? And it will require a Double Check Valve Assembly behind the water meter. This
meter is a 5/8 X ¾ water meter.
Reviewed by: John I, Edward Smith,
Signed by: Edward Smith