07-0135 Sewer No 1 040108
CITY OF YELM SEWER DEPT.
April 1, 2007
Re: Civil Review #1 Today’s Dental SPR – 07-0135-YL
The existing tank at the location of the old Dental Bldg also serves the neighboring businesses. Provisions must be made to maintain service to these other business and continued service
as well. If this tank is to be abandoned, the new tank will have to be sized accordingly. The Pump control Panel for the existing tank is located on the exterior of the old Dental Bld.
as well. Provisions must be made to relocate this Panel (and power to this panel) during construction.
Please show the depth of bury for this new tank.
The Service line from the new tank to the existing Main shall be a single 2” line per our spec.
The existing Sewer Main Line that currently lies between the old Dental Office and the proposed new bldg is not shown on the drawings. This would be a more appropriate place to tap for
the new service line, due to there being no asphalt to deal with (On Solberg St).
Please show the proposed method of tapping the main for the service line.
Please include all current applicable Sewer details in the drawings.
We would prefer to have the Pump Control Panel closer to the tank location.
Please show the depth of bury for the new tank.
Please provide an outside hose bib within 50 ft. of the tank for service.
The drawings show the Side sewer entering the tank from the side. This is incorrect. Please show this correctly (SS enters at end of tanks).
Submittals for this new tank will be required to be approved by the Yelm sewer Department prior to installation.