07-0135 Water No 1 032508 From: Edward Smith
Sent: Tuesday, March 25, 2008 9:56 AM
To: Tim Peterson
Cc: Deonne Hardy; Kevin Ray; Karen Bennett; Jim Gibson; Steve Harrington
Subject: Today's Dental #1 Plan Review Public Works.doc
Today's Dental #1 From water department
City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 25 March 2008 Page 1
Location: Today’s Dental Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final
until the City of Yelm has received the payment in full for the fire hydrant locks.
2. The domestic water meter will require a Reduced Pressure Backflow Assembly on it.
3. Connect domestic and irrigation water taps to the four inch on Jefferson. This doesn’t make a street crossing.
4. The water main on Solberg St is on the Southeast side of the street, across the street from this project.
5. What will happen to the existing water services to both buildings?
Reviewed by: Edward Smith, John I
Signed by: Edward Smith