RE Step Tank Tie-Down StrappingIPM.Note
RE: Step Tank Tie-Down Strapping
RE:
Steve Harrington
Danielle Hardy
Steve Harrington
SMTP
DHardy@bcraengineering.com
Step Tank Tie-Down Strapping
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Microsoft Mail Internet Headers Version 2.0
Received: from psmtp.com ([64.18.0.79]) by server1.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.3959);
Wed, 21 May 2008 11:56:26 -0700
Received: from source ([209.147.114.185]) by exprod5mx220.postini.com ([64.18.4.10]) with SMTP;
Wed, 21 May 2008 11:55:37 PDT
X-MimeOLE: Produced By Microsoft MimeOLE V6.00.3790.4133
Content-Type: multipart/related;
boundary="----=_NextPart_000_2537_01C8BB39.95028740"
Content-class: urn:content-classes:message
MIME-Version: 1.0
Importance: normal
Priority: normal
Subject: RE: Step Tank Tie-Down Strapping
Date: Wed, 21 May 2008 11:55:34 -0700
Message-ID: <329E3375FB8D9F46A96E085A080241FF01B883C0@exch2.bcra.com>
In-Reply-To: <DC90029353CCCD468AA2A2858FFCD8F57350EB@server1.ci.yelm.wa.us>
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
Thread-Topic: Step Tank Tie-Down Strapping
Thread-Index: Aci7c9S3v8XrcykfTFWmmyLuYcmmQwAAEryw
References: <DC90029353CCCD468AA2A2858FFCD8F57350EB@server1.ci.yelm.wa.us>
From: "Danielle Hardy" <DHardy@bcraengineering.com>
To: "Steve Harrington" <steveh@ci.yelm.wa.us>
X-pstn-neptune: 0/0/0.00/0
X-pstn-levels: (S:99.90000/99.90000 CV:99.0000 R:95.9108 P:95.9108 M:97.0282 C:98.6951 )
X-pstn-settings: 5 (2.0000:2.0000) s cv gt3 gt2 gt1 r p m c
X-pstn-addresses: from <DHardy@bcraengineering.com> [19/1]
Return-Path: DHardy@bcraengineering.com
X-OriginalArrivalTime: 21 May 2008 18:56:26.0375 (UTC) FILETIME=[5EF4A170:01C8BB74]
------=_NextPart_000_2537_01C8BB39.95028740
Content-Transfer-Encoding: 7bit
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C8BB74.414E629E"
------_=_NextPart_001_01C8BB74.414E629E
Content-Type: text/plain;
charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
------_=_NextPart_001_01C8BB74.414E629E
Content-Type: text/html;
charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
------_=_NextPart_001_01C8BB74.414E629E--
------=_NextPart_000_2537_01C8BB39.95028740
Content-Type: image/gif;
name="BCRA_EMAIL_LOGO.gif"
Content-Transfer-Encoding: base64
Content-ID: <0a4fbb27a3@7f434dd4-8d25>
Content-Disposition: inline;
filename="BCRA_EMAIL_LOGO.gif"
------=_NextPart_000_2537_01C8BB39.95028740--
Danielle Hardy
SMTP
DHardy@bcraengineering.com
Steve Harrington
Step Tank Tie-Down Strapping
Steve,
Thanks for letting me know. This clears up my confusion. We will note
the strap material on the plans as fiberglass.
Thank you,
DANIELLE HARDY, LEED AP
CIVIL ENGINEERING DESIGNER
E N G I N E E R I N G
2106 PACIFIC AVENUE, SUITE 300
TACOMA, WASHINGTON 98402
T (253) 627.4367 F (253) 627.4395
Civil Engineering • Structural Engineering
________________________________
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,
is for the sole use of the intended recipient and may contain
confidential, proprietary, and/or privileged information, as well as
content subject to copyright and other intellectual property laws. If
you are not the intended recipient, you may not disclose, use, copy, or
distribute this e-mail message or its attachments. If you believe you
have received this e-mail message in error, please contact the sender by
reply e-mail, immediately delete this e-mail and destroy any copies.
________________________________
From: Steve Harrington [mailto:steveh@ci.yelm.wa.us]
Sent: Wednesday, May 21, 2008 11:53 AM
To: Danielle Hardy
Subject: Step Tank Tie-Down Strapping
Danielle: It appears there was a little bit of confusion in the
information I had been given for the tie-down strapping for the
fiberglass step tanks. Fiberglass step tanks do not require stainless
steel strapping (316 stainless steel cable type strapping and hardware)
(This is a requirement for concrete step tanks). The fiberglass step
tank manufacture recommends fiberglass strapping that is what we want go
with, the manufactures recommendation as per Randy Hatch of the City of
Yelm Sewer Dept. Sorry for any confusion on this.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<329E3375FB8D9F46A96E085A080241FF01B883C0@exch2.bcra.com>
<DC90029353CCCD468AA2A2858FFCD8F57350EB@server1.ci.yelm.wa.us>
<DC90029353CCCD468AA2A2858FFCD8F57350EB@server1.ci.yelm.wa.us>
RE%3A Step Tank Tie-Down Strapping.EML
Steve Harrington
urn:content-classes:message
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
steveh
Steve Harrington
SMTP
steveh@ci.yelm.wa.us
BCRA_EMAIL_LOGO.gif