Loading...
Todays Dental - Existing Utility InformationIPM.Note Todays Dental - Existing Utility Information Steve Harrington Jim Gibson Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Todays Dental - Existing Utility Information EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON 'dhardy@bcraengineering.com' Steve Harrington Todays Dental - Existing Utility Information Steve - We received a phone call today from BCRA. They are the engineers that are working on the plans for Today’s Dental Expansion. Would you please send the following information to her at the above email. 1. They requested the existing water and sewer line sizing around the project location. 2. They also requested the general location of the existing water and sewer locations. To my knowledge we do not have any asbuilts of this area, only the system maps that you use for the presubs. Please respond to above email and copy me on the response. Thanks Steve. Note to BCRA Engineer: Yes the City will allow the use of Stormwater Cartridge treatment system with an infiltration trench. This is the typically method of meeting the UIC requirements. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 jimg@ci.yelm.wa.us <mailto:jimg@ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F55D1559@server1.ci.yelm.wa.us> Todays Dental - Existing Utility Information.EML Steve Harrington 11.0 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh 458-8423 Community Development Steve Harrington Steve Harrington steveh 'dhardy@bcraengineering.com' SMTP dhardy@bcraengineering.com dhardy@bcraengineering.com 'dhardy@bcraengineering.com' dhardy@bcraengineering.com