Loading...
07-0135 BCRA Cmt #3 Ltr 110408November 4, 2008 M e City of Yelm Community Development Department Steve Harrington Engineering 1 Civil Inspector 105 Yelm Avenue West P.O. Box X79 Yelm, WA 98597 Re: Today's Dental -City of Yelm Project Number - SPR-07-0135-YL Response to Review No. 3 Comments Dear Mr. Harrington: 0 Z Y a' 3 a 0 V Thank you for your review of the Today's Dental civil drawings. We received your review comments letter, dated October 14, 2008, and have revised the plans accordingly. Enclosed are four revised sets of plans for your approval. The review letter dated October 14, 2008 has been included as an attachment. Below are detailed responses outlining how each of your review comments has been addressed in the civil plan set. Storm: 1. The stormwater management system has been designed based on the 9992 Department of Ecology stormwater Manual. This was the direction given in the Staff Report that was issued on July 12, 2006 by the City of Yelm Community Development Department. Refer to the attachments far a copy of the Staff Report. As required by the 9992 Department of Ecology stormwater Manual, the StormTech Chambers need to be a registered Underground Injection Control (UIC} well. The registration form was completed and submitted to the Department of Ecology on October 27, 2008. Refer to the attachments for a copy of the registration form. STEP Sewer: 2, The proposed Xerxes® STEP tank is H-20 load bearing rated, and is therefore acceptable to place under the drive surface within the parking lot. This was discussed and agreed upon during previous conversations between BCRA and the City of Yelm. Refer to the attachments for a copy of the email correspondence pertaining to this issue. 3. ]t is understood that shop drawings specific to the proposed STEP tank are required to be submitted to the City of Yelm prior to ordering BCRA F~E~~wf1~ EJ and installation. This will be done to ensure that the City's design standards are met and to provide value engineering to the developer. However, since a contractor has not yet been chosen for the project, it was agreed that shop drawings will not need to be submitted during the plan approval process in order to obtain a site permit. This was discussed and agreed upon during previous conversations between BCRA and the City of Yelm. Refer to the attachments for a copy of the email correspondence pertaining to this issue. 4. The existing STEP tank will remain in place until the proposed STEP tank is installed and fully functional. Once the installation of the proposed STEP tank and sewer fines are complete, the existing STEP tank will be decommissioned in accordance with the Thurston County Health Department requirements. It will also be filled with pea gravel. Multiple sheet notes on sheet C11.01 have been revised to better clarify the phasing of the two STEP tanks. The existing STEP tank serving parcel No. 21724142200 serves only that parcel. It will be decammissioned as described in sheet note #17 on sheet C11.01. 5. A sheet note has been added to sheet C11.01 that describes the necessary protection measures for the existing STEP tank. 6. The proposed side sewer pipe labels have been changed to indicate that they are to be SDR35. This can be seen on sheet C14.01. 7. Please refer to comment #3 on the previous page. 8. The inlet to the proposed STEP tank will be at an elevation of 345.10 feet. The highest rim will temporarily be at an elevation of 349.79 feet (during Phase 1 only). It will be graded to a lower elevation during Phase 3. The difference between these two elevations, or the depth of bury, is 4.69 feet. This is less than the maximum cover allowed, five feet. Information pertaining to this issue can be found on sheet C14.01 and in detail D of sheet C04.12. 9. An additional sewer line has been added to sheet C14.01 that is intended to connect to the existing side sewer that serves the adjacent property. See sheet note #11. 10, Sheet note #6 on sheet C31.01 has been modified to direct the contractor to protect the existing 2" pressurized sewer line and cleanout. 11. The check valve assembly and corresponding sheet note have been removed from sheet C14.01. 12. Sheet note #6 on sheet C14.01 has been revised such that it no longer describes the service line as running uphill to the sewer main. 13. It was discussed and agreed upon between the City of Yelm and BCRA, that the proposed location and means of mounting the pump control panel are both acceptable. Refer to the attachments for a copy of the email correspondence pertaining to this issue. Landscape and Irrigation: 14. The civil site plan contains 22 parking spaces. Please note that a single parallel parking stall located near the one-way exit is included in this count. Refer to sheet 000.01. 15. Sheet A1.02 has been included in the set. This architectural sheet shows the plans for corner enhancements. 16. Sheet A1.02 has been included in the set. This architectural sheet shows the plans for the refuse enclosure. Refer to the attachments for a copy of the dumpster pad location approval letter. 17. Sheet note #5 on sheet C22.01 has been revised to indicate that the fence is to be a 6 foot-tali, 'wood' fence. A callout has also been added to sheet L1 for the 6 foot-tall, `wood' fence. 18. The owner will complete a Waiver of Protest and a Right-of-Way Dedication Deed for frontage improvement deferral. These will be completed prior to permit issuance. Please do not hesitate to call me at (253} 627-4367 if you have any comments or questions. Sincerely, Lucas J nson, E.I.T. BCRA Engineering Attachments: Review No. 3 Letter Staff Report UIC Well Registration Form Email Correspondence Dumpster Pad Location Approval Letter