Loading...
07-0156 Sewer No 1 042208 CITY OF YELM SEWER DEPARTMENT April 22, 2008 Re: 1st Civil review Ft Steven’s Elementary School Remodel SPR-07-0156-YL STEP Tank depth of bury not to exceed 60” from top of upper most riser lid to invert of inlet pipe to tank. Is this a duplex pump system? Manholes need to be constructed in such a way as to allow NO infiltration. Prefer to have no man holes or piping through the manholes with clean-outs available within the manholes. No clean out needed at end of service line. Hose bib req. w/in 50’ of tank Supply calculations supporting this proposed tank size. Need full set of submittals on this proposed tank.