FW FW 06181 Fort Stevens OnsiteIPM.Note
FW: FW: 06181 Fort Stevens Onsite
FW:
Steve Harrington
Grant Beck
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT
FW: 06181 Fort Stevens Onsite
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT
Steve Harrington
FW: 06181 Fort Stevens Onsite
Please have Karen print out the new drawings and hand deliver them to
Tim/Jon
Thanks,
Grant
________________________________
From: Jon Yanasak
Sent: Wednesday, July 23, 2008 3:42 PM
To: Grant Beck; Tim Peterson; Steve Harrington
Subject: RE: FW: 06181 Fort Stevens Onsite
I have been discussing corrections to the design with the engineer and
everything has been resolved verbally. If the new drawings (when they
get here)actually reflect all of the issues discussed and seen on the
attached drawings sent electronically, than we should be good to go with
this sewer latch-up. Rocky asked that I let CDD know where we're at with
this.
Jon Yanasak
City of Yelm Sewer Dept. Mgr
Po Box 479
Yelm Wa 98597
Phone 360-458-8411
Fax 360-458-8166
jony@ci.yelm.wa.us
-----Original Message-----
From: Grant Beck
Sent: Wednesday, July 23, 2008 3:15 PM
To: Jon Yanasak; Tim Peterson; Steve Harrington
Subject: FW: FW: 06181 Fort Stevens Onsite
Tim and Jon -
Please let Steve know if you have any concerns with the revised design
and he will get back to Rocky. Can someone also let Steve know about
the backflow device as well so we can answer that question?
Thanks,
Grant
-----Original Message-----
From: Rocky Birkland [mailto:ebirkland@ycs.wednet.edu]
Sent: Wednesday, July 23, 2008 3:02 PM
To: johny@ci.yelm.wa.us; Grant Beck; Tim Peterson; Steve Harrington
Cc: scott@jwmorrissette.com; ray@ericksonmcgovern.com
Subject: Fwd: FW: 06181 Fort Stevens Onsite
Grant,
Attached are drawings reflecting the revised grading around the step
tank at Ft. Stevens Elementary. Please review and comment as soon as
possible.
In conversation with Scott it was noted that on the latest comment
letter an RPBP was added to the domestic water system. The site does not
have reclaimed water and as such is this devise required?
Please advise.
Rocky
----- Original Message -----
Rocky,
Please see the attached concept for the STEP Tank revisions at Ft.
Stevens Elem.
F.Y.I. John will only be at his office until 4:00 this afternoon.
Thanks,
Scott Severs
J.W. Morrissette and Assoc. Engineering Inc., P.S.
========================================================================
===
From: Rick Weeden [mailto:rick@jwmaeng.com]
Sent: Wednesday, July 23, 2008 2:14 PM
To: Scott Severs
Subject: FW: 06181 Fort Stevens Onsite
========================================================================
===
From: Rick Weeden [mailto:rick@jwmaeng.com]
Sent: Wednesday, July 23, 2008 2:08 PM
To: Scott Severs (scott@jwmorrissette.com)
Subject: 06181 Fort Stevens Onsite
Scott,
Attached are sheets C2.0 & C2.4 in a pdf format. If you have any
problems
let me know.
Rick
<DC90029353CCCD468AA2A2858FFCD8F57CB7C2@server1.ci.yelm.wa.us>
FW%3A FW%3A 06181 Fort Stevens Onsite-2.EML
Steve Harrington