Loading...
Ft Stevens Elementary - 2nd Review LetterIPM.Note Ft. Stevens Elementary - 2nd Review Letter Steve Harrington Jim Gibson Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Ft. Stevens Elementary - 2nd Review Letter EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Karen Bennett Nisha Box; Tami Merriman; Steve Harrington; Gary Carlson Ft. Stevens Elementary - 2nd Review Letter I went thru all the review comments and conditions of approval for the project and anything else that might be outstanding for this application. I have added a section in the letter about “conditions of approval”. Would you take a look at this and let me know if there is anything else out there that you are aware of? I will be sending this out tomorrow. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 jimg@ci.yelm.wa.us <mailto:jimg@ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F5735479@server1.ci.yelm.wa.us> Ft. Stevens Elementary - 2nd Review Letter.EML Steve Harrington 11.0 DRAFT 07-0156 Review 2 052908 DRAFT 07-0156 Review 2 052908 Nisha Box EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Nishar nishab@ci.yelm.wa.us nishab 458-8430 Community Development Nisha Box SMTP nishab@ci.yelm.wa.us Nisha Box nishar Tami Merriman EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tami tamim@ci.yelm.wa.us tamim 458-8496 Community Development Tami Merriman Tami Merriman tami Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh 458-8423 Community Development Steve Harrington Steve Harrington steveh Gary Carlson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gary garyc@ci.yelm.wa.us gary 458-8407 Community Development Gary Carlson Gary Carlson Gary Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KarenB KarenB@ci.yelm.wa.us KarenB 458-3835 Community Development Karen Bennett Karen Bennett KARENB DRAFT 07-0156 Review 2 052908.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 May 29, 2008 Trent J. Lougheed JWM&A 1700 cooper Point Road S.W. # B-2 Olympia, WA  98502-1110 RE: Ft. Stevens Elementary School Remodel and Play Shed – City of Yelm Project No. SPR-07-0156-YL – Review #2 of Civil Construction Documents Dear Trent: The City of Yelm has completed the second review of the proposed Ft. Stevens Elementary School Remodel and Play Shed. Your application included: Construction Documents Hydrant Flow Test Sheets Step Tank Submittals Landscape Plans We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments are from Community Development (Engineering), Water, Sewer and Public Works Departments only. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Water Comments: Maintain separation between water and sewer as noted on print. Sewer Comments: STEP Tank depth of bury not to exceed 60” from top of upper most riser lid to invert of inlet pipe to tank. Manholes need to be constructed in such a way as to allow NO infiltration. Prefer to have no man holes or piping through the manholes with clean-outs available within the manholes. Vacuum Test Manholes to ensure water tightness. Waterproof, Bolt down lids on Manholes Hose bib req. w/in 50’ of pump end tank, this is used for servicing the pumps and pump screens, etc. Please. Supply calculations supporting this proposed tank size. Need full set of submittals on this proposed tank. Side sewers to be leak tested. Existing Grease Trap to be leak tested. Service line to be sleeved instead of encased in concrete. Line from pumps in Tank to main on 100th Street is Service Line not force main. Landscape and Irrigation Comments: Right of Way dedication deed is required for the deferral of frontage improvements and needs to be recorded prior to civil plan approval Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Respectfully, Steve Harrington Civil Engineering Inspector (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc DRAFT0~1.DOC DRAFT 07-0156 Review 2 052908.doc