Ft Stevens Review #3 LtrIPM.Note
Ft Stevens Review #3 Ltr
Steve Harrington
Karen Bennett
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB
Ft Stevens Review #3 Ltr
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Karen Bennett
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB
Steve Harrington
Ft Stevens Review #3 Ltr
S, here is Ft. Stevens DRAFT Review #3 letter. Trent has been in this
morning and would like to pick up that letter and also has some
questions that he needs to ask you. Please give him a call at
360-481-4143. Thanks and smile, K
Karen T. Bennett
Permit Coordinator/Admin Support
City of Yelm/Community Development
PO Box 479, Yelm, WA 98597
360-458-3835
karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us>
<DC90029353CCCD468AA2A2858FFCD8F57CB6AB@server1.ci.yelm.wa.us>
Ft Stevens Review %233 Ltr.EML
Steve Harrington
11.0
07-0156 Draft Review Ltr #3 071808
07-0156 Draft Review Ltr _3 071808
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
458-8423
Community Development
Steve Harrington
Steve Harrington
STEVEH
07-0156 Draft Review Ltr #3 071808.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
June 18, 2008
Trent J. Lougheed
JWM&A
1700 Cooper Point Road S.W. # B-2
Olympia, WA 98502-1110
RE: Ft. Stevens Elementary School Remodel and Play Shed
City of Yelm Project No. SPR-07-0156-YL
Review #3 of Civil Construction Documents
Dear Trent:
The City of Yelm has completed the third review of the proposed Ft. Stevens Elementary School Remodel and Play Shed. Your application included:
Revised Construction Plans
STEP Tank Submittals
STEP Tank Sizing Calculations
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following
comments are from Community Development (Engineering), Water, Sewer and Public Works Departments only. The following comments need to be addressed before the plans may be approved for
construction. Our comments are summarized below:
Sewer Comments:
The Sewer Service Line on the plans still show the service line as being called a “FM” (Force Main). If this has been corrected, it is not on the plans that were submitted.
.STEP Tank depth of bury not to exceed 60” from top of upper most riser lid to invert of inlet pipe to tank. (Plan Shows 96+ inch bury).
Need full set of submittals on this proposed tank.
Supply calculations supporting this proposed tank size.
Step Tank needs 1 additional riser over the solids portion of tank.
Service line to be sleeved instead of encased in concrete.
Line from pumps in Tank to main on 100th Street is Service Line not Force main.
Purpose of existing manhole N.W. of New Manhole #3 is unclear. Can it be abandoned? Otherwise, integrity will need to be tested.
Supply all details pertaining to this project.
Would like to see hose bib closer to pump end of tank.
Water:
Install Reduced Pressure Backflow Assembly behind domestic water meter.
Maintain separation of water and sewer as shown on print.
Landscape and Irrigation Comments:
Landscape plans were approved in Review 2. Please submit a set of the final landscape plans.
Miscellaneous:
We need the submittals as requested in Comment # 4 from Review # 2.
Detail for Encasement still shows concrete and being used for the encasement.
Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project
engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our
review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us.
Community Development Department
Respectfully,
Steve Harrington
Civil Engineering Inspector
(360) 458-8438
(360) 458-3144 FAX
www.ci.yelm.wa.us
.doc
07-015~3.DOC
07-0156 Draft Review Ltr #3 071808.doc
image001.wmz
.wmz
image001.wmz
image001.wmz
application/x-ms-wmz
image001.wmz@01C8EBF2.BF0C5A90
image002.gif
.gif
image002.gif
image002.gif
image/gif
image002.gif@01C8EBF2.BF0C5A90
oledata.mso