Loading...
Ft Stevens Review #3 LtrIPM.Note Ft Stevens Review #3 Ltr Steve Harrington Karen Bennett Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB Ft Stevens Review #3 Ltr EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB Steve Harrington Ft Stevens Review #3 Ltr S, here is Ft. Stevens DRAFT Review #3 letter. Trent has been in this morning and would like to pick up that letter and also has some questions that he needs to ask you. Please give him a call at 360-481-4143. Thanks and smile, K Karen T. Bennett Permit Coordinator/Admin Support City of Yelm/Community Development PO Box 479, Yelm, WA 98597 360-458-3835 karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F57CB6AB@server1.ci.yelm.wa.us> Ft Stevens Review %233 Ltr.EML Steve Harrington 11.0 07-0156 Draft Review Ltr #3 071808 07-0156 Draft Review Ltr _3 071808 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us 458-8423 Community Development Steve Harrington Steve Harrington STEVEH 07-0156 Draft Review Ltr #3 071808.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 June 18, 2008 Trent J. Lougheed JWM&A 1700 Cooper Point Road S.W. # B-2 Olympia, WA  98502-1110 RE: Ft. Stevens Elementary School Remodel and Play Shed City of Yelm Project No. SPR-07-0156-YL Review #3 of Civil Construction Documents Dear Trent: The City of Yelm has completed the third review of the proposed Ft. Stevens Elementary School Remodel and Play Shed. Your application included: Revised Construction Plans STEP Tank Submittals STEP Tank Sizing Calculations We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments are from Community Development (Engineering), Water, Sewer and Public Works Departments only. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Sewer Comments: The Sewer Service Line on the plans still show the service line as being called a “FM” (Force Main).  If this has been corrected, it is not on the plans that were submitted. .STEP Tank depth of bury not to exceed 60” from top of upper most riser lid to invert of inlet pipe to tank. (Plan Shows 96+ inch bury). Need full set of submittals on this proposed tank. Supply calculations supporting this proposed tank size. Step Tank needs 1 additional riser over the solids portion of tank. Service line to be sleeved instead of encased in concrete. Line from pumps in Tank to main on 100th Street is Service Line not Force main. Purpose of existing manhole N.W. of New Manhole #3 is unclear. Can it be abandoned? Otherwise, integrity will need to be tested. Supply all details pertaining to this project. Would like to see hose bib closer to pump end of tank. Water: Install Reduced Pressure Backflow Assembly behind domestic water meter. Maintain separation of water and sewer as shown on print. Landscape and Irrigation Comments: Landscape plans were approved in Review 2.  Please submit a set of the final landscape plans. Miscellaneous: We need the submittals as requested in Comment # 4 from Review # 2. Detail for Encasement still shows concrete and being used for the encasement. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Respectfully, Steve Harrington Civil Engineering Inspector (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc 07-015~3.DOC 07-0156 Draft Review Ltr #3 071808.doc image001.wmz .wmz image001.wmz image001.wmz application/x-ms-wmz image001.wmz@01C8EBF2.BF0C5A90 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C8EBF2.BF0C5A90 oledata.mso