RE Blocked attachment Brown BLA #20180425Tim When Staci called me about the BLA, we discussed what was being proposed. I informed her on the phone that the City was concerned that moving the property line would not meet setback requirements of the stormwater management manual. I requested that an engineer provide documentation with the application showing how the new setbacks meet the most current Stormwater Management Manual for Western Washington. The application was submitted without this, so we are now having to make that determination ourselves. Tami Merriman, Associate Planner Community and Economic Development 106 2nd Street SE Yelm, WA 98597 360.458.8496 tamim@yelmwa.gov From: Tim McDaniel <mcdaniel@apexengineering.net> Sent: Monday, January 28, 2019 10:52 AM To: Tami Merriman <tamim@ci.yelm.wa.us>; Staci Saunders <saunders@apexengineering.net> Subject: RE: [Blocked attachment] Brown BLA #20180425 Tami, I did receive your note about checking the pond/swale with regards to the new property line, but I did not know this was a requirement of the BLA submittal. We had one of our engineers look at the new line location in regards to the pond and determine that the new line does not affect the slope. There is still ample room behind the outermost pond grading and the new property line for maintenance purposes. This does go back to your comment about making the building setback line more or less nonconforming. Our understanding of the whole need for this BLA was the fact that the existing building did not meet the setback line. Mr. Brown hired us to perform the BLA as he was instructed by the city that his building was non-conforming. I am not sure how in the process of getting the building permitted, built and inspected that it was placed too close to the property line, but that is the situation. The reality is that there is not 20’ between the existing building and the outermost extent of the pond grading, so if the intent is to bring the building into conformance along the 10’ building setback line by dong the BLA, then the pond will not also be 10’ from the new property line. It is not currently 10’ from the existing property line so already non-conforming. As the pond is a shallow swale and pond (2-3 feet in depth max) the future maintenance can be performed without having a 10’ setback from the property line. Was the applicant made aware that you would be charging peer review fees outside of the BLA review fee? Our assumption was that the BLA application and review fee would actually cover the review of the BLA. As I noted above, I don’t think an additional engineer review is necessary to tell you that the pond and the building both cannot meet the 10’ setback from the new property line. Please advise on the process moving forward as the purpose of this BLA was to bring the building into conformance at the city’s request. Thank you. Timothy McDaniel, PLS, CFedS Survey Manager 2601 S. 35th St. Ste. 200 | Tacoma, WA 98409 | O 253.473.4494 x1198 | F 253.473.0599 mcdaniel@apexengineering.net <mailto:mcdaniel@apexengineering.net> www.apexengineering.net <http://www.apexengineering.net/> From: Tami Merriman [mailto:tamim@ci.yelm.wa.us] Sent: Monday, January 28, 2019 10:05 AM To: Staci Saunders Cc: Tim McDaniel Subject: RE: [Blocked attachment] Brown BLA #20180425 Staci The BLA is being reviewed by our engineer. The engineer is determining whether the new boundary line will meet setbacks for the pond and swales. While they may not currently meet setbacks and be nonconforming, I cannot approve this if it makes the setbacks more nonconforming. That is why I requested this information from you with application. As it was not submitted, we are doing the review ourselves and will submit peer review fees with our reply. Tami Merriman, Associate Planner Community and Economic Development 106 2nd Street SE Yelm, WA 98597 360.458.8496 tamim@yelmwa.gov <mailto:tamim@yelmwa.gov> From: Staci Saunders <saunders@apexengineering.net <mailto:saunders@apexengineering.net> > Sent: Thursday, January 24, 2019 12:53 PM To: Tami Merriman <tamim@ci.yelm.wa.us <mailto:tamim@ci.yelm.wa.us> > Cc: Tim McDaniel <mcdaniel@apexengineering.net <mailto:mcdaniel@apexengineering.net> > Subject: [Blocked attachment] Brown BLA #20180425 Hi Tami, I just wanted to check in with you to find out when you think this BLA will be reviewed? If you could let me know, I would appreciate it! Thank you, Staci Saunders Project Expeditor 2601 S. 35th St. Ste. 200 | Tacoma, WA 98409 | O 253.473.4494 x1218 | F 253.473.0599 saunders@apexengineering.net <mailto:saunders@apexengineering.net> www.apexengineering.net <http://www.apexengineering.net>