RE Please send comment to meHi Tami,
This email is in regards to the lot subdivision with project name ‘The Hutch’, 118 lot Subdivision located at 9306 Mountain View Rd, Yelm, WA 98597, land use case # 20180280.
I would like it to be put in record that I am the property owner of 9225 Killion Rd SE, Yelm, WA 98597 and I have concerns with the development of this property that could affect my
use of my property as well as the value of my property now and in the future.
Pre-development: the plot of land proposed to you for development has been used to grow grass hay for at least the last 13 years that I know of. As a result this property is filled with
rodents of just about every kind from field mice to moles. I am concerned that once heavy equipment is brought in and earth is moved that these vermin will scatter to any neighboring
property, mine being one of them. This last summer I had a pocket gopher study done to my property in order to put in a family member unit. I was told by the State Wildlife Department
and the Thurston County Inspector which made multiple trips to inspect my property for pocket gophers, that they have documented Pocket Gophers 600 feet away to the south of my property.
This would put a Pocket Gopher population on the south end of the subject property. This greatly concerns me as the Land Developer would be driving heavy equipment and working out of
the south end of the property in order to develop the north end. This would again send these vermin migrating. So before anything is done to that property I would want a above ground
and below ground vermin barrier put in to stop any potential migration of any kind. From what I read a proper vermin barrier would be buried a minimum of 24 inches below the ground
and extend a minimum of 24 inches above the ground. The barrier itself should be durable enough to stop the smallest of rodents from either burrowing or running across the ground. Additionally,
it should cut back into the subject property to prevent rodents from going around it.
I would also be concerned on the time of day and days of the week I would have to put up with noisy and heavy equipment that could create stress on my family members, animals, and the
improvements on my property that could be damaged because of continuous vibration of the earth. I would probably be okay if the time of this construction was limited to 9 am to 5 pm
Monday through Friday and that the contractor put in writing that they would fix any and all improvements to my property that were displaced or damaged as a result of the use of heavy
equipment.
To this date, I do not have and have not been given a site plan to see just how the layout of this community would look. Can you please provide me with the proposed one so that I can
comment on any concerns that I may have around the layout of the community? For now, I would like to point out that 118 lots on less than 20 acres that would require basic infrastructure
i.e. roads would make for extremely small parcels and small homes. This brings upon several concerns that I would like addressed. The first one is what this would do to the value of
my property having small homes on small lots with low values could result in loss of value to mine and my neighbor’s property. As a real estate agent I have the ability to estimate
that loss to be as high as 15% of the value of my property. With a current market value of $345,000 that would put my losses at $51,750. In order for me not to suffer loss in value,
the lots would need to be a minimum of 5,000 sq ft with homes no smaller than 2,000 sq ft. I am also concerned with the size of the lots, 118 homes would be, that the setback from the
street would put the homes at or less than the minimum county setback of 5 feet from my property. I would prefer any home placed in that field to have a setback from my property line
of at least 15 feet. This may sound a little restrictive but I am betting that there could be as many as 20 homes placed along my property line. Each one of these homes occupied by
a family with pets would create quite a bit of noise and stress to my family and animals, not to mention the potential for those occupying to throw debris/trash into my yard creating
problems that I and my family will have to deal with. In addition to the 15 foot setback, the land developer needs to put a permanent barrier/fence between those lots/homes and my property.
Currently right now the only thing that separates our two properties is a double stranded barb wire fence. On my side, I have a in ground wire transmitter that restrains my animals
from leaving my yard. I have used this for the past 13 years and it has worked just fine. All these new homes would come with pets that could enter my yard and do damage or injury
to my property and my pets and possibly even my family. This is why I would request a permanent and durable barrier, not just the standard 6 foot wooden privacy fence stapled together
with a life span of about 3 years as we’ve seen from the construction across the street in the Cherry Meadows community. This barrier would also need to provide privacy as well.
As for the water issue, I am also concerned that even though this community is being fed by Yelm City Water, the water shed coming from this property and from rain that feeds the ground
water could adversely affect my well in numerous ways. First, like many, I am concerned that the city of Yelm continues to exceed their water rights and one day my well may dry up leaving
my property without a source of water. As a property owner in the unincorporated area of Thurston County, I do own the water rights to my property and will not stand for over use of
Yelm City Water Rights in order to approve more developments. Should this occur, me and my neighbors would be forced to seek relief through the courts. It also concerns me that again
with the water run off of this property going to the storm water system instead of draining through the ground to the water table, this can have an adverse effect on my well.
While I understand some of the infrastructure i.e. electric, water, sewer, storm water and telecommunication lines were stubbed out to this property at the time Killion Rd was improved
by the city of Yelm during the first phase of the bypass, I may have concerns depending on how that infrastructure would be ran throughout this community and request that information
so that I can express any concerns I may or may not have.
Traffic: 118 new homes will bring with it an increase in traffic on Killion Rd, which runs right in front of my property. This is a concern because the bypass which was supposed to relieve
traffic has not been finished and as a result would increase noise to my property. This additional traffic could have other unforeseen consequences that I would like looked at and addressed
prior to development of this property. I would like to see entrance and exits to this development on both sides of the development. One on Killion and one on Mountain View Rd as a minimum.
In closing I would like you and everyone involved to know it is not my intention to stop the development of this property. However, the above concerns need to be addressed before I can
give my blessings. In your letter, dated Oct 31st, it gives me 15 days to add comments and concerns and while I have expressed some of those, I have not been given full information
needed to fully consider the impact it could have on my property i.e. I have not received the proposed layout of subdivision with infrastructure and lots. Additionally, I have not been
given proper contact information to the land developer or the owner in order to express and possibly work out concerns with them. In the letter I received, while it named a contractor,
the address listed belongs to a car dealership and not a land developer. There are no phone numbers and you Tami are my only contact at the time of this email. If this is the information
that was given to you, I have to question why incorrect information would be put on a permit request. Please provide updated contact information when you get it. You may also share
my contact information below with the owner and contractor of this project. They are welcome to contact me anytime. I think that all will find I am easy to work with as long as we can
address my concerns.
Thank you and please reply so that I know you have received this email,
Neal
Your referral is the greatest compliment we can receive! It would be our honor to be a resource for you, your family, friends and coworkers.
From: Tami Merriman <tamim@ci.yelm.wa.us>
Sent: Wednesday, November 7, 2018 8:54 AM
To: neal@nwdreamhomes4U.com
Subject: Please send comment to me
At this email address.
Tami Merriman, Associate Planner
Community and Economic Development
105 Yelm Ave. W
Yelm, WA 98597
360.458.8496
tamim@yelmwa.gov <mailto:tamim@yelmwa.gov>
ОႼ㖫韴ថ맱螧ꤕ씼ᓓ旓ा�珙日黏完礮穲처栢鳤⠁혁桕䋟겒꠹輠ꆣ㕿㌳팳팵跚�ሙꑥ㳰㋲釁춎⢙나藊醠䓀첊륑銛륀ṣ嶊殞깘�諭�뎻��윤ⲵ軉骮鞕圧摑�횁⹅Ꮗ機똮ﺔ꾭潴뜫苁妳绾洩ѹꍎꗠ肙뇴퓴燸ꍚ믇⎆흴飢隣氜獌琞餛托ᬪᰧ嚹穯滶몡Ẏ熋핑鹆ᇩ吟ᶄ뢷瀲�ꀉ㎃谓鑼ꬮᨨ깵꒒밒봈袏嶫晥㛍⧅ḓꗔ㷯燍ᆖ〆荥ᄣᅧ焅倆䦐ਘ⡂昆ꔫṁᗎ刷趔ᾓ꼉ᱪﺻ뽴꠵㳌빽͛쟾ꄗ럓괟헽紮溵月辈㮕읽溸줰䀖⒌
貍ꇍ㝈쟄棹俼珪틵⋛縓깫侊ꪳ鰨䮻㚗䱎뤘☯덂굅鹡歛虨䞮疭쫡ᩅ㝏쵴≦꽵傺릓䇷⸾㉃㛉伫䠢鋠鋍遉ế☷㿃媯㺼�燱뇱払នᤞ�ጉ䭒崉ᜤ䆀∖Ꮥ▎䐗瑄齆唽�ꞹᴲֿ卤挛蜎师䨢်觚릹嫖㟾劬鮲챳才來䕬�䲷쥷鵵늙碢ⱥ我樬졦ⶕ瓋嵗邩軷ᛥ䀢옡፩尒鐁�赣㰲㵦띗Ⓔ䠺뢽乔쳱ᇝ㙍Ả짨꾏쌙鏄⌏徢ꈅʴ瑌ꓩꪪ镕们ྡྷ玽乺䘴詹ᓩ躞ឍ혭墴⟇搝㱌Ⴣ겤囌먢T㇒翓푶傜玴䘷웪�䏮�鴀俨㿷ﳝﮏ�麺月俣ᙕᵷ⟓汰鱶㠨
쟢室嘚俼鬚ꉭ줯刷ᆽ㩄㊳䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ᝁエ瀀ﶗ著륂鿹韣鸿迟⳩兌ꂒ꿰뇄몺콏뭏ἠ檲감㧆ẏ쩞䤥�ꊈꕑ춆졣⛲䚈윍㰕難ቅᦻ䔺퇸ᚶﷰሔᬱ㥹猎≣龄鉱ڽꖦ엮鶇툔쯻튗굆㚪췓翵턻䑈心�량༌좓괇攜聾ᇾ罞謱殆Ἓ群ﺭ쵓署넥絏狳⟇蹮嫼瘟ꇾ�귮⾱맏㺼欞⣝荐Ꮾヌ鱕ꓬቱծ铨勵꒸쪑撠۶蓕ﻇﺰ庁➧糶㍟迹迥ﷱ鿥뛚궜槎얡旒আ瑲넱腥踌脓榻䁒鮮ꎮ쟍澎䚚ﳪທ링耍앯鏳臲㑵빫�⊰髾㢎籊렛X똀媴盝鶬
⦳牱凌졌益텄説삭셻屜�兵Დ㓙䮖댃㏳〱屧䣌�鞙ᨇᥩ鄤晴ݶ䱇록䰍댪⊒�컖湚骈헇蒱⦖锢釢쥊ᔛ㱵⧃ᖱ㱷㓅蘡ᢎ咗낲幄샆擒겈金ﳜ犩듔큘㙠천�兄▱謚ᔳ唺♁㞫糄�暆ᒽ旚ﹶ၄擤並嘶㨾㰮솺넒쩠뱮쁕謴냋䓌拍ᡢ뮺茔纆晀ꉵ钱탃㫖ᓜ븶㶟洜펫嵑뽨锎ꥇ陑ﯚ屺ৼ�ᬯᘏꌉ槇夲깊ꏪ䥂뇺㪷棒ớ먙䟄Ꮅ�寮㊰⻔фਇ铁⬫舋䠙퐠瓛噌줔�鴴閨ᥥ윭̬夿鍕焝垞롆㤟騐옑ḏ⨜粑孋�歭仑겸⎏熬瞩ᕲ䔑⟉댊訸늳并꿦㨦扤맍걂淓
첑ℛɴ뛎蚶tᗝ窋㾫㸖褎껥壙�웒᭮乞챈峇璨ﶛ際繑較檸痱彙涎窥ꡢ晵ѥ㲌鈳ɦꅨ쓨Ᏻ萳ꃕ䉟縻䳔篑ꩭ䨽ʅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ䝐Ü鈸쬃ﶇ尡쿼쯱쾟읯雴䨭荛꽰룐뺬溑䕟ꐅ鍠皜ᬼ暌�쐒ଘ珸퓶ᤥ撣騾䀡 芢虊�訾␒⊋㪛ꤛÿꁁ犘㏲焌衣毣瞱셱絔啥ܾ勓䝃諍뭭陽䉼ꛇ駁┏驾텅䝇촥쯟띦鬭鹭隮쥨嘞눌湆疮႟㱫ㄱ❭햡賹撖滦쾾襁왜⽣ꂼ횟欜顧⫎抨댾ݺ퓲甥뿺�禕ℚ�퀷Ѯ径ᗨ狪板饟壾ÿ�❛몿쐝再쳣㊭
푾�t夀ᔉ緑覵鮇➃汿ﴝ嫻ÿ⸫疮쏽爬ﺚ邖䂼ࣺ⚬멃윯ﻗ劺疽髽禮枼녮杧镉㼍ꢎ䍶슥笢実귨뚭鄢独쥥쐷瓍뚛洶熇䷇랛䤊Ꮅ똜野큄좆ਬ愨쏻뵈囹�㢾ﭬ굴텫ﴖ䆶䞷턖躑ꍱⲟ፮ো䟉骙鸧뜴ی䪇쳚݁부줦ꦮ澱㇓쵊㭫ꋟ�Ⓙ瘛釋䘱�ᱝ䱌톂⮲덽豉㐔⨲혖돷웟꧷㖛㚝寕툲曛ꕮ㐦黎퇩菙蝶�睳ꒈ泎커쫁ೋ⪱Ὁ걇⩵圕甅㰝χ汓鍒퀑䮮曫磭᪫嗵솎鏈헝眱㽈䱸욘〹ⳤ싈奒孒砏ሯ鏑囧페癆蟏푭㢺�绽
댌䷮㥯渧ꋺꨎ鄲ᙧ�田띈봚땶ᙧ곬㕖寽鋝朦㱝�忭ﭭ㺶㝲쇫ᯒ銜팗痮�鶾펯뇹䀹벼㠪Ꜯ寬쟅녝翷�࿕�珲碿ჯ濦掲뭆獾뵥䒑꓅軔㊛ӱ⼿酴啻뚮鐦㾍薮馘뫢펷꽉窷㮩檛ជ䴾ៃ爇㝹봭쏧酥씢料᪕嫪運촙뇔货仯갉녒鎤�溋귺넩뇯맂ܧ앴㺛왜짉雋衳쌧ꍸ痹ṡ䒐嵚ṟ㔥൞ꗱ꼿듼뒌⺭횊榻퉘⺟ᳪ答搖渒♉昮嬞腃ꌱⳉ䛲袋剪䒣쎮࿀䱅ퟄ勯똯頬鎮ꔓ꽴�贻滟營郌ይꭆ抐ᙙ뼝隣抉੭啯촢晢︷뾩팷孴㹵鿎㓾ᦕ윝뚅
ᗮ壟퓻맘꒻댶됦䦺쫰诈䕚㖓ꊷ縿仄띨ﺆꚛ缦쿺㫯ﮱ뗙㱷쁝뻻הּ♮칇틃椳業䈗퇚�嵛熔櫢䳷볍픴㮖덭ἧ瀔ퟄ㿛�ܯ鉣屴윽䡨撲祏뉱鸱葜Ͷ肖漈녂첪녍먳孚띵姌⹝失譙좼齵✋ꏤ홭䰕셰䓱⒱湯᱐潲砚ꉵ鸹骘彽ꟺ㯭柒샤鮯餜뤸郻㋂ℎ淁刁棍⽃啯텩ῑ䲫硹㖦⻖麺ᇽ쀐渐꒻�鳛镯鱽ᣩ胆珍莭萬㰨娵쎭醮憥嵊湵믡撯瓳涗랛�磛띌ど�老퀪鳆䝒剘߀ퟷ㙑∗힖뒊养涒㢛ꭸ骲�琌鋙涯孭ᢼ�쿰█鰱滋ᆲ謦灞ᓱ㙔混볺퇪
唟㵦ⷢ⊺☢뺱絿ങ磯韃砓焧綆⎇ጝ�ሼ賫ꆥ�醘㭜핰淕殶欚ⷓ讉궵ᾓ湌瓸ꕓ맞㦟䦾몍厐䍼䦶耛蟋搣몙㠬澬ኢ磺ଷꣳᒷ㑒�ꛦ劷�榭�ﯓ맟瞷⣂淘邛豱큖㉢䶱䶧宭꿣圌譳으疉嘶멘ኻ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ谅糑練䠿纮�쿸럧ో象䦒𣏕줫牽銒ꤍ�镐Խྜྷ䓚㻗렉抹镸Ԫ퓶Ꚓ腈쳧
궽䅱ၲᅀ﨏܍粡㽇Յࠝ⒛畎堗マ沪㜘ꂁ㟕ꌩ�茥ᤡ숪ᅏ´ꥐ紙ᆺꙂ㺁訠堈ᛡ꿟䩪鬡ꡢ၏䌽䊝쁉몡ィ啿툑ដ鐑⠋歳ջ鱺�糱驿윿雷멂䇞ꁀ⡐ਔȅ䂁傠ᐨଊ撓䵤궣쬫䇓稜뛘徔ꮪ䁾蒈쳌寭䊩㧤မ〖䘗쪍崱ꛌ쏜Ў䱔☦扣䫝쌕퀼푉䚆䮊呂臙锞ᨤ蒉쳄公艒䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ᘔ⏲Ⅹ孤洂竧㗋疓Ⴓ䛳넬쒎뜱ᙊ䏗맫䫾潗뮇士嶷�涤ꮳ姝鸴�⧹껤ߟ抭矝橗ﯔ눬ꨣ²쓢缒麒﵊竰ⷖ痗ꍶ踻Ժ≩6銧粿댞疋川쮩
氎쮞銧粿딞疋川�嘜㳾ÿ麒﵊竰ⷖ痗꡶簻־筸鉿즣빟娏뫅껮⟕顮닾룺횃溱ꮻ垵仈╀ヨ관⫾⭹쇷㣫嶷�뚥諙ᦐꁇﻱ祊띘핝엚뷮㚩ꧠ鄡젣Ç⹀ᡙ씽퇇╏끷춟�坷呪☛㹒搩쨊袥稄ꌮ➅뮒ᅼ곹깛ᵄ馯⯳刧脰悯ÿ侓瘥㷸ᙫ뫫去撓䦑ꀠ趿ᅪ䔀锼댞疋川늫剭㠾閌ᬬ鉿䪞妟뫅껮곔圌蓆쓆堒ྷṠ쨾䷱튖㽞찿髛뫸鷘䦔�ȥ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ
⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ꩺ艙沎㹬蒚ꦼ䁁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁쾠矇壭먊䲖禄㶣㽉⧦쏝쭬钣쟇�냶ꌵꂜ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ睐⏯ኻ꽝ſt炇䚏牮써融윔㨶堲ṽ겹麵紘仹治സ⽺⢜ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ佐盚졸ᑞ鋙抓䈢忀鯅辒꩙糝뙛捚病䯳깢釷ᛍ
�⟚䋉ᴚ䢹酸⎇爫㽲筤�췡埍幋⟯뻸곉痮⽻⮋糝䀩傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔȅ䂁傠ᐨԊ脂ꁀ⡐ਔ扇ÿ轿䯺櫺譫캎ÿ�쎾毺짉㻷隻⇻겚铛?Ù