Mr. Grant Beck
Director of Community Development
City of Yelm
PO Box 479
Yelm WA 98597
January 11, 2007
RE: Fon Stevens Elementary
Frontage Improvements
Connection to STEP System
Dear Mr. Beck:
ERLING BIRKIAND
FAlll mrs 9 Cnvirnr PROIE«S
nlui_aoR
sw~
FAX. i60.d5f3-6434
407 COnTES AVE. NW
PO Ror 476
VEI M, WA98597-0476
~ti~~r~,~,~~~~: we~~M e~,~
At the pre-submission hearing on December 13, 2006 it was indicated that the Yelm School
District would be required to make street improvements and connect to the City sewer system.
After reviewing the costs associated with these requirements it has been determined that the
inclusion of these requirements will cause the district to either reduce the scope of or cancel
entirely the proposed project.
The school district is proposing that the City of Yelm allow the deferral of these requirements for
up to 10 years. The basis fora 10 year deferral is it would correspond to the projected need for
additional capital projects bonding. The cost of the referenced requirements would he included in
the proposed future bonds.
Please respond as soon as possible to insure the timely planning of this project.
Sincerely,
Erling Birkland
Director o(Construction and Facilities
Yelm Communiy Schools
Cc: Alan Burke, Superintendent, Yelm Commm~ity Schools