Loading...
fr^vsi^5-12-08^21525^Prairie Park Hotel Expansion REPORT OF FIELD INSPECTION Report #F 21525 CLIENT: Prairie Park Holdings  PROJECT #: 08S035  ATTN: Bill Lindgren  DATE: May 12, 2008  ADDRESS: P.O. Box 5210  PROJECT: Prairie Park Hotel Expansion   Yelm, WA 98597  PROJECT ADDRESS: 700 Prairie Park Lane     STRUCT. ENGINEER: MC Squared     CIVIL ENGINEER: Shea, Carr & Jewell     ARCHITECT:      CONTRACTOR: Prairie Park Development     PERMIT #: SPR-07-0275-4L   Inspection Performed: VSI Footing Sub Grade Time Onsite:  Temp:  °  Any Deficiencies Noted:  Needs Engineer’s Approval  Other     Arrived on site to T probe footings sub grade. Footings have all been sub ex'd into firm stable undisturbed native cut.  All footings checked with a 5/8" probe with no penetrations beyond 1".    All footings are firm, stable and ready for forms and steel.    MTC recommended moisturizing soil prior to placement of concrete.                                 REPORTED BY: T. Barney, Geotechnical Engineer  REVIEWED BY: J. Dearborn, SW Regional Manager   DISTRIBUTION: original:  cc:  cc:   cc:  cc:  cc: