Loading...
20190050 20190305100911966 shop concrete design4. The contractor shall ensure that all inspections are performed and are satisfactory before work is covered. Work covered before it can be certified satisfactory may be ordered to be opened for inspection at the contractor's expense. Items that are designated unsatisfactory shall be corrected at the contractor's expense. MAR 0 5 2099 C Cu L s NPR SHOP 513 V? d PQ 3 Special Inspections: Building Identification: STAR Job 16—B-78513 Building Size:48x30x18, 1.5:12 pitch roof --1338 total ft"2 enclosed. Building Risk Cat II, Construction Type IIB, no sprinklers 1. Statement of Special Inspection: Special inspection rn Occupancy: S1 (Vehicle Parts), beyond that normally inspected in the sequence of construction by the building offical is required for I m Occupancy Density 100 Ft^2/occupant, Occupant load 13 people per Chapter 10, following: C N W Requires 1 exit, max travel 200 feet. provided 1 egress routes travel distance less than High—Strength Bolts — A325 pretensloning for 0 100 feet Building Main Frames connections. to d Size Restrictions: Table 506.2 — 17500 ft"2, without setback increases, Section 903.2.9.1 12,000 ft^2 Seismic Resistance —Wind Resistance special ndd those inspection required for wind and seismic beyond > � normally provided by the building official. CU � Notes: Contents: ] This project builds a new shop for removal and storage of automotive parts. The building will be a pre --engineered building from Star Building Systems, supported on a reinforced concrete foundations. Floor Plan A1.1 U> M Plans Site plan by others Foundation Plan S1.1 rn�Pq Foundation Details S1.28c3 -��— [u NREC Low—Energy Building — power devoted to heating is limited to 4549 BTUs/hr. R25+R11ci for roof, 1313+1310c] Walls, R10 foundation. Vapor Barriers shall be installed on the heated side with sealed joints and openings, Floor Reinforcement S1.4 0 �y All weather barriers shall be sealed and or caulked consistent with industry good practice. Air Leak Test Required, envelope surface 5688 SF. Lighting Plan E1.1 = 0 00 Lighting Design per WEC C405. Substitutions controls and fixture by approval only Ventilation Plan M1.1 —C lY 0 _Q Building Design Loads: a_ 0 Building — see Star Building Systems Job Number 16—B-78513 Z � Soil: 1500 PSF vertical bearing. P4 Materials: Steel Building: See steel building submittal Concrete: Fc"=3000 Rebar: ASTM A615 grade 60 except #3 hoops may be Grade 40, use ASTM A706 rebar for all welded applications. Anchor Bolts: ASTM A307 or ASTM A36 or better threaded Rod with Nuts, or J—Bolts. 0 Z �d QUALITY ASSURANCE: 0 °' 1. The owner shall retain on inspection Service Independent from the building contractor. The Inspection Service shall be responsible for performing Z 0 cr O inspections when ordred by the contractor, collecting quality assuance documents, and certifing complance with the plans and specifications. L >, m 2. See below for inspection points. h 00 � m q � ,Co 3. The inspections conducted the building official will satisfy the those items usually inspected by the building offiicial. The building official shall Co m c 6, designate those items that will be inspected by the building official. nO ��VJ�/� L _ Y `J 4. The contractor shall ensure that all inspections are performed and are satisfactory before work is covered. Work covered before it can be certified satisfactory may be ordered to be opened for inspection at the contractor's expense. Items that are designated unsatisfactory shall be corrected at the contractor's expense. MAR 0 5 2099 3 2 � WEST WALL ELEVATION 513 SHOP Scale 3116"=1 ft SOUTH WALL ELEVATION 513 SHOP Scale 3116"=1 ft A B 1.5 12 1' II E ! I I 12x12 OH Door D ' � � � I j €• 1 EEEE I€ I I j€Ei iEE f j I k 1 1[ I f � s I III E I I� I i I r I f I12x12 OH Door 11 3070 MD C5 PQ L 3 CO CD tn N N I U) CO 0 I z CJ) i W !1 �e—I LI ) it j O W j 00 ti.J 1J �� rn 0 O f I m °f° = O s 1' II E ! I I 12x12 OH Door D ' � � � I j €• 1 EEEE I€ I I j€Ei iEE f j I k 1 1[ I f � s I III E I I� I i I r I f I12x12 OH Door 11 3070 MD C5 PQ L 3 CO CD tn N N I U) CO 0 z CJ) �e—I LI ) pq O W j 00 ti.J 1J �� rn 0 O m °f° = O s X� ' N C+1 X 00 ' O LV 7, rn LUm LO 11. O Z- -� REAR 0 a 2099 z j 00 ti.J 1J �� rn 0 (C,> m °f° X� ' N C+1 X 00 O LV 7, rn LUm LO 0. � U) REAR 0 a 2099 FOUNDATION PLAN Scale 3116"=1 ft 13'- 13' 1'-2" 10„ 31 10" A B YD E 14' 20' 14' � - 18' C 0 tu tu 0 z Lu (D0) �CO 00 o LLJ T 00 mom' �rn T n0 �3 L0 MAR 0 5 2099 1 8 -INCH FROST WALLS CT ON s1.z scale 112°=1 ft f z F3 SECTION S1.2 Scale 314"=1 ft Frost deal Air Boundary Wall f ,-,--,-a€• �_,�._, S B AR DG Four -Bolt Thrust Channel, Four J" dia x 18" min Anchor bolts, 3" ro'ection 5 JAMB DETAIL 51.2 Scale 314"=1 ft R-10 Foundation Insulation, Door Jamb rConcrete Floor '. #3 8"02" hoops spaced 3" for 2 ,�-.--� PLINTH I I„� spaces and 6" thereafter. 6cted Provide suitable flashing or Four T" dia x 18" min Anchor #3 8"x12" hoops spaced ' �� - ,cam ,Grave p-. L 1 -!¢fl other protective cover co 00o ti #5 cane bars ties plinth to floor 3” for 2 spaces -arid 6" E 3" cover. �j I,_�� I • FOOTING Concrete floor Concrete floor thereafter. _ with four #5 x48"rebar spaced 8" 8"x24" Frost wall, M.., , OI�PACTEp `GRAVEL I I ,OMPACTED "GRAVE . Two #5 rebar top and FOOTING I I " . E -- Two -Bolt Thrust Angle Bottom, La 24" P 24"x30"x12 conc footing_ # 3x20" frostwall vert I with two #4 x24" rear -E .._ tl € I Jamb Anchor Bolts per�,.... a, tF space 10" ,,. 3 spaced 8" long way��and t Anchor Bo It Plan, 12 Two #4 x 18 rebar spaQed length 2" projection 6" shortway with 6" botgrri R-10 Foundation Cover Six #5 8"x29" ,� 3,r: Insulation ---8" spaced 5 P III. -=: F2 PLAN VIEW Scale 314"=1 ft #4 24x24 CORNER BARS FOOTING 24"x28"x12 conc footing with two #4 x22" rebar spaced 8" long way and Two #4 x 18"rebar spaced 6" shortway with 6" bottom cover. Six #5 8"x29" verts spaced 5" PLINTH #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. Four -Bolt Thrust Channel Four J" dia x 18" min Anchor bolts, 3" projection F3 PLAN VIEW Scale 3/4"=1 ft PLAN VIEW F4 133 Scale 112"=1 ft 1 -2� FOOTING I '---I 54"x48"x12 conc footing with four #5 x48"rebar spaced 8" long way, and four #5x42" spaced 10" short way with 6" bottom cover. six #5 8"x29" verts __ spaced 5" 0. ' 2'-4" PLINTH , #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. Four -Balt Thrust Channel -1' Four i" dia x 18" min Anchor bolts, 3" projection — #5 cane bars ties plinth to floor FOOTING 24"x30"x12 conc footing with two #4 x24" rebar spaced 8" long way and Two #4 x 18"rebar spaced 6" shortway with 6" bottom Cover Six #5 8"x29" verts spaced 5" PLINTH o #3 8"x12" hoops spaced 3" for 2 spaces and 6" 1', .4" o thereafter. Four -Bolt Thrust Channel Four J" dia x 18" min Anchor bolts, 3" projection 2-6' �„ 4 F4 SECTION '-%2 si.z Scale 112"=1 ft Seal Air Boundary Frost Wall s PLAN VIEW F4 Four #5 rebar in footing, 8" OC as 51.2 Scale 112"=1 ft shown Two # 5 Cane bars into slab, 22 degrees, as shown. Two #5 Horz Bars #3 Verts, Six #5 8"00" vertical "L" bars. top and bottom of 6x18x6 3 8"x12" hoops spaced 3"OC for 2 Frost wall 12" OC spaces, 6" OC thereafter /Minimum 8" Iona anchor bolts , Frost Wall T.5 Four -Bolt Thrust Channel, Four" dia x 18" min Anchor bolts, 3" projection PLINTH #3 8"02" hoops spaced 3" for 2 spaces and 6" thereafter. Four -Bolt Thrust Channel Four T" dia x 18" min Anchor 00 Quo bolts, 3" projection 3�iaonnpkl OPPaie f co 00o ti #5 cane bars ties plinth to floor II; 3" cover. FOOTING m c C) 54"x48"x12 conc footing (Dr^ LO`i with four #5 x48"rebar spaced 8" long way, and four #5x42" spaced 10" short way with 6 bottom �npactea 603 V617, cover. six #5 8"x29" verts spaced 5" OJ C 0 C5 >Q L 3 P >- JA ON 0 > CS CU -) a✓ NT I i Pq Z 0J O :1ECD � � 4 IZ O MAR ® J 2019 �11Q 4W sNr\, - ti/iAt-k-4- '�S�arrA: �N LU W 00 Quo LUc��Zo co 00o ti xW N� m c C) LQ/O (Dr^ LO`i LL MAR ® J 2019 �11Q 4W sNr\, - ti/iAt-k-4- '�S�arrA: �N Rebar shapes 2 Bolt Trust Angle #3 8x12 hoop 3/16x2x2 angle �1 Double -Nut #5 8x29 Vert 21„ �R1 s' 8' anchor bolts 2 � Drill Hales per Anchor bolt plan 2P -5)p 1— 7/8 2 � 1--7/8 #5 24x24 corner bars t-21 „ 2 Kpi 1„ #5 Cane bars -- 10 f oot bars 4 Bolt Trust Angle for 4x4 gage i 6),C8x11, 5 Channel or larger Double—Nut anchor bolts Drill Holes per Anchor bolt plan #3x20"vert 24,E—�i I 1'--8" R5„ 8 24' �j �- ti oN �a o(U LAC >C5 w -� r_ Pq Q) LU LLJ '0) LU coo X�Nm CO o W a m rn Or a U MAR D 5 2019 E��