105093416_311 DUPLEX DESIGNOI
AT M01
NOTIF#
ORDER#
PWR Superior
Xfmr Upgrade
Perm Svc
Removal
Temporary
Job Order
508235317
105093416
FUNCTION
ADDED:
0'
/
C6
/ e`w
/
Z e
CIRCUIT FEET
Sq. Footage: 1500 / / 3 5
Panel Size: 200AMP /
Heat Type: ELECTRIC
Est. Demand: 12KW
LRC: 65 — —
% V. Drop: 3.8%
% Flicker: 2.9%
AT /
\
. CIRCCUIUI 313T FEET ADDED: 0' \
Sq. Footage: 1500 \
Panel Size: 200AMP
Heat Type: ELECTRIC
Est. Demand: 12KW h`
LRC: 65 EXISTING SHOP TO _
\ BE DEMOLISHED
• Fl Drop: 206% \ AND REMOVED M(
/e Flicker: 2.6 /e
CUST TO INST 4/0 UG TPLX
PERM METER
208 / 310
Backfill for In Conduit -The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Excavated Dirt Pile �\�
20" Min 24" Min
Final Grade To Excavated Dirt Pile
24" Min Backfill for Conduit
✓j� Free of rocks
36" Max � �
.0
Max
larger than 8"
Cover � X12" Min �'<
— — I-- —� 36" MINIMUM COVER
•• ,�,. IN RIGHT OF WAY
TV & TEL J `Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
\ /
��CUST TO INST 4/0 UG TPLX \
►NST 350MCM
UG TPLX /
305
\ f9
\
\ BO -23250
\
559398-147324
37.5kV A 120/240v
Captive L -Bolt
Loc
Conductors enter from —
beneath and shall be
folded back with handhole
Set handhole flush
to final grade
— Captive L -Bolt
Lock Cover
SIDE VIEW
\�e`OC 14
service
conductors
SITE SPECIFIC NOTES
AT V07 GRID # 559398-147324
REPL EXISTING 25KVA 120/240V PM XFMR W/ 37.5KVA 1201240V PM XFMR
INST LIB ELBOW & INSULATED CAP
AT H01
INST 17" X 30" SEC HH W/#10-350 (6) POS CONNECTION BARS
REROUTE & CONNECT EXISTING UG SVCS
AT M01
PERM METER LOCATION
AT M02
PERM METER LOCATION
Vol To H01:
IN
350 UG TPLX SVC ±1751 IN PSE PROVIDED TRENCH
& 3" SCH40 CONDUIT W/ 3/8" POLY PULL ROPE
(TOTAL LGTH
H01 To M01:
CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(1 RUN OF 4/0 UG TPLX)
H01 To M02:
CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(1 RUN OF 4/0 UG TPLX)
POWER GENERAL NOTES - COMMERCIAL PROJECT
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
3'12 this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3.22 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or
construction materials which would restrict construction and/or equipment access, before work can begin.
6. Roads shall be paved or have a compacted , crushed rock base in place.
7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or
guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from
water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing
them.
8. All work is to be done in accordance with local municipal and county permit requirements as applicable.
9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
10. Inclement weather conditions may cause delays in construction times and dates.
11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The
customer will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER NOTE:
CUSTOMER RESPONSIBLE FOR INSTALLING CONDUIT & 3/8" NYLON PULL ROPE, SITE MUST BE READY 1 -WEEK PRIOR
TO CONSTRUCTION DATE
TRANSFORMER REMOVAL
Removed at site: U�
Grid Number: 559398-147324
kVA Rating: 25kVA 120/240V
Foreman to redline the following information
CompanylD#:
Primary phase connected to:
Tested Secondary Voltage /
FOREMAN MUST FILL IN
CABLE #:
Manufacturer:
Year Manufactured:
Compound:
TRANSFORMER INSTALLATION (PM)
Installed at site: U�
Grid Number: 559398-147324
kVA Rating: 37.5WA 120/240V
Material ID#: 6247050
Foreman to redline the following information
Company
Primary phase connected to:
Tested Secondary Voltage /
EROSION &SEDIMENT CONTROL REQUIREMENTS
EROSION &SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
&ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)'
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED &Work Area left In CLEANISAFE Condidan.
❑ Grid, Cable, and Switch numbers INSTALLED &VERIFIED.
❑ Field Changes RED -LINED on As•built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ CompanyRECORDED in correct location on As-bullt.
❑ indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Devledons noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
end that ell quality requirements are met.
Foremen's Signature
Print Neme Date
PROJECT PHASE
Project Manager Confect Information:
NOTIF#
ORDER#
PWR Superior
Xfmr Upgrade
Perm Svc
Removal
Temporary
Job Order
508235317
105093416
FUNCTION
_
584044979
PHONE NO
508440888
104320887
N/A
_ _
N/A
N/A
_
N/A
N/A
N/A
GAS Distribution
HP Main
HP Svc/MSA
N/A
N/A
N/A
N/A
N/A
J.Singleton
N/A
CABLE TV
REV#
DATE
PHONE
DESCRIPTION
ENGR-GAS
Manager.• John Singleton
Cell Phone: 425-417-1149
E -Mall: John.Singleton(a�pse.cam
Developer Locates Req'd No
PSE Locates Reo'd No
Vicinity Map
Owner/ Developer Contact Info
First Finishers, LLC
PO Box 986
Yelm, WA, 98597
ATTN: Tim 360.400-7767 office
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 4245555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO EE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Outages Req'd No REAL ESTATE/EASEMENT PERMIT
Flagging Req'd Yes Req'd
City
of Yelm
3
FUNCTION
CONTACT
PHONE NO
DATE
2
PROJECT MGR
J.Singleton
425-417-1149
11/8/19
1
ENGR-POWER
J.Singleton
425.417-1149
11/8/19
REV#
DATE
BY
DESCRIPTION
ENGR-GAS
COUNTY
Thurston
Emer Sect
Gas Wk Ctr
POWER WK CTR
QSTHLE
DRAWN BY
P.Courtney
360-786.5940
11/12/19
CHECKED BY
1/4 SEC
SW'/,,Sect19,T17,R02E
OP MAP
PLAT MAP
APPROVED BY
FOREMAN #1
U -MAP NO (POWER)
1702E075
OH CKT MAP
1702E116
UG CKT MAP
1702EO75
CIRCUIT NO
YEL-25
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
P JGET
SOUND 311 Duplex
XFMR Upgrade, UG Svc & Hand Hole Inst.
ENERGY 311 Washington St SW Yelm, WA 98597
DESIGNED BY PSE
INCIDENT
MAOP
Gas order
105093416
SCALE
AS NOTED
PAGE
01/01