2020.0103.BPP0008 0200 - GA5 RESPONSIBILITY SCHEDULES - 3705architecture2809 Ajax Avenue Suite 100Rogers Arkansas 72758Phone: 479.636.3545Fax: 479.636.1209+engineeringArchitect of RecordWilliam Douglas HurleyWashington License No. 8855Unified Business ID No. 602 491 668STIPULATION FOR REUSETHIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.DRAWN BY:CHECKED BY:DOCUMENT DATE:PROTO:SUPER BUNDLEPROTO CYCLE:DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTIONSHEET:ISSUE BLOCKYELM, WASHINGTON03/11/2020YELM, WASHINGTONSTORE NO.3705-232JOB NUMBER: 2019.0835ECJT17601/31/202003/11/2020RESPONSIBILITYSCHEDULESGA537REMOVE ALL OF THE OLD CASES AND CLEAR SITE OF ALLTOOLS, UNUSED INSTALLATION MATERIALS AND TRASH.GC RC GC RC36SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMSAS REQUIRED BY THE END OF COMMISSIONING WEEK.COMPLETED VERISAE FORMS ARE TO BE EMAILED TOMCEQUIP@WAL-MART.COM.RC RCRCRC35AFTER ALL CHANGES HAVE BEEN MADE TO A RACK, REMOVEANY COMPRESSOR SUCTION FILTERS / SOCKS AND REPLACETHE RACK LIQUID LINE FILTERS. LEAVE THE OLD FILTERS /...RCRCRCRC34REINSTALL ANY PREVIOUSLY REMOVED (UNDAMAGED) ASSETPROTECTION (BUMP GUARDS). INSTALL NEW OWNERFURNISHED PROTECTION EQUIPMENT AS NEEDED.RC RCRCRC33REPLACE THE SHOP FLOOR DRAWINGS AND INSTALLREPLACEMENT LEGENDS.RC RCRCRC32 COMPLETE ASSET TAGGING PROCESSRC RCRCRC31 INSTALL NEW CIRCUIT LABELS TO THE NEW CASES AS...RC RCRCRC30REPLACE MISSING OR DAMAGED FLOOR TILES OR REPAIRVISIBLE, DAMAGED CONCRETE FLOOR AROUND THE NEWCASES. (AS NEEDED)GC (OR WMTPREFERREDFLOORNGINSTALLER)RC N/AN/A29 FILL THE NEW CASE WITH PRODUCT.WMT WMTWMTWMT28HANDOVER THE NEW CASES TO THE STORE.(CASES MUST BE CLEAN, AT OPERATIONAL TEMPERATURE ANDFULLY FUNCTIONAL WITH ALL PANS AND SHELVING IN PLACE.)RC RCRCRC27CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED ANDMECHANICAL JOINTS INSTALLED OR DISTURBED DURING THEPROJECT.RC RCRCRC26NOTIFY WMT BUILDING CONTROLS THAT THE NEW CASES ARERUNNING AND ONLINE.RC RCRCRC25WHEN REPLACING DELI SERVE OVER CASES, COORDINATE THEINSTALLATION OF THE DATA CABLING FOR THE DELI SCALES.WMT RC/WMT WMT RC/WMT24WHEN REPLACING PRODUCE CASES, INSTALL NEW MISTINGSYSTEM TO CASES AND CONNECT TO DEDICATED WATERSUPPLY.RC RCRCRC23FURNISH CONTROLS SUPPORT TO THE INSTALLINGCONTRACTOR.OEM OEMOEMOEM22 INSTALL FURNISHED LIDS TO REFRIGERATED BUNKERS.RCRCRCRC21SWITCH ON AND COMMISSION THE NEW CASES, VALVES ANDCONTROLS AS REQUIRED. CHECK AND ADJUST MECHANICALTXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR...RC RCRCRC20EVACUATE AND PRESSURE TEST THE NEW CASES AND ANYPIPING MODIFIED OR DISTURBED DURING THE WORK.RC RCRCRC19CONNECT THE NEW CASES (MECHANICAL, ELECTRICAL,PLUMBING AND CONTROLS) AS DETAILED ON THE PRINTS.RC RCRCRC18SET THE NEW CASES IN THE POSITION DICTATED BY THECONSTRUCTION PRINTS. ENSURE CASES ARE STRAIGHT ANDLEVEL, AND SHIMMED PER THE MANUFACTURER'S GUIDANCE.SEAL ALL CASES WITH BUTYL SEALANT. ALIGN GLASS DOORSPLUMB AND LEVEL TO PREVENT "SAW-TOOTHING" OF THEDOORS.RC RCRCRC17WHEN REPLACING MULTI-DECK AND / OR GLASS DOOR CASES,AND REUSING EXISTING PIPEWORK, RE-INSULATE THEREFRIGERATION PIPING BEHIND THE CASES. THIS APPLIES TOALL PIPING THAT IS ACCESSIBLE WITHOUT DISTURBINGEXISTING CASES, INSIDE PITS / TUNNELS OR IN A CHASE THATIS NOT BEING OTHERWISE DISTURBED.RCRCN/AN/A16 CLEAN THE FLOOR UNDER THE CASES AND JET THE DRAINS.RCRCN/AN/A15DECOMMISSION AND REMOVE THE OLD CASES. IN TEXAS, ALLDECOMMISSIONED CASES WILL BE REMOVED FROM THESTORE BY QUICK REFRIGERATION.COORDINATE REMOVAL AND DISPOSAL WITH WMTCONSTRUCTION MANGER.WHEN REPLACING PRODUCE CASES, REMOVE WATER SUPPLYFROM MISTING SYSTEM.WHEN REPLACING DELI SERVE OVER CASES, COORDINATE THEREMOVAL OF THE DATA CABLING FOR THE DELI SCALES.RC RCN/AN/A14REMOVE ALL OF THE ASSET PROTECTION (BUMP GUARDS)FROM AROUND THE CASES.GC RC N/AN/A13REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE CASESTHAT ARE BEING REPLACED.WMT WMTN/AN/A12NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISETHEM WHICH SYSTEMS AND WHICH CASES WILL BE IMPACTEDBY THE WORK.RC RCN/AN/A11NOTIFY THE EMS VENDOR 24 HRS. IN ADVANCE OF THE WORK -TELL THEM WHAT CASES ARE BEING INSTALLED AND WHATSYSTEMS WILL BE IMPACTED.RC RCRCRC10 OBTAIN HOT WORK PERMITS AS REQUIRED.GCRCGCRC9 COORDINATE THE INSTALLATION TIME WITH STORE...GCRCGCRC8PREFABRICATE AS MUCH OF THE NEW PIPE WORK ANDELECTRICAL CONDUIT AS POSSIBLE AND MOUNT ANY NEWDEVICES IN ORDER TO REDUCE THE AMOUNT OF "DOWN TIME...RCRCRCRC7PROVIDE ALL "SLAVE" WIRING FROM FIRST CASE TOREMAINING CASES ON THE CIRCUIT.RC RCRCRC6PROVIDE ELECTRICAL POWER CABLING FROM POWER SOURCETO THE FIRST CASE IN THE CIRCUIT.GC RC GC RC5INSTALL AND TERMINATE FURNISHED CONTROLS WIRING (24VOLTS OR LESS) AS DETAILED ON THE PRINTS.RC RCRCRC4PROVIDE TYPEWRITTEN SCHEDULES FOR ALL AFFECTEDELECTRICAL PANELBOARDS.GC RC GC RC3FURNISH ALL CONTROLS CABLING AS NECESSARY TOCOMPLETE THE WORK. (24 VOLTS OR LESS)EMS EMS EMS EMS2FURNISH AND INSTALL ALL (REFRIGERANT AND DRAIN) PIPING,AND ALL FIELD INSTALLED REFRIGERATION VALVESNECESSARY TO COMPLETE THE WORK.RCRCRCRC1 FURNISH THE NEW / REPLACEMENT CASES.OEM/WMT OEM/WMT OEM/WMT OEM/WMTREMODEL CAPEX REMODEL CAPEXREPLACEMENTSNEW EQUIPMENT#SCOPE OF WORKRESPONSIBLE PARTY***NOTE***THIS DOCUMENT IS INTENDED TO DESCRIBE IMPORTANT ELEMENTS OF THIS PROJECT AND TO DEFINE THE RESPONSIBLE PARTIESFOR THIS WORK STREAM. IT IS NOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION OR A COMPLETE SCOPE OF WORK. ITSHOULD BE READ AND USED IN CONJUNCTION WITH ADDITIONAL, DETAILED INFORMATION IN THE WALMART REALTY ONE BESTWAY STANDARDS LIBRARY, AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER.CASE INSTALLATIONMC MECHANICAL CONTRACTOR AND SUB-CONTRACTORSWTC WATER TREATMENT CONTRACTORAESSUPPLIER OF AHU ADAPTER CURBS, RTU ADAPTER CURBS AND WALMART'SEQUIPMENT SALVAGE PARTNERWMT WALMARTPS WALK-IN BOX PANEL SUPPLIEROEMORIGINAL RACK EQUIPMENT MANUFACTURER, ORIGINAL CASE EQUIPMENTMANUFACTURER, AHU MANUFACTURER, RTU MANUFACTUREREMS EMS VENDORGC GENERAL CONTRACTOR AND SUB-CONTRACTORSRC REFRIGERATION CONTRACTOR AND SUB-CONTRACTORSABBREVIATIONDESCRIPTIONABBREVIATION LEGEND