Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2020.0103.BPP0008 3610 - REM1 REFRIGERATION ENERGY MANAGEMENT PLAN - 3705 COPY
RCU DISCHARGE AIR TEMPERATURE AND DEFROST PARAMETERS 2" CONDUITS — TO JOIST LEVEL AS RL DISCHARGE AIR TEMP RD AND PROVIDE BUSHINGS EXISTING UNISTRUT TO AT EACH END TYP STRUCTURE AND TOP NEW EMS DEVICE OR SENSOR. SETTINGS FOR CASES/ 5 OF COOLER. (SENSOR)(E,RL) FA ------ MOUNT NEW RETURN AIR TEMP DEFROST DEFROST SCHEDULE DIGITAL INPUT. Al CIM'SVERTICAL AUX SETTING FOR WALK IN (E) SO LED DISPLAY IS � w 0 BOXES AT THE TOP Lo M 00 a J N LU THIS AREA DESIGNATED FOR CIM'S. I EXISTING ` r N REF CIM SCHEDULES FOR QUANTITY I WIREWAY w m � D z L _ — — - Q z z o Lu Lu z W N co LO CO APPLICATION MODEL NUMBER MFR w } z O w o 0 0 0 0 0 �_ LU � Lu w a 0 0 0 0 0 0 U O Z Ir x� � U_ ¢ of W RCU-1 M.D. Beer IM -05 -EC (RD4046.452/RD4047.452) HUSSMANN 30 32 34 6 0 20 48 0 RCU-2 M.D. Deli ON5DMX-NRG (RD4043.042) HILL PHOENIX 29 31 33 6 0 40 47 0 Information included in this schedule is taken from manufacturer's submittals. Contractor to verify information against latest submittals available at time cases/coils are delivered. Parameters above are to be used in programming new/replaced cases/coils only. 5 4 3 E_XISTIING RACK E CONTROLLER NEW RCU-1 ON ROOF. Li LLLL lr_ :fj — — OMTE 9b S RCU-1f RCU- d RCU-1b S S RCU 1a S 0 RCS U-1e�R� CU -1c EMS CONDUIT IN CHASE— MTE 9a PROVIDED BY OTHERS. (TYP RELOCATED CASE) S MTE 1a S MTE-1b G I I MTE 1c ltd REFRIGERATION ENE 1 1/16" = V-0" EMS CONDUIT IN CHASE PROVIDED BY OTHERS. (TYP) y 6NEW RCU-2 ON ROOF. NEW SELF-CONTAINED CASE EXISTING TO REMAIN TEMP SENSOR NEW HOT CASES�� MT RCU 2a RCU 2b RCU c y S S S ��_tl x 1 RGY MANAGEMENT PLAN PING REAR CIM BACKBOARD NTED ABOVE MEAT COOLER. TRACTOR TO VERIFY EXACT TION. 2 3 REM1 REM1 ING FRONT CIM BACKBOARD JTED IN EDC4. RACTOR TO VERIFY EXACT TION. 2 3 REM1 REM1 EXISTING PLYWOOD WALL BACKBOARD COOLER/FREEZER ROOF EXISTING CIM BACKBOARD NTS REFRIGERATION ENERGY MANAGEMENT CONTRACTOR TO INSTALL CABLING AND DEVICES AND MAKE FINAL TERMINATIONS. REFER TO PLANS FOR DEVICE LOCATIONS. CIM ONE -LINE REFLECTS THE INTENDED DESIGN BASED ON NEW EMS DEVICES AND EXISTING SYSTEM NUMBERS. VERIFY ALL EXISTING CONDITIONS AND LOCATION OF ALL EMS EQUIPMENT PRIOR TO ROUGH -IN. NOVAR WIRE LEGEND WIR-1010 (TAN CABLE 18-2,20-2 TWISTED PAIR) WIR-2020 (BLUE CABLE 22-2 TWISTED PAIR) NOTES: 1. ALL CABLE WIR-2020 UNLESS NOTED OTHERWISE. 2. ALL WIR-1010 AND WIR-2020 CABLE FURNISED BY OWNER FOR INSTALLATION BY CONTRACTOR. 3. ALL OTHER CABLE FURNISHED AND INSTALLED BY CONTRACTOR. EXISTING WEATHERPAC�EXISTING WEATHERPAC� ,E, ,F, I I I I RACK 'E' RACK 'F' CONTROLLER CONTROLLER (E) (E) CIM/2 (F1)(E) CIM/2 (E1)(E) CIM/2 (F2)(E) CIM/2 (E2)(E) S CIM/2 (F3)(E) CIM/2 (E3)(E) S WIR-1010 TYP CIM/2 (E4)(N) S TEMPERATURE SENSOR (TYP) -SEE CIM SCHEDULES WIR-2020 TYP WHERE EXISTING REFRIGERATION CHASES ARE BEING REMOVED, ANY DAMAGED OR IMPROPERLY SUPPORTED EMS CONDUITS WITHIN CHASE SHALL BE REPAIRED OR REPLACED AS REQUIRED. ANY EXISTING EMS CABLING WITHIN CHASE NOT INSTALLED IN CONDUIT SHALL BE RE-ROUTED THROUGH NEW CONDUIT. FINAL APPROVAL BY WALMART CONSTRUCTION MANAGER. REFERENCE ARCHITECTURAL DRAWINGS FOR REFRIGERATION CHASES BEING REMOVED. REM SYMBOLS 12.21.18 E2E REFRIGERATION NETWORK GATEWAY EMS ENERGY MANAGEMENT SYSTEM TEMP TEMPERATURE VFD VARIABLE FREQUENCY DRIVE BACKBOARD CASE INPUT MODULE LTA -X REFRIGERATION CIRCUIT © PRESSURE TRANSDUCER O TEMPERATURE SENSOR DTS DUAL TEMP SWITCH RIB RELAY IN BOX C-## CONTACTOR RELAY IN BOX & CONTACTOR PANEL RIM RACK INPUT MODULE ROM RACK OUTPUT MODULE CIM CIM/2 CASE INPUT MODULE SCC REFRIGERATION CASE/CIRCUIT CONTROLLER (SPORLAN) SGR SPORLAN GATEWAY ROUTER SNS SPORLAN NETWORK SWITCH I/O INPUT/OUTPUT MODULE IR INTERFACE RELAY 81M UNIVERSAL INPUT MODULE MINio INPUT/OUTPUT MODULE RCC RCC CASE/CIRCUIT CONTROLLER (NOVAR) NEW EQUIPMENT EXISTING EQUIPMENT FACTORY INSTALLED EQUIPMENT CONDENSING UNIT GENERAL NOTES 1. THE REFRIGERATION MANUFACTURER SHALL MOUNT THE TEMPERATURE SENSOR, FOR THE MEDIUM TEMPERATURE AND LOW TEMPERATURE CASES, IN THE DISCHARGE AIR PLENUM AT THE CENTER OF THE CASE. 2. THERMOSTATS AND TIME CLOCKS, FOR ALL EQUIPMENT, TO BE SUPPLIED BY THE REFRIGERATION CONDENSING UNIT MANUFACTURER. 3. MOUNT THE THERMOSTAT BULBS, FOR THE LOW TEMPERATURE AND MEDIUM TEMPERATURE CASES, IN THE DISCHARGE AIR PLENUM IN THE CENTER OF THE CASES. 4. MOUNT ALL CONDENSING UNITS A MINIMUM OF 30" ABOVE THE ROOF. EMS ONE -LINE AND SCHEDULE NOTES 2" CONDUITS — TO JOIST LEVEL AS RL NEEDED FOR CABLING RD AND PROVIDE BUSHINGS EXISTING UNISTRUT TO AT EACH END TYP STRUCTURE AND TOP NEW EMS DEVICE OR SENSOR. FI 5 OF COOLER. (SENSOR)(E,RL) FA ------ MOUNT NEW -A EMS DEVICE OR SENSOR USED FOR MONITORING ONLY. DI DIGITAL INPUT. Al CIM'SVERTICAL AUX ----------------------7 (E) SO LED DISPLAY IS � w 0 .. C G AT THE TOP Lo M 00 a J N LU THIS AREA DESIGNATED FOR CIM'S. I EXISTING ` r N REF CIM SCHEDULES FOR QUANTITY I WIREWAY w m � D z L _ — — - EXISTING PLYWOOD WALL BACKBOARD COOLER/FREEZER ROOF EXISTING CIM BACKBOARD NTS REFRIGERATION ENERGY MANAGEMENT CONTRACTOR TO INSTALL CABLING AND DEVICES AND MAKE FINAL TERMINATIONS. REFER TO PLANS FOR DEVICE LOCATIONS. CIM ONE -LINE REFLECTS THE INTENDED DESIGN BASED ON NEW EMS DEVICES AND EXISTING SYSTEM NUMBERS. VERIFY ALL EXISTING CONDITIONS AND LOCATION OF ALL EMS EQUIPMENT PRIOR TO ROUGH -IN. NOVAR WIRE LEGEND WIR-1010 (TAN CABLE 18-2,20-2 TWISTED PAIR) WIR-2020 (BLUE CABLE 22-2 TWISTED PAIR) NOTES: 1. ALL CABLE WIR-2020 UNLESS NOTED OTHERWISE. 2. ALL WIR-1010 AND WIR-2020 CABLE FURNISED BY OWNER FOR INSTALLATION BY CONTRACTOR. 3. ALL OTHER CABLE FURNISHED AND INSTALLED BY CONTRACTOR. EXISTING WEATHERPAC�EXISTING WEATHERPAC� ,E, ,F, I I I I RACK 'E' RACK 'F' CONTROLLER CONTROLLER (E) (E) CIM/2 (F1)(E) CIM/2 (E1)(E) CIM/2 (F2)(E) CIM/2 (E2)(E) S CIM/2 (F3)(E) CIM/2 (E3)(E) S WIR-1010 TYP CIM/2 (E4)(N) S TEMPERATURE SENSOR (TYP) -SEE CIM SCHEDULES WIR-2020 TYP WHERE EXISTING REFRIGERATION CHASES ARE BEING REMOVED, ANY DAMAGED OR IMPROPERLY SUPPORTED EMS CONDUITS WITHIN CHASE SHALL BE REPAIRED OR REPLACED AS REQUIRED. ANY EXISTING EMS CABLING WITHIN CHASE NOT INSTALLED IN CONDUIT SHALL BE RE-ROUTED THROUGH NEW CONDUIT. FINAL APPROVAL BY WALMART CONSTRUCTION MANAGER. REFERENCE ARCHITECTURAL DRAWINGS FOR REFRIGERATION CHASES BEING REMOVED. REM SYMBOLS 12.21.18 E2E REFRIGERATION NETWORK GATEWAY EMS ENERGY MANAGEMENT SYSTEM TEMP TEMPERATURE VFD VARIABLE FREQUENCY DRIVE BACKBOARD CASE INPUT MODULE LTA -X REFRIGERATION CIRCUIT © PRESSURE TRANSDUCER O TEMPERATURE SENSOR DTS DUAL TEMP SWITCH RIB RELAY IN BOX C-## CONTACTOR RELAY IN BOX & CONTACTOR PANEL RIM RACK INPUT MODULE ROM RACK OUTPUT MODULE CIM CIM/2 CASE INPUT MODULE SCC REFRIGERATION CASE/CIRCUIT CONTROLLER (SPORLAN) SGR SPORLAN GATEWAY ROUTER SNS SPORLAN NETWORK SWITCH I/O INPUT/OUTPUT MODULE IR INTERFACE RELAY 81M UNIVERSAL INPUT MODULE MINio INPUT/OUTPUT MODULE RCC RCC CASE/CIRCUIT CONTROLLER (NOVAR) NEW EQUIPMENT EXISTING EQUIPMENT FACTORY INSTALLED EQUIPMENT CONDENSING UNIT GENERAL NOTES 1. THE REFRIGERATION MANUFACTURER SHALL MOUNT THE TEMPERATURE SENSOR, FOR THE MEDIUM TEMPERATURE AND LOW TEMPERATURE CASES, IN THE DISCHARGE AIR PLENUM AT THE CENTER OF THE CASE. 2. THERMOSTATS AND TIME CLOCKS, FOR ALL EQUIPMENT, TO BE SUPPLIED BY THE REFRIGERATION CONDENSING UNIT MANUFACTURER. 3. MOUNT THE THERMOSTAT BULBS, FOR THE LOW TEMPERATURE AND MEDIUM TEMPERATURE CASES, IN THE DISCHARGE AIR PLENUM IN THE CENTER OF THE CASES. 4. MOUNT ALL CONDENSING UNITS A MINIMUM OF 30" ABOVE THE ROOF. EMS ONE -LINE AND SCHEDULE NOTES E — EXISTING EMS DEVICE, SENSOR, OR WIRE FOR REUSE. RL EXISTING EMS DEVICE OR SENSOR TO RELOCATE AND RECONNECT. INSTALL NEW CABLE FOR RELOCATED DEVICE OR SENSOR AS NECESSARY. RD REDESIGNATED EMS DEVICE OR SENSOR. RP REPLACED EMS DEVICE OR SENSOR. N NEW EMS DEVICE OR SENSOR. FI 5 NEW FIELD INSTALLED EMS DEVICE, SENSOR, OR WIRE. (SENSOR)(E,RL) FA ------ NEW FACTORY INSTALLED EMS DEVICE, SENSOR, OR WIRE. M EMS DEVICE OR SENSOR USED FOR MONITORING ONLY. DI DIGITAL INPUT. Al ANALOG INPUT. CIM/2-E3 SCHEDULE (E - REAR CIM BOARD) 1 MTE-1a (SENSOR)(E,RL) 2 MTE-1b (SENSOR)(E,RL) 3 MTE-1c (SENSOR)(E,RL) 4 MTE-9a (SENSOR)(E,RL) 5 MTE-9b (SENSOR)(E,RL) 6 SPARE RCU-2b 7 SPARE (E) 8 SPARE (E) AUX SPARE (E) CIM/2-F1 SCHEDULE (E - FRONT CIM BOARD) 1 MTF -1 (SENSOR)(E) 2 MTF -2 (SENSOR)(E) 3 MTF -3 (SENSOR)(E) 4 MTF -9 (SENSOR)(E) 5 RCU-2a (SENSOR)(N,FA,M) 6 RCU-2b (SENSOR)(N,FA,M) 7 RCU-2c (SENSOR)(N,FA,M) 8 MTF -6 (SENSOR)(E,RL) AUX SPARE (E) PARTIAL ONE -LINE OF REFRIGERATION EMS NTS CIM/2-E4 SCHEDULE (N,FI- REAR CIM BOARD) 1 RCU-1a (SENSOR)(N,FA,M) 2 RCU-1b (SENSOR)(N,FA,M) 3 RCU-1c (SENSOR)(N,FA,M) 4 RCU-1d (SENSOR)(N,FA,M) 5 RCU-1e (SENSOR)(N,FA,M) 6 RCU-1f (SENSOR)(N,FA,M) 7 SPARE aQ_ OowOa u�_j F- W a,=2 DZK(n=J 8 SPARE z AUX SPARE (E) CIM/2-F2 SCHEDULE (E - FRONT CIM BOARD) 1 MTF -7a (SENSOR)(E) 2 MTF -7b (SENSOR)(E) 3 MTF -8a (SENSOR)(E) 4 MTF -8b (SENSOR)(E) 5 MTF -8c (SENSOR)(E) 6 MTF -8d (SENSOR)(E) 7 SPARE aQ_ OowOa u�_j F- W a,=2 DZK(n=J 8 SPARE z AUX SPARE (E) EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. GENERAL REFRIGERATION EMS NOTES 03.12.18 1. EMS CONTRACTOR SHALL CONTACT THE EMS SUPPLIER(S) TO OBTAIN A CURRENT MODULE CONFIGURATION PRINTOUT BEFORE TERMINATING SENSOR LEADS AT INPUT MODULES. THE REQUEST FOR THE CONFIGURATION PRINTOUT SHALL BE MADE PRIOR TO THE INSTALLATION OF EMS CABLES. WIRING TERMINATIONS SHALL BE LANDED ACCORDING TO THE EMS SUPPLIER CONFIGURATION SHEETS. 2. EMS CONTRACTOR SHALL PROVIDE COMPLETED REFRIGERATION SENSOR INPUT VERIFICATION FORMS TO THE EMS SUPPLIER(S) AT THE BEGINNING OF THE REFRIGERATION EQUIPMENT STARTUP. EMS INSTALLER SHALL PROVIDE ASSISTANCE TO THE EMS SUPPLIER(S) FOR SPOT CHECKING OF SENSORS FOR ACCURACY. 3. ALL EMS CABLE ON THE SALES FLOOR SHALL BE ROUTED IN CONDUIT AND CONCEALED FROM VIEW AND ROUTED ALONGSIDE OTHER PIPING OR CONDUIT AS MUCH AS POSSIBLE. 4. EMS CONTRACTOR SHALL BE PRESENT AND AVAILABLE TO RESOLVE ISSUES AND PROVIDE REFRIGERATION STARTUP ASSISTANCE UNTIL RELEASED BY THE EMS SUPPLIER AND WALMART MECHANICAL CONSTRUCTION MANAGER. 5. DURING THE REFRIGERATION STARTUP, EMS CONTRACTOR SHALL COMPLETE ALL UNRESOLVED REFRIGERATION WORK PRIOR TO WORKING ON OTHER EMS INSTALLATION ITEMS. 6. WHEN THE EMS SUPPLIER IS NOT SCHEDULED TO PERFORM THE ON SITE REFRIGERATION STARTUP, THE ENERGY MANAGEMENT CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL CHECKS AND TEST TO ENSURE A FULLY FUNCTIONAL REFRIGERATION CONTROL SYSTEM. CONTACT THE EMS SUPPLIER FOR THE BLANK TEST VERIFICATION FORMS AND INSTRUCTIONS FOR COMPLETING. ALL COMPLETED TEST VERIFICATION FORMS SHALL BE RETURNED TO THE WALMART MECHANICAL CONSTRUCTION MANAGER. 7. REFER TO ARCHITECTURAL DRAWINGS FOR PIPING INSTALLATION AND SEALING REQUIREMENTS FOR DEVICES SHOWN ON COOLER/FREEZER PANELS. DO NOT INSTALL PIPING WITHIN COOLER/FREEZER PANELS. 8. ROUTE ALL UTILITY SERVICE LINES (PIPES AND CONDUIT) WITHIN STUD WALLS WHEREVER POSSIBLE. ON COOLER/FREEZER PANELS IN FOOD PREP AREAS WHERE UTILITIES MUST BE EXPOSED, CONTRACTOR TO HAVE THE OPTION OF THE FOLLOWING: A. SURFACE MOUNT UTILITIES WITH NON- CORROSIVE ANCHORS; SEAL BOTH SIDES OF PIPE/CONDUIT TO PANEL CONTINUOUSLY WITH SEALANT. B. INSTALL UTILITIES 1/2" OFF FACE OF PANEL TO ALLOW FOR CLEANING; USE ONLY NON -CORROSIVE MATERIALS FOR SPACERS AND ANCHORS. C. COVER UTILITIES WITH 20 GAUGE STAINLESS STEEL BENT PLATES MOUNTED TO WALL WITH NON -CORROSIVE ANCHORS; APPLY CONTINUOUS SEALANT ALONG EDGES AND JOINTS. 9. REFERENCE ARCHITECTURAL DEMOLITION PLANS FOR FULL EXTENT OF DEMOLITION WORK REQUIRED. 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. EMS EQUIPMENT SALVAGE REQUIREMENTS 11.02.15 ALL DEMOLISHED NOVAR EMS EQUIPMENT SHALL BE RETURNED TO WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. EQUIPMENT TO BE RETURNED INCLUDES: EXECUTIVE CONTROLLER(S), IOM(S), CIM(S), CCM(S), ETC. PROVIDE DOCUMENTATION FOR ALL EQUIPMENT REMOVED IN ACCORDANCE WITH SPECIFICATIONS AND REQUIRED CLOSE-OUT DOCUMENTS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. 00 0 Ji (nom J�� � §OH U)O Z W U d Z U O Q w n F w; z 0 U z 0 1 Lu zwxwwa PROTO CYCLE: J Ww00a❑,W�0o -oau,wc.z❑a, �a W O W �aJ0, wa(n�CD z z a x 0 r 2 d} �inz0<0_-0 —LL UHC¢ z a Vo ONwa 0L1 0 � ❑ O LL GazN=O?zo=z Ow?¢;xw3:a=000a 4� vaiy 0 -Ow a- 0 ~ Q Ua1 J a_ a< d z w~❑ w w 0 z N ❑ of of z3: wOmwH a aQ_ OowOa u�_j F- W a,=2 DZK(n=J W u)W J z F� O~ a 0 W d n H W 00❑(n z FZ)} d o W Ir J Ir Ir aH 00 0 DRAWN BY: [7 _ Ed O Z ° a. PROTO CYCLE: � j N M 00 U N W C O W m a �� I Z 0 00 N � 'n N 1..1 C .0 ' (D 3 N HW _ 3 N J D Ll m o U) 13 a z U) Q O O � 00 KK DRAWN BY: w J Z C] O 7 L PROTO CYCLE: w a 00 O U) ��n V N � z � o CIO U) Q O z � w 0 .. C G O H (n Lo M 00 a J LU 0 ` r N w m D z m O ISSUE BLOCK I CHECKED BY: KK DRAWN BY: AG PROTO: 176 PROTO CYCLE: 013120 DOCUMENT DATE: 03/11/2020 WA S 0 Qw�- 41741 IQ O�Fss/�IST0- NAL \V 03/11/2020 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION REFRIGERATION ENERGY MANAGEMENT PLAN HEFREM1