2020.0103.BPP0008 3700 - RD1 REFRIGERATION DEMO PLAN - 3705 COPY0 G � MTE-1 32'-HQD6L1 - --��---Y--- - - -_ (RELOCATE) 3 I I'I I Iii L= -------- ------- COORDINATE PROJECT SCOPE OF WORK, SCHEDULE AND PHASING WITH CONCURRENT WALMART REMODEL PROJECT AND WALMART MECHANICAL CONSTRUCTION MANAGER. REMOVE EXISTING REFRIGERATED CASES, ASSOCIATED REFRIGERATION AND CONDENSATE PIPING AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF REFRIGERATION CASES AND EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. TYPICAL ALL SALES FLOOR CASES AND WALK-INS NOTED FOR DEMO OR REPLACEMENT. REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK- IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. � y i x /A ii 40 A i % J* % ii SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS DURING CONSTRUCTION. DEMOLITION INCLUDES BUT NOT LIMITED TO ITEMS SHOWN DASHED. MTF -6 MTF -6 MTF -4 MTF -5 12'-SMBT 12'-SMBT 8'-R3M20'-C2X-LGEP (RELOCATE) (DEMO) (DEMO) � (DEMO) � - - DEMO HOT CASE---,,,,,, � � I I FRONT REFRIGERATION DEMO PLAN 1/8" = 1'-0" REMOVE EXISTING REFRIGERATED CASES, ASSOCIATED REFRIGERATION AND CONDENSATE PIPING AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF REFRIGERATION CASES AND EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. TYPICAL ALL SALES FLOOR CASES AND WALK-INS NOTED FOR DEMO OR REPLACEMENT. SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS DURING CONSTRUCTION. DEMOLITION INCLUDES BUT NOT LIMITED TO ITEMS SHOWN DASHED. MTE-9 � MTE-9 24'-05DM-NRG 8'-05DM-NRG (RELOCATE) - - - - - (DEMO) REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK- IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. COORDINATE PROJECT SCOPE OF WORK, SCHEDULE AND PHASING WITH CONCURRENT WALMART REMODEL PROJECT AND WALMART MECHANICAL CONSTRUCTION MANAGER. REAR REFRIGERATION DEMO PLAN 2 118" = V-0" EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL DECOMMISSIONED EQUIPMENT AND CONSTRUCTION DEBRIS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE GENERAL CONTRACTOR WILL COORDINATE DISPOSAL OF OTHER MATERIALS WITH AES AND/OR WASTE MANAGEMENT. RECLAIMED REFRIGERANT WILL REMAIN IN THE POSSESSION OF WALMART STORES, INC. ON APPLICABLE PROJECTS INVOLVING GAS CONVERSION. THE CONTRACTOR SHALL ASSIST WALMART IN THE SCHEDULING OF APPROPRIATE CYLINDERS FOR THE COLLECTION OF REFRIGERANTS, WHICH WALMART WILL PROCESS THROUGH THEIR VENDOR RECLAMATION PROGRAM, OR USE IN OTHER WALMART EQUIPMENT, AT THE DISCRETION OF THE WALMART CONSTRUCTION MANAGER. THE CONTRACTOR AND WALMART CONSTRUCTION MANAGER MUST RECORD THE USAGE OR DECOMMISSIONING OF THE REFRIGERANT LOGS AT THE COMPRESSOR RACKS. INSTALLING CONTRACTOR WILL REMOVE AXP DEVICES MOUNTED ON WALK-IN BOXES PRIOR TO THE BOX DEMO AND HANDOVER TO STORE MANAGEMENT FOR SAFE STORAGE OF EQUIPMENT. GENERAL CONTRACTOR WILL PROVIDE NEW CONDUIT IN THE SAME LOCATION ON THE NEW WALK-IN BOXES. INSTALLING CONTRACTOR WILL NOTIFY CTS OF EQUIPMENT/CABLE RE -INSTALL DATE. CTS WILL ARRANGE FOR CABLING CONTRACTOR TO RUN WIRE AND RE -INSTALL AXP DEVICES. SALVAGE OF WALK-IN PANELS AND WALK-IN DOORS WILL BE THE RESPONSIBILITY OF THE PANEL MANUFACTURER. NOTICE: THESE SALVAGE REQUIREMENTS DO NOT INCLUDE HVAC EQUIPMENT, RACKHOUSES CONDENSERS, REMOTE CONDENSING UNITS, COOLING TOWERS AND FLUID COOLER REPLACEMENTS. ROLE OF WASTE MANAGEMENT: DELIVER CONTAINERS BASED ON DELIVERY DATES PROVIDED BY THE GENERAL CONTRACTOR. SERVICE FOR THE CONTAINERS AS REQUESTED. SUPPORT PERSONAL AT ALL TIMES DURING THE PROJECT DURATION. REPORTING FOR SERVICES THAT OCCUR AT THE END OF THE PROJECT. ROLE OF GENERAL CONTRACTOR (GC): CONTACT WASTE MANAGEMENT 72 HOURS PRIOR TO PROJECT LAUNCH TO HAVE ESTABLISHED SERVICES DELIVERED. WASTE MANAGEMENT C&D TEAM 1-866-338-2342 OR OAKLEAFCDTEAM@WM.COM BERNICE MURPHY 1-860-268-6317 OR BMURPHY22@WM.COM MICHAEL LASSONDE 1-860-268-6317 OR MLASSONDE@WM.COM ESTABLISHED SERVICES WILL BE DETERMINED FROM THE PROJECT ESTIMATION FORM FILLED OUT BY THE EOR. REQUEST ALL NEEDS FOR CONTAINERS FOR SERVICE VIA PHONE OR EMAIL TO WM'S NATIONAL ACCOUNTS OFFICE. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. %0z O C:=)� 00 0 DSOH �0 x LL} W Z) 0 ZWU a- ZOz w � z� 0 0 z 0 PROTO: O W� W 7V Z =Ow�wWww¢UO ¢H ~—w�w00❑xW0 (if a¢ ~ 0¢ W a n z O- w W 0,0-0< OW M QJCCa O W ❑ W z z¢ 0 2 a} U) ¢OHO=> rr z ¢Uo ONwQ ~wHwO=IE O �GaEP zNnozzzwlz�❑ OWEQ;xw3:¢=00o¢ 4� Mo-LL0KO~QU¢w J a_ ¢¢Q az J�❑WWp❑0N� aziwOmw,a�c)OwO¢ d UO_jFW¢,=2 Dz acn=J U) OwwzF�O�¢OWan�w z rD}00❑cnaOw�J��¢� %0z O C:=)� 00 0 N co E3 c d PROTO: Z 7V Z 2 DOCUMENT DATE: 03/11/2020 W U O W a I C � Z ❑ .c of vJ U) '^ b, m N 0 co Z C v z m 3 N W N 3 O N J 0 w L) o U) 13 a z O O %0z O C:=)� 00 Z o ��n N co w J D CO w a U) PROTO: 176 7V Z 2 DOCUMENT DATE: 03/11/2020 O VJ Q z Lu 0 .. C J O H (n m M 00 Lu rn 0 ` r N w m z m O ISSUE BLOCK CHECKED BY: KK DRAWN BY: AG PROTO: 176 PROTO CYCLE: 013120 DOCUMENT DATE: 03/11/2020 WA 0 Qz- 41741 O�Fss/SIS TER NAL 03/11/2020 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION REFRIGERATION DEMO PLAN SHEET: RD1