2020.0103.BPP0008 3700 - RD1 REFRIGERATION DEMO PLAN - 3705 COPY0
G
� MTE-1
32'-HQD6L1
-
--��---Y--- - - -_ (RELOCATE)
3
I I'I
I Iii
L= -------- -------
COORDINATE PROJECT SCOPE OF WORK, SCHEDULE
AND PHASING WITH CONCURRENT WALMART
REMODEL PROJECT AND WALMART MECHANICAL
CONSTRUCTION MANAGER.
REMOVE EXISTING REFRIGERATED CASES, ASSOCIATED
REFRIGERATION AND CONDENSATE PIPING AND
CONTROLS NOT BEING REUSED. COORDINATE
DISPOSAL OF REFRIGERATION CASES AND EQUIPMENT
WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. TYPICAL ALL
SALES FLOOR CASES AND WALK-INS NOTED FOR
DEMO OR REPLACEMENT.
REMOVE EXISTING REFRIGERATION EQUIPMENT
NOTED FOR DEMO OR REPLACEMENT, INCLUDING
(BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-
IN COILS, ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE
DISPOSAL OF EQUIPMENT WITH CONSTRUCTION
MANAGER. PATCH PENETRATIONS TO MATCH
EXISTING. REFER TO ARCHITECTURAL DRAWINGS.
� y
i x /A ii
40
A i %
J* %
ii
SALES FLOOR TO BE ACCESSIBLE TO
CUSTOMERS DURING CONSTRUCTION.
DEMOLITION INCLUDES BUT NOT
LIMITED TO ITEMS SHOWN DASHED. MTF -6 MTF -6
MTF -4 MTF -5 12'-SMBT 12'-SMBT
8'-R3M20'-C2X-LGEP (RELOCATE) (DEMO)
(DEMO) � (DEMO) � - -
DEMO HOT CASE---,,,,,,
� � I
I
FRONT REFRIGERATION DEMO PLAN
1/8" = 1'-0"
REMOVE EXISTING REFRIGERATED CASES, ASSOCIATED
REFRIGERATION AND CONDENSATE PIPING AND
CONTROLS NOT BEING REUSED. COORDINATE
DISPOSAL OF REFRIGERATION CASES AND EQUIPMENT
WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. TYPICAL ALL
SALES FLOOR CASES AND WALK-INS NOTED FOR
DEMO OR REPLACEMENT.
SALES FLOOR TO BE ACCESSIBLE TO
CUSTOMERS DURING CONSTRUCTION.
DEMOLITION INCLUDES BUT NOT
LIMITED TO ITEMS SHOWN DASHED.
MTE-9 � MTE-9
24'-05DM-NRG 8'-05DM-NRG
(RELOCATE) - - - - - (DEMO)
REMOVE EXISTING REFRIGERATION EQUIPMENT
NOTED FOR DEMO OR REPLACEMENT, INCLUDING
(BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-
IN COILS, ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE
DISPOSAL OF EQUIPMENT WITH CONSTRUCTION
MANAGER. PATCH PENETRATIONS TO MATCH
EXISTING. REFER TO ARCHITECTURAL DRAWINGS.
COORDINATE PROJECT SCOPE OF WORK, SCHEDULE
AND PHASING WITH CONCURRENT WALMART
REMODEL PROJECT AND WALMART MECHANICAL
CONSTRUCTION MANAGER.
REAR REFRIGERATION DEMO PLAN
2 118" = V-0"
EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS -BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL
DECOMMISSIONED EQUIPMENT AND CONSTRUCTION
DEBRIS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. THE GENERAL CONTRACTOR WILL
COORDINATE DISPOSAL OF OTHER MATERIALS WITH
AES AND/OR WASTE MANAGEMENT.
RECLAIMED REFRIGERANT WILL REMAIN IN THE
POSSESSION OF WALMART STORES, INC. ON
APPLICABLE PROJECTS INVOLVING GAS
CONVERSION. THE CONTRACTOR SHALL ASSIST
WALMART IN THE SCHEDULING OF APPROPRIATE
CYLINDERS FOR THE COLLECTION OF
REFRIGERANTS, WHICH WALMART WILL PROCESS
THROUGH THEIR VENDOR RECLAMATION PROGRAM,
OR USE IN OTHER WALMART EQUIPMENT, AT THE
DISCRETION OF THE WALMART CONSTRUCTION
MANAGER. THE CONTRACTOR AND WALMART
CONSTRUCTION MANAGER MUST RECORD THE
USAGE OR DECOMMISSIONING OF THE
REFRIGERANT LOGS AT THE COMPRESSOR RACKS.
INSTALLING CONTRACTOR WILL REMOVE AXP
DEVICES MOUNTED ON WALK-IN BOXES PRIOR TO
THE BOX DEMO AND HANDOVER TO STORE
MANAGEMENT FOR SAFE STORAGE OF EQUIPMENT.
GENERAL CONTRACTOR WILL PROVIDE NEW
CONDUIT IN THE SAME LOCATION ON THE NEW
WALK-IN BOXES. INSTALLING CONTRACTOR WILL
NOTIFY CTS OF EQUIPMENT/CABLE RE -INSTALL
DATE. CTS WILL ARRANGE FOR CABLING
CONTRACTOR TO RUN WIRE AND RE -INSTALL AXP
DEVICES.
SALVAGE OF WALK-IN PANELS AND WALK-IN
DOORS WILL BE THE RESPONSIBILITY OF THE
PANEL MANUFACTURER.
NOTICE: THESE SALVAGE REQUIREMENTS DO NOT
INCLUDE HVAC EQUIPMENT, RACKHOUSES
CONDENSERS, REMOTE CONDENSING UNITS,
COOLING TOWERS AND FLUID COOLER
REPLACEMENTS.
ROLE OF WASTE MANAGEMENT:
DELIVER CONTAINERS BASED ON DELIVERY
DATES PROVIDED BY THE GENERAL
CONTRACTOR.
SERVICE FOR THE CONTAINERS AS REQUESTED.
SUPPORT PERSONAL AT ALL TIMES DURING
THE PROJECT DURATION.
REPORTING FOR SERVICES THAT OCCUR AT
THE END OF THE PROJECT.
ROLE OF GENERAL CONTRACTOR (GC):
CONTACT WASTE MANAGEMENT 72 HOURS
PRIOR TO PROJECT LAUNCH TO HAVE
ESTABLISHED SERVICES DELIVERED.
WASTE MANAGEMENT C&D TEAM
1-866-338-2342 OR OAKLEAFCDTEAM@WM.COM
BERNICE MURPHY 1-860-268-6317 OR
BMURPHY22@WM.COM
MICHAEL LASSONDE 1-860-268-6317 OR
MLASSONDE@WM.COM
ESTABLISHED SERVICES WILL BE DETERMINED
FROM THE PROJECT ESTIMATION FORM FILLED
OUT BY THE EOR.
REQUEST ALL NEEDS FOR CONTAINERS FOR
SERVICE VIA PHONE OR EMAIL TO WM'S
NATIONAL ACCOUNTS OFFICE.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
%0z
O C:=)�
00
0
DSOH
�0 x LL}
W
Z)
0 ZWU a- ZOz
w � z� 0 0 z 0
PROTO:
O W�
W
7V
Z
=Ow�wWww¢UO
¢H ~—w�w00❑xW0
(if
a¢ ~ 0¢ W a n z O- w
W 0,0-0< OW M
QJCCa
O
W ❑ W
z z¢ 0 2 a}
U) ¢OHO=> rr
z
¢Uo ONwQ ~wHwO=IE
O
�GaEP zNnozzzwlz�❑
OWEQ;xw3:¢=00o¢
4�
Mo-LL0KO~QU¢w
J
a_
¢¢Q az J�❑WWp❑0N�
aziwOmw,a�c)OwO¢
d
UO_jFW¢,=2 Dz acn=J
U)
OwwzF�O�¢OWan�w
z
rD}00❑cnaOw�J��¢�
%0z
O C:=)�
00
0
N
co
E3 c d
PROTO:
Z
7V
Z
2
DOCUMENT DATE: 03/11/2020
W U O
W a
I
C �
Z ❑ .c of
vJ
U)
'^ b, m N
0 co
Z
C v
z m 3 N
W N 3 O
N
J
0
w
L) o
U)
13 a
z
O
O
%0z
O C:=)�
00
Z
o
��n
N
co
w
J
D
CO
w
a
U)
PROTO:
176
7V
Z
2
DOCUMENT DATE: 03/11/2020
O
VJ
Q
z
Lu
0
..
C
J
O
H
(n
m
M
00
Lu
rn
0
`
r
N
w
m
z
m
O
ISSUE BLOCK
CHECKED BY:
KK
DRAWN BY:
AG
PROTO:
176
PROTO CYCLE:
013120
DOCUMENT DATE: 03/11/2020
WA
0
Qz-
41741
O�Fss/SIS TER
NAL
03/11/2020
DOCUMENTS THAT DO NOT
HAVE THE ARCHITECT OR
ENGINEER OF RECORD
SEAL AND SIGNATURE
SHALL BE CONSIDERED
NOT FOR CONSTRUCTION
REFRIGERATION
DEMO PLAN
SHEET:
RD1