2020.0103.BPP0008 3720 - R2 REFRIGERATION PLANS - 3705 COPY4
10
NEW RCU-1 MOUNTED ON—""
N R4
ROOF. REFER TO 15.610
STRUCTURAL DRAWINGS
FOR MOUNTING DETAILS
— — -
H - <
OHM OHMHM 11'
15.625
15.611
15.609 15.609
MTE-9 RU-1
24'-05DM-NRG 14'-I -05-EC
(RELOCATE) (NEW)
7FINEW PIPE CHASE IN
ROOF. COORDINATE 4
SIZE AND LOCATIONER,
WITH STRUCTURE
(TYP) =
\-REFRIGERATION 6
PIPING DOWN
THROUGH ROOF. R4
(TYP) 15.603
15.618 2 5
15.612
15.603 R4 R4
—RUN LINES IN BASE OF CASE (T'
9
R4 115.609 15.609
C) RCU-1 CU -1
7 END -IM -05 -EC 14' -IM -05 -EC
R4 I (NEW) ( EW) E
15.612
8 15.603
R4 Eg
0
m
15.619
15.609
RCU-1
ND -IM -05 -EC
/Alr%Al\
2
0
0
0
0
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
REAR REFRIGERATION PLAN
1/8" = 1'-0"
Q
PIPING
SCHEDULE
RACK MTE
PIPE
DESIGNATION
PIPE
DESIGNATION
I
VERTICAL
SUCTION RISER
AS REQUIRED
LIQUID
ESTIMATED
TOTAL
LENGTH**
ESTIMATED
TOTAL
LENGTH**
E1
13/8****
1/2
11/8****
7/8****
0
0
0
0
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
REAR REFRIGERATION PLAN
1/8" = 1'-0"
Q
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
LU
PIPING
SCHEDULE
RACK MTE
PIPE
DESIGNATION
PIPE
DESIGNATION
HORIZONTAL
SUCTION
VERTICAL
SUCTION RISER
AS REQUIRED
LIQUID
ESTIMATED
TOTAL
LENGTH**
ESTIMATED
TOTAL
LENGTH**
E1
13/8****
1/2
11/8****
7/8****
F2
75
E2
13/8
J
1 1/8
5/8
11/8
165
E3
13/8
80
1 1/8
5/8
-
165
E4
13/8
F5
11/8
5/8
5/8
110
E5
21/8
7/8
1 5/8
7/8
N
145
E5A
13/8
7/8
1 1/8
5/8
105
25
E56
13/8
5/8
1 1/8
5/8
F9
25
E6
15/8
1 3/8
7/8
1 5/8
95
E7
7/8
85
5/8
1/2
13/8
80
E8
11/8
F12
7/8
1/2
1/2
80
E8A
5/8
7/8
1/2
1/2
35
E8.1
5/8
1/2
1/2
60
E8B
7/8
7/8
1/2
35
E8C
5/8
1/2
1/2
35
E9
1 1/8****
7/8****
5/8****
100
* RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR
REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT
CAUSES THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE
APPROVED BY ENGINEER OF RECORD.
**ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.
THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY.
****NEW PIPING
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
LU
PIPING SCHEDULE
RACK MTF
FjOO
af
(wj M Z(7Z
PIPE
DESIGNATION
HORIZONTAL
SUCTION
VERTICAL
SUCTION RISER
AS REQUIRED
LIQUID
0
ESTIMATED
TOTAL
LENGTH**
Fl
7/8
5/8
1/2
F_
100
F2
7/8
5/8
1/2
J
70
F3
11/8
7/8
1/2
O
80
F4
7/8
-
1/2
0
�
STUB
F5
11/8
-
5/8
Lu
STUB
F6
7/8
5/8
1/2
N
130
F7
1 1/8
7/8
5/8
105
F8
1 1/8
7/8
5/8
m
O
145
F9
11/8
7/8
5/8
110
F10
1 5/8
13/8
7/8
1
85
F11
15/8
13/8
7/8
60
F12
1 1/8
7/8
1/2
60
F13
7/8
1/2
1/2
140
* RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR
REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT
CAUSES THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE
APPROVED BY ENGINEER OF RECORD.
**ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.
THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY.
****NEW PIPING
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
LU
0
F-
0 WWa0FIX
DRAWN BY:
FjOO
af
(wj M Z(7Z
W
W ~ z w W d Z� F Z
w
CE
LL
QF LLWLLOOO Wo
0
_< ��o WW�zo-w
ifw ro¢gxofw¢cnafm
LL
(�z Z) 1:>o�wa
0
Wgo=oo WF -0=0
F_
-)oZNDO?ZWxZFz
zm=ofg
�
zmwp¢W
a
0z oM(Fj1_jWwowit
oo�WW¢W=2Dzwu)m
J
�WJ ZFFOF¢ OW d7FW
OUou=im0wly�OfOf<r
o
M
r�w
%0z
0
DRAWN BY:
ED_
O
Z
PROTO CYCLE:
N
00
W o
a
I W
Zo.=�
z
O N
Z
�
c ? c"
Z y 3
J
Ll m 0 0
o
M
13
Z
U)
Q
O
U
%0z
KK
DRAWN BY:
w
J
0
m
O
7
L
PROTO CYCLE:
w
a
00
O
V
N
M
�
z
�
=
o
M
U)
Q
O
Lu
0
�
0
(n
Lo
M
00
o
J
Lu
rn
0
`
r
N
w
m
z
m
O
ISSUE BLOCK
CHECKED BY:
KK
DRAWN BY:
AG
P ROTO:
176
PROTO CYCLE:
013120
DOCUMENT DATE: 03/11/2020
03/11/2020
DOCUMENTS THAT DO NOT
HAVE THE ARCHITECT OR
ENGINEER OF RECORD
SEAL AND SIGNATURE
SHALL BE CONSIDERED
NOT FOR CONSTRUCTION
REFRIGERATION
PLANS
SHEET:
R2