20180242 Drainage Report OriginalLLli AU 11 U RLLYLLING
DRAINAGE REPORT
SEPTEMBER 2018
Engineering
DESIGN -3 PERMIT � MANAGE
Table of Contents
an
1—
Project
Site
Analysis
and Data
Part
2
— Site
Development
Layout
Part 3 —Offsite Analysis Report
Part 4—Applicable Minimum Requirements
Part 5 —Permanent Stormwater Control Plan
Part 6 —Source Control BMPs
Part 7 —Construction SWPPP
Part 8 — Special Resorts and Studies
Part 9 —Other Permits
Part 10 —Operational and Maintenance Plan
Part 11—Bond Quantities and Financial Responsibility
Part 12 — Grading and Drainage Plans
APPENDIX 1—CALCULATIONS
APPENDIX 2 —GEOTECHNICAL REPORT
Project Engineer
Prepared by:
Contact:
RBE Project:
Prepared for:
Reference:
Project Engineers Certification
RB Engineering, Inc. (RBE)
PO Box 923
Chehalis, WA 98532
(360) 740-8919
Robertb6d RBEngineers.com
Robert W. Balmelli PE
17041
NPR Holdings LLC
Ubaida Mufrej
3655 E. Marginal Ways
Seattle, Washington 98134
ubaid a(a)safariexports.com
2014 WSDOE Stormwater Manual
"I hereby certify that this Drainage and Erosion Control Plan for Yelm Auto Recycling has been
prepared by me or under my supervision and meets minimum standards the Stormwater
Management Manual for Western Washington and normal standards of engineering practice.
hereby acknowledge and agree that the jurisdiction does not and will not assume liability for
the sufficiency, suitability, or performance of drainage facilities designed by me."
Project Engine
,V
y
18025 Drainage Report 1-1
PART 1 — PROJECT SITE ANALYSIS AND DATA
Permit Requested:
Other Permits Required:
Agency Permit No.:
Site Address:
Section, Township, Range:
Total Site Area:
Zoning:
Project Overall Description
Site Plan Review
Building Permit
Grading/Earthwork
::PA Review
Pending
939 Northern Pacific Rd
elm, Washington 98597
Section 19
Township 17
Range 02E, W.M
13.93 Acres
I - Industrial
The project includes the development of an auto wrecking yard named, Yelm Auto Recycling,
on lot 64300900200. Development will include 4 structures to be used for office space, storage
and general shop/maintenance space. Construction will also include onsite customer parking,
graveled and paved vehicle storage yards, water, sewer, and power service, stormwater
facilities. Frontage improvements are proposed, but will be deferred until required by the City.
Proposed Flow Control Improvements
The flow control facilities consist of bioretention cells, infiltration trenches and infiltration cells.
Test pits dug at the facility locations revealed infiltration rates more than 100 in/hr. For design
purposes, stormwater facilities were modeled with 20 in/hr. The soils report can be found in
Appendix #2 of this document.
Proposed Water Quality Improvements
The water quality facilities consist of bioretention cells. The bioretention cells are designed to
treat 91 % of the runoff profile. The bioretention cells utilize a 12 in/hr design infiltration rate with
a Ksat safety factor of 4.
Proposed Conveyance System
The proposed conveyance systems will consist of Type I catch basins and conveyance pipe in
various sizes to distribute stormwater to the proposed stormwater facilities.
Proposed Discharge Location
The project site will infiltrate all runoff at the proposed infiltration trenches/cells.
Downstream Condition
The site contains a ridge running SE to NW. The ridge effectively splits the site with stormwater
18025 Drainage Report 1-2
naturally draining to the east/west boundaries. The proposed improvements will have no effect
on the existing conditions as runoff will be contained on-site. Given the sites native well -
draining soils it is likely that stormwater presently is infiltrated before leaving the site.
Onsite Soils and Geology
An on-site soils report was completed for this project site be Parnell Engineering, LLC. A copy of
the report is included in Appendix 2 of this document. The report stated that infiltration on-site is
feasible with calculated infiltration rates exceeding 100 in/hr. The report recommends a design
infiltration of 20 in/hr be used. Based upon this information the storm design concept of
infiltration was selected.
18025 Drainage Report 1-3
PART 2 -SITE DEVELOPMENT LAYOUT
Project Topography
The site topography is nearly level to gently sloping. Elevations range from a high of 338 ft. at
the south-central portion of the site to a low of 328 ft. at the NE corner of the site.
Land Use and Ground Cover
Site vegetation consists of sparsely located conifer trees along with Scotch Broom, indigenous
brush and field grass. The subject site is bounded by rural residential property to the north,
undeveloped property to the east, Northern Pacific Road NW to the south, and a private drive-
way to the west.
Natural or Man -Made Drainage Patterns
The site contains a ridge running SE to NW. The ridge effectively splits the site with stormwater
naturally draining to the east/west boundaries. The proposed improvements will have no effect
on the existing conditions as runoff will be contained on-site. Given the sites native well -
draining soils it is likely that stormwater presently is infiltrated before leaving the site.
Tributary and Discharge Points of Flow
There are no tributary points of flow. The centralized ridge on-site prevents off-site flows from
entering the project.
Historical Drainage Problems
RBE is not aware of any historical drainage problems for this site.
Existing Utilities (Storm, Sewer, Water)
The existing utilities available to site include power, water, sewer, storm.
Erosion Potential
The site has a slight erosion potential. As part of the development plans a detailed Erosion
Control Plan and Storm Water Pollution Prevention Plan will be prepared and submitted with the
final drainage report for use during site construction to minimize erosion and mitigate
sedimentation within and off the site.
Critical Areas Onsite
The site does not contain any critical areas
Existing Fuel Storage Tanks
Review of the onsite parcels resulted in no evidence of existing fuel storage tanks above or
below ground for this property.
Groundwater Wells
The property does not include any onsite ground water wells.
18025 Drainage Report 2-1
Septic Systems
There are no septic systems on-site.
Aquifer Recharge Area
The site is within the City of Yelm Aquifer Recharge Area,
Wellhead Protection Area
The site is not within any wellhead protection areas for public utilities.
18025 Drainage Report 2-2
PART 3 - OFFSITE ANALYSIS REPORT
RBE staff visually inspected the site and offsite surrounding areas. With all runoff being infiltrated
an offsite analysis was deemed unnecessary.
18025 Drainage Report 3-1
PART 4 - APPLICABLE MINIMUM REQUIREMENTS
The minimum requirements for stormwater development are listed in Volume 1 of the 2012
SMMWW as amended in December 2014. Determination of applicable minimum requirements
area determined in Section 2.4 of the Manual.
Applicable Criteria
Areas
Existing Site Impervious Coverage
0.86 AC
New Plus Replaced Impervious Surface
12.45 AC
Vegetation Area Converted to Lawn or Landscaped Area
0.73 AC
Land Disturbing Area
13,22 AC
Start Here
Does the site hate See Redevelopment
35"n or more of Yes 2v iminum
existing impervious Requirements and
coverage? Floc* Chart
No Does the project convert (Figure 3.3)
acres or more of
Does the project vegetation to lawn or
result in 5,000 landscaped areas, or
square feet, or No convert 2.5 acres or more
greater, of nen plus of native vegetation to
replaced hard pasture?
surface area?
Dves the project
Yes Yes No result in 2,000 square
feet. or greater, of
new plus replaced
All Minimum hard surface area?
Requirements apply
to the nein and
replaced hard stufaces
and converted Yes No
vegetation areas. :1
Minimum Requirements Does the project have
.14 through 45 apply to land disturbing
the new and replaced activities of 7,000
hard surfaces and the Yes square feet or greater?
land disturbed_
No
Minimum
Requirement >r2
applies_
Figure 2.4.1 —Flow Chart for Determining Requirements for New Development
18025 Drainage Report 4-1
Based on the thresholds given in Figures 2.4.1, the project must address or comment on
Minimum Requirements #1 through #9. These requirements as they apply to the project are
discussed in more detail below.
Minimum Requirement (MR) #1 —Stormwater Site Plans:
This project meets requirement #1 by preparation of this Drainage Report and the Drainage
Control Plans.
MR #2 —Construction Storm Water Pollution Prevention Plan:
This project is designed to meet the intent of Construction SWPPP Elements #1 through #13 as
detailed in Section 2.5.2. A SWPPP will be created as a standalone document for this project
and submitted with the final drainage report.
MR #3 —Source Control of Pollution:
All known, available and reasonable source control BMPs shall be applied to the project to limit
pollutants coming in contact with stormwater. The BMPs for this project will be incorporated into
the project's Final Operation and Maintenance Plan.
MR #4 —Preservation of Natural Drainage Systems/Outfalls:
Proposed stormwater will be infiltrated on-site. There will be no effect to the sites natural
drainage.
MR #5 — On -Site Stormwater Management:
This requirement will be met by choosing any BMP and demonstrating compliance with the LID
Performance Standard. Bioretention and infiltration treches/cells will be utilized to infiltrate 100%
of the runoff onsite. Soil Amendments will be utilized for all pervious areas.
MR #6 —Runoff Treatment:
This project exceeds the criterion for this requirement. Bioretention cells will be used to provide
treatment. An oil control catch basin will be installed on the eastern portion of the lot where
vehicles will be initially stored and cleaned.
MR #7 —Flow Control:
This project exceeds the criterion for this requirement. Bioretention cells and infiltration
trenches/cells will be used to provide flow control. The LID Performance Standard will be met
by infiltrating 100% of the project.
18025 Drainage Report 4-2
MR #s — Wetlands Protection:
There are no wetlands within the proposed project limits.
Operation Maintenance:
An Operation and Maintenance Manual has been created as a standalone document for the
developer and property owners.
18025 Drainage Report 4-3
PART 5 - PERMANENT STORMWATER CONTROL PLAN
Existing Site Hydrology
Existing site hydrology is based on our site investigation, field topographic survey, aerial
topographic mapping and completed soils review for the subject project. The site consists of the
basins outlined below.
Pre -developed Basins
Current Land Use: Vacant Lot
Basin ID
Land Use Assumptions and Site Parameters
Land Use Cover
Slope
Acres
Hydrologic
Group
Comments
P1
Forested
Flat
0.34
A
Sidewalks
Flat
05
P2
Forested
Flat
6.77
A
A
0.34
P3
Forested
Flat
5.53
A
D2
Gravel
Flat
5.66
P4
Forested
Flat
0.59
A
Total
Sidewalk
13.23
0.03
Developed Site Hydrology
A complete summary for each developed sub -basin is included in the chart below. Because of
the existing topography, the site is considered a single basin for overall development purposes.
Basin Summary
Proposed Land Use: Commercial —Auto Recycling
Basin ID
Land Use Assumptions and Site Parameters
Land Use Cover
Slope
Acres
Hydrologic
Group
Comments
D1
Paved
Flat
0.15
Sidewalks
Flat
05
Landscape
Flat
0.14
A
0.34
D2
Gravel
Flat
5.66
Asphalt
Flat
0.82
Sidewalk
Flat
0.03
Roof
Flat
0.07
Landscape
Flat
0.18
6.76
18025 Drainage Report 5-1
D3
Gravel
Flat
4.28
A
Asphalt
Flat
1.15
vehicles over 25 Tons gross weight. (Trucks, Buses, Trains,
Yes or No
Roof
Flat
0.08
more on main roadway and 15000 vehicles or more on
Yes or No
Landscape
Flat
0.02
5.53
D4
Aspahlt
Flat
0.14
Sidewalk
Flat
0.05
Landscape
Flat
0.40
A
0.59
Total
13.23
Flow Control Analysis
The proposed storm water facilities were designed using the MGS Flood storm water model. This
project provides 100% infiltration and meets both the LID Performance Standard and Stream
Protection Duration. See Appendix #1 of this report for calculations.
Water Quality Analysis
The drainage basins delineated for this project will have openly exposed pollution generating
impervious surfaces. These tributary areas will be treated using the following treatment
technologies listed under the associated drainage basins. See Appendix #1 of this report to see
that each of the 4 developed basins will infiltration at least 91 % of the runoff profile through a
bioretention cell.
Pollutants of Concern
Oil Control Facility
A portion of this project will be required to provide oil control facility based on the analysis
below. An Oil Control catch basin will be installed in the area for initial intake and cleaning of
the vehicles. This area is in the eastern portion of the lot in Basin #3.
Oil Control Determination Chart
ADT 100 Vehicles or Greater er 1000 SF Buildinti Area
Yes or No
Site Subject to Petroleum Storage or Transfer Greater than 1500
Yes or No
Gallons per year,
Site have Parking, Storage or maintenance of 25 or more
vehicles over 25 Tons gross weight. (Trucks, Buses, Trains,
Yes or No
Heavy Equipment)
Road Intersection with measured ADT of 25000 vehicles or
more on main roadway and 15000 vehicles or more on
Yes or No
intersection roadway,
18025 Drainage Report 5-2
Phosphorus Control Required
Oil Control Determination Chart
Local Government Require Phosphorus control Yes or No
Enhanced Treatment Required
Oil Control Determination Chart
Site discharge directly to fresh waters or conveyance systems
tributary to fresh waters?
Yes
or No
Site uses infiltration strictly for flow control and the discharge is
within 1.4 mile of fresh water designate foraquatic life?
Yes
or No
Site an industrial project site?
Yes
or No
Site a commercial project site?
Yes
or No
Site a multi -family residential project site
Yes
or No
UGA — Fully controlled and partially controlled limited access
highways with AADT 15000 or greater
No
UGA - All other roads with and AADT of 7500 or greater.
No
Outside UGA - Roads with and AADT of 15,000 or greater
unless discharging to a Strahler order Stream or large
No
Outside UGA - Road with an AADT of 30,000 or greater if
discharging to a 41h Strahler order stream or larger.
No
Selected BMP's: (See Appendix #1 for sizing)
Basin D1
Water Quality Facility: BMP T7.30 — Bioretention Cell (39' L x 3' W)
Flow Control Facility: BMP —Infiltration Trench (28' L x 4' W x 3' D)
Basin D2
Water Quality Facility: BMP T7.30 —Bioretention Cell (520' L x 8' W)
Flow Control Facility: BMP —Infiltration Cell (532' L x 4.6' W)
Basin D3
Water Quality Facility: BMP T7.30 —Bioretention Cell (543' L x 6.5' W)
Flow Control Facility: BMP —Infiltration Cell (500' L x 3.9' W)
Basin D4
Water Quality Facility: BMP T7.30 —Bioretention Cell (27' L x 4' W)
Flow Control Facility: BMP —Infiltration Trench (26' L x 4'W
x 3' D)
18025 Drainage Report 5-3
PART 6 _ S®URCE C®NTR®L UMP
The following permanent source control BMPs will be utilized for this project and will be included
in the final Operation and Maintenance Manual submitted prior to final project acceptance by the
County.
Landscape and Lawn Vegetation Management
18025 Drainage Report 6-1
PART 7 -CONSTRUCTION SWPPP
A stand-alone SWPPP will be prepared for this project and submitted with the final drainage
report.
18025 Drainage Report 7-1
PART 8 - SPECIAL REPORTS AND STUDIES
1. Soils Report — Parnell Engineering, LLC —See Appendix 2 of this document.
18025 Drainage Report 8-1
PART 9 - OTHER PERMITS
The following is a list of regulatory permits needed for this project and copies are attached if
available.
SEPA Review —Pending Determination
Grading and Drainage —Pending Final Drainage and Grading Plans
Building Permits —Pending Design and Permitting
18025 Drainage Report 9-1
t
A final Operation and Maintenance Manual has been prepared as a separate document.
18025 Drainage Report 10-1
Facy agreements Cl"d financial guarantees when required will be reviewed by the applicant
and executed at the appropriate time determined by the reviewing agency.
18025 Drainage Report 11-1
PART 12 - GRADING AND DRAINAGE PLANS
The half size drawing of the site civil grading and drainage plans are included on the following
pages.
18025 Drainage Report 12-1
� � I'f ' ;o I I®I �• ' ( ''% � SEE SHEET C3.2 ` � �� '� -� \ � � 1 %
:.
1(
I
T � ��.� I::.. -.-r.:
- o � � IIII J .:'. :�. � -1
I 1 5 � II � I � � . {.: �. .
I
3 rl � j ! .
I
r �.
rt�o i !Ifs; I j j i ..:_ + � � \�
Cp�, r ', - t 1 j
�i DRAINAGE 'V' DITCH � � t
� 1 � III % �3:1 SIDE SLOPES (TYP.): - � �% -
� j, � I E t 'r ..
N � .f
I M 't ! -
moo\ ( � (! �� : � �_. �: i l ..
Structure Table
Structure Table .`�
Structure Name
I Detcils
Structure Name
I Details
RIM = 337.22
RIM = 338.94
CB �1
N:7321.92
N:7630.38
TYPE 1
E:25425.74
CB �(8
E: 25748.57 �-
K
INV OUT (N) = 335.40
TWE 1
INV IN (S)= 335.83. 3
INV OUT (NE) = 335.83
�
II
RIM = 337.53
-
�'
N:7377.60
m'
RIM 336.37
CB �2
E:25419.44
N:7677.62
TYPE 1
INV IN (S)= 335.12
CB #g
E: 25810.07
INV IN (NE)= 335.70
-rypE 1
INV IN (SW)= 334.56
INV OUT (W) = 333.92
INV IN (SE)= 334.56
K
INV OUT (NE) = 334:56
U
�
RIM = 339.15
S
<
N:7409.92
U
RIM = 336.75
CB �3
E: 25480.80
CB #10
N: 7616.49
TYPE 1
INV IN (NE)= 336.60
TYpE 1
_
E: 25668.26 � _
INV IN (SE)= 336.60
INV OUT (NW) = 334.98
INV OUT (SW) = 336.60
3
RIM = 334.17 . .
RIM = 339.25
N:7748.76
CB /f4
N:7370.63
C8 #11
E: 25883.11
TYPE 1
E: 25509.00
TWE 7
INV IN (SW)= 332.30 '
INV OUT (NW) = 337.13
INV OUT (N W) = 331 97
RIM = 339.60
RIM = 332.96 �
N:7842.47
CB j/5
E: 5599 27
CB {{12
E: 25757.71
TYPE 1
INV IN (S)= 337.27
SPILL CONTROL M.H.
INV IN (SE)= 330.80'
INV OUT (SW) = 337.27
INV OUT (W) = 330.80
RIM = 339.53
RIM = 336.20
CB �6
N: 7387.45
CB y13
N:7281.22
TYPE 1
E: 25617.40
TYPE 2 BEEHIVE OVERFLOW GRATE
E: 25439.65
INV OUT (N) = 337.70
INV OUT (NW) = 333:70
RIM = 338.23
RIM = 333.50
CB /j7
N:7556.84
CB X14
N: 7664.56
TYPE 1
E: 25760.50
TWE 2 BEEHIVE OVERFLOW GRATE
E:25928.31
INV OUT (N) = 336.20
INV OUT (NW) = 33 00
� � ,
' IE 3$,50 � \ `\ � \ � � {
DRAINAGE 'V" DITCH �' e � % � I
:1 SIDE SLOPES (TW.) I �Y SCALE: 1'=30 FEET
I � \' / ` FG 333.37\/ 12�' 12'0 HDPE ®1.01%�' 0 15 30 60
.\ . � � � .
� ` t ` ly 1 �
- \ � ��\\ FG 335.98
� � 1
. \ � -.� i
� .\ \
-I � � SFT I
.�\ - ..� . �\\ I \\ �., � yGA r
- � \ \ ` rr %
� .. �. � ti\\\ t , �\ 1
' `. _ �.
� (I I _ t � � _ � � �� � .�. �. .. �� .�- � \ \ ' �I�� FG 334.42
iI ? � I � t 1 1 � ' 1 . � .i - ' \ FG 336.22k t
e. ; "'=rte Ih�'y C3.4 n � . '� ,m � � � a ~y - � - �� ;t _ \ ' � � s , _ � �a' w [ � � � n
� oMATCH EX. i � I E 333:82 � � - - 1 .• .. n a � .tom @ .+ A4 � w �ro'�,.
\ ` 1 ( I d 20' 12"9 HDPE @ 0.50% . � � - �� � � � �. / � � ... . � � i �/ ' � � � \ � - . ` �� .` � t r
III � • ... \
J _ /. � - � - 78'. 8"@ HDPE. ® 1.64%� _ � ' t
,'. S< 69''B••A HDPE Pipe ®1.30% j �`'. � - - { _
G { f � � . . I CB ',<2 - - �' - - - - - � } - 134' 8"0 .HDPE ®0_50% - - - - - - - - - - - - - - � FG 34120_ - CB �8 1 �. ; . \ '. C8 f/9 . � , 8..� HDPE ®2.22% � 1
----� � � I.It � ,_ �• - --------- --- - - - -- 107. gq � CB#11� {
j FG 337.6 r � � � � _ � � \;
- 3 ! I � . I �I I � OS C � i�3 ( I G 340.87 I _ , � , , t 1
r
`56' 8"0 HDPE ®0.50% i FG� 337.88 ! FG 339.67 � 74' 8"0 HDPE ®O.SD% FG 336.27
� r e FG 338.91
'I { { � e FG 339.26 OC FG 340.30 I FG 338.56
FG 337.88 � { C8 a °' \ \ � FG`\\, 07 � I
' .. ... •I' :: 0B e `� /`/�\\ e 1 � e? FG 335.36
I a I I ' :{ - I � � % 48' 8"0 HDPE Pipe ®1.10% e � I � _. „' \ I � FFG 338.87 • s � ` d� ` / i
- � I � I •' ':: FG 339.50 { - ... ;. ^� �v` � e w :.......• N \\\
chi •� � • •_ • ;C6 �`�, : e f e{� I -(_ ' � ' I o .y'h�' •:: (; .., ; ::�:: � v ! FG 335.78 �' � � 26' LONG x 4' WIDE x 3' DEEP 4
f FG 339.92 I
4 ` � M nCH +EX.'j j � � � ` � ` / ' e ' a: • ' • "' :: � m • � INFILTRATION TRENCH C3.4
f -i FG 340.15 ® w{ � � ; : `����r
1 _ FG 338.54 OFFICE , gI a { � IZ
28' LONG x 4' NIDE x 3' DEEP � ' • J - I I F.F. 339.5 \ \ FG 341.58 � I � ' o -i : ,, FG 336.76 ��� I
�'4 INFILTRATION ENCH G 337.22 OFFlCE e I � o ' ' DO NOT
...
...
7{t :� ' • � 1 F.F. 340.5 , rr >a
{ �r ! {I {I � .. : ;' j I I > y i I FG 335.68 CONSTRUCT
DEFERRfD� 10' 6"0 PVC ®0.00% ' ' � • • ' � "`�. � ::�--�BT 8"A HDPE Pipe ®0.50% ; ; :: � C STORAGE I 'tt--��
DO NOT I � J � � : � � .: ` � i CB �4 .f .�• ..-.._.-_ .:._e e e e e e e e o e ''.F ..' .. B N7 F.F. 339.0 ` I� SHOP 1 14' 6"0 PVC ®0.00% \ � !�!O
l M
ele t � ' -y� rQ 4•
COP�ISTRUCT � � ro � �� � FG 341;51 FG 341.73 t F.F. 337.0 � •CB j/74 O 6.,
� - �' FG 340.04 1 �• FG 340.40 CB 10 �'" "
11 CB 1!#1 r o I ° ,_. � ; ; FG 340.75 FG 341.51 ' ; %. � ` N/ � � � � ` S "���-^
II ( 1 � I % I r`ti/ � �l � �� � ••%'::::\....• :�:. I � � ` O�;>ry /d% ,
1 0 �` FG 340.43 o n FG 347.65_ .•✓ � ;�; ::: _ _ C FG 337.45 ��� f.`
t � ! �"�, I FG 340.35 r;;, .': FG 340.45 FG 340.06 FG 341.21 • • :.i,', • : ; - • •
t� ! 3 i CB j/6 / FG 347.85. ::�-� � �::':• ;•:F.::.: - :1• • • ; :::.: .I .. ;r• ; : ,ems•' � w <
I V _ _ _ _ _ __ -� _ ���' _ _ _ z
.s � .a=-
_ ..L __ _ �_ :��_ _ _ _ _ _ _ _ ,F- ;1: •)•' ,� t ! it
� T:,�: - -
=�. - -
�€ -
- � -,-- -
'4. _
�; w:
�� � �:�• f
'FG 340.7 •� -'�;r; �;:
2•
�G�
I
•F 340.9•
- 1 •FFG 337 � 5
t
'�: '�'
.4
�;1-,
�� _
.w•r
i
� : ��
- .��_•,:
:�
� .��
-�
�,� � _ •z:
- - - - '=tir
`A- �' �'•c- Y
- �:
F _ :': JM}., .f)0 '.40.08 PLA _ _
j �•� '•.f'- L Z. T :5' ��; E.E.. • � • �J^
�,'' ' • C+? u;r Tom- r�-r--� ? �-•-,---" �. •0.+.'- - r ��- � .: - •� _•�' � �> '_ P KCP • _ •C -t • . � • G-�., •4�3 •-•--- " �e�--cam '�= � -?a=- c caw ° .a_ ---are �-
A% � CA r - .}} •K - .3 . .x R. �-- - ..x. • iY. • N K ..9} k . x' - :N. - •j• LL,,..,, `
� ..� ti • W•' •mow•` `W •• • , .'=r �}` �..•;W::-�._ H. • W (N K 1E+� RT-�
_ a ,- w "... �....`TM � w � � s N ....�. , .. • - x w m _MATCH 'EX: ��-N -�i • • . , w � - ::� .. a ..� � N'� x ...::K � �: .. , x w �N N N � :v w -
--cT-----------.�---------� � -MATCH EX. -------- __---��-.`�-'- �-----�-----MATCH EX. -'=-
MATCH EX.%-
--5s'?g s s s ss 3m9� mss= r � ss i _ss 390 ss � SS 55 �' s - ss � � � - - - - - - -
c„ NORTHERN PACIFIC RD NW347-T -}41- --� n ,SyO ss __ },yg2s ss 338, _ - � s �i \� =_s ss �s ss -
� - � `
i � � � _ _ � `
a
52 27'38" E
2531. t
C7
z
J
U
r
U
W
0.'
z
aZ
J
W
C7
Q
Z
Z
Q
U
Z
W y_CC
Q F 7{
e� z �.
Q
Gl �
� ~ Zai
e�
C' a
W } �
zm
.. c�
� m�
e Q as
JOB NUAiBER
18025
ORANING NAME
18025 3.1 GDPL
C3.1
6 OF 15
J
O
m
_
o
N
N)
K
K
d'
�
II
�'
m'
m
m
v
m
�
�
K
U
�
S
<
�
U
D
Vl
3
C7
z
J
U
r
U
W
0.'
z
aZ
J
W
C7
Q
Z
Z
Q
U
Z
W y_CC
Q F 7{
e� z �.
Q
Gl �
� ~ Zai
e�
C' a
W } �
zm
.. c�
� m�
e Q as
JOB NUAiBER
18025
ORANING NAME
18025 3.1 GDPL
C3.1
6 OF 15
J
O
SCALE: 1"=30 FEET
0 15 30 60
� f+`
r F,
/ Q45
DQ'�l
0 `�` �
/ VP <
� P���°�
�. �Q-�Pc
�P Q VJQO
Q�cv� P�'�� C
/' ��p�
/ -�" �
/ f
/� �/
X21 '
'��� /,, �
i .3a' /' l
i
3�' � i
i
� � .352
i � ,•
/ � i
7
,� «—`'
_M�� � ' i
— � i ;,t'
/� �j
�� i / �///
500' LONG x 3.9' WIDE
INFlLTRATION CELL
BOTTOM ELEV. = 327.5
i i i� , � ,ice �-� -��_
/ -
i
� jai � // �� �- _-�;.
/ i �'. ��
{�
i � —� / %i
OVERFLOW w � � i i / i �� � � � � .. s' �• .. '. �.� —
�=330.5 i� � ii / ,. '_ ..�33'� / - � � � i� ..
� i � � 330_ 331 3 2 ?33 � - � _ � � � - -�5.% j �' - � 1 -
0.331 g32 33�_ 330 � � � � � .. - 543' LONG x 6.5' WIDE _ - " . 3 � -- � �. � � ' -- -
9 / i i � '-• �BIORETENTION CELL 5 ` - :�� / �. i =-"' -�
330 2 32$ / 3i i r � � / � � � �. .% — — J BOTTOM ELEV. = 329.5 C3.3 "- � l �' � .. /-�
� �/ -
i � / � / / i i �- - _ . i ''•� ./ . • - .--ELEVATION IN 330A5 SPILLWAY C3.4/ - � . /,' - , . — /.' .. � � � .
/ / .: / '_ /
� /
rr- � � �
- - -- �
_ _ �.
�/ � 1. f - j �% - �, �--- -^
�� .
� i � �
:� '.
_'
\ .:- �.
/ f �
.. : /. .
�, . - /. ..
_—_ �/ `
/ - � � %' '
/ / / DRAINAGE "V" DITCH r � - / � / , :• . � �. j ��. -' � ` - -. �-1 : .. -
;, r r - _ 3:1 SIDE SLOPES (TYP.)' � _ _ .. f � ... - - -.� f — 31 �_ ='•� �_ -' �y � ... � \ � � � ' �m � - � � .
- _ .. -- m
1 � \
/ ' r r_ 1 j .�' �� J - �'�'. ,. . �l�.� .GRAVF�. YARD STOR,4GE AREA -.. � � .- _ �'� . '` .
/ �� A r.: i � ��_< 3-=-- �j - ' - � - � - - �STRrP'T�jP 4"=50D AND FINE•. � I . .- '� � � .� . � �
/ ry�y"'. �1�'�/r - � �_�� .: . � .. � GRADE. ADD.C5BC.AS NEEDED. " _ � .. � • �
�• � \ .. � _
\mss �' / : � �.' � . - � ' � .� - . �'
�-
1 �� � '' '
�� " .\ �-i
• -. -� .
.. - \ .._
_ f /:. � . ' . _ - - .. � \. _ \ .. ate, _\ .. t - - - _
� / - - � \ it ^' _
i'� � � _ '�
/ -`
j _ - - � � .- �. 333 � .. - � _ �._
/ .. - � - _ _
/ _ 532' LONG x 4.8' W1DE - \ - � . - `'�
' - �- � � � � -. __ 332. _. � � _ .520' LONG x 8' WIDE 5'.. �. - -~ �_ _ .. .� ... �. - �-------___ _
� -INFILTRATION CELL _ �BRIORETENTION CEL c3.3 l '
� /- � '� � w `9'- "BOTTOM ELEV. 327.0 21 'WIDE INTERNAL SPILLWAY' -1- BOTTOM ELEV. `329.0_ — — — ` � --_ RAINAGE "V' DITCH - - , � .-. � � - - - _ -
_ _ �_ '\ 3:1 SIDE SLOPES (TYP.) — � '�- —
_ / :. N _ ..
_ _- .. - � -
' EIEVATlO- -330 0 - - - - C3.4� - - �- - '
� � �-�-------=---='---331- -- - _ .. � - - -- - � '.� -_
�.'
__ L^
— :�
' � 329 330 ���331 331 — — — - - - - - - �. _ � .-• �-.;:,;-
' 330 -. '•" �_--- _..
r� �J' 329 331-330- —... _ ! _ �-_ E a.3a�-=-
_ � � z,.. —. .. - �_�
— —� — — _, \
_ - � 3?3?
C
Q�1
� � _ - _-
`�t f� � __
A -
�lJ i , _
' l/11
-33�— y �
�,
=—'333' —
_Z3; 33�. —
0
N
w
0
z
mm to
m
m_
o
of
3I
o n
�
�
N
� II
m
m
m
m
w
o
�5 �
v
� '��
o <
v
o
ti
3
c�
z
J
U
}
U
a
z
L�
0
U
Z
J
�a
z
ow
��
a
U Q
0
��
�
�
Z
a
��
m��-
m
Cf
C
�
�
��
¢
'i
a
� �
W
1-
a
��
�
�
�+7/
`�
4
••
�
�
�
W
m�
oao
d
' wvxwn,n6Nmw
'
DauBnnetare,w,
JOB
NUMBER
18025
ORAINNG NAME
18025_3.2_GDPL
C3.2
7
OF 15
OVERFLOW RISER N1TH SEDIMENT CONTROL STRUCTURE
PER DETAIL THIS SHEET
BOTTOM INFILTRATION
FG = 331.45
4' WIDE x 3' DEEP x 28' LONG
INFILTRATION TRENCH
PER DETAIL 4 ON SHEET C3.4
BIORETENTION W/ INFILTRATION TRENCH SECTION
OVERFLOW RISER WITH SEDIMENT CONTROL STRUCTURE
PER DETAIL THIS SHEET
BOTTOM INFlLTRATION
FG = 329.75
GRAVEL YARD
N. T S
4' NIDE x 3' DEEP x 26' LONG
INFILTRATION TRENCH
PER DETAIL 4 ON SHEET C3.4
39' LONG x 3' N1DE
BIORETENTION CELL
PER DETAIL THIS SHEET
i
I_
BOTTOM ELEVATION PER PLAN I.
• �EG �. �. .. BIORETENTION SOIL
RIORFTFNTION FG = 339.E
27' LONG x 4' WIDE
BIORETENTION CELL
PER DETAIL THIS SHEET
BIORETENTION W/ INFILTRATION TRENCH SECTION
520' LONG x 8' WIDE
BIORETEN710N CELL
PER DETAIL THIS SHEET
N.T.S
— e�— _EG _ .� —'
— WQ ELEV. ..�j(,%
= 330.0 � 100 YR ELEV. = 330.0
ELEV. = 327.0
532' LONG x 4.6' MADE
INFILTRATION CELL
BIORETENTION W/ INFILTRATION CELL SECTION
N. T S
500' LONG x 3.9' WIDE
INFlLTRATION CELL
3' WIDE BERMS
ELEV. = 331.0
_ �
��
YR ELEV. _
WQ ELEV.
= 330.5
ELEV. = 327.5 �/
3.9'�21.1'�6.5'�
.c
GRAVEL YARD
543' LONG x 6.5' WIDE
BIORETENTION CELL
PER DETAIL THIS SHEET
BIORETENTION W/ INFILTRATION CELL SECTION
N. T S
3• COARSE COMPOST
IN PONDING AREA
'�.9�:79�:1d
-_
g1+ECig2
OF
.f'.
YAftKS
N
w
_��
a
0
0
z
N
m
�
�
N Vl
m F=
m
m
z
°f
o m
� �
�
`�
i� s
i
� v
U
N
d
3
(.�
Z
J
U
}
U
W
�
J
�
L�
O
U
J_
Q
F-
W
Z
Q
W
F
O
Z
W
a
Z
Q
�
'
m��
�
K
�
rox�,�ww
C
a ��
,L
a
�
�_
f .�
■
� d
C
W
a
W
4
�
Z
•�
� rn3
� m�
�
W
a :_
BOTTOM INFlLTRATION
FG = 329.75
GRAVEL YARD
N. T S
4' NIDE x 3' DEEP x 26' LONG
INFILTRATION TRENCH
PER DETAIL 4 ON SHEET C3.4
39' LONG x 3' N1DE
BIORETENTION CELL
PER DETAIL THIS SHEET
i
I_
BOTTOM ELEVATION PER PLAN I.
• �EG �. �. .. BIORETENTION SOIL
RIORFTFNTION FG = 339.E
27' LONG x 4' WIDE
BIORETENTION CELL
PER DETAIL THIS SHEET
BIORETENTION W/ INFILTRATION TRENCH SECTION
520' LONG x 8' WIDE
BIORETEN710N CELL
PER DETAIL THIS SHEET
N.T.S
— e�— _EG _ .� —'
— WQ ELEV. ..�j(,%
= 330.0 � 100 YR ELEV. = 330.0
ELEV. = 327.0
532' LONG x 4.6' MADE
INFILTRATION CELL
BIORETENTION W/ INFILTRATION CELL SECTION
N. T S
500' LONG x 3.9' WIDE
INFlLTRATION CELL
3' WIDE BERMS
ELEV. = 331.0
_ �
��
YR ELEV. _
WQ ELEV.
= 330.5
ELEV. = 327.5 �/
3.9'�21.1'�6.5'�
.c
GRAVEL YARD
543' LONG x 6.5' WIDE
BIORETENTION CELL
PER DETAIL THIS SHEET
BIORETENTION W/ INFILTRATION CELL SECTION
N. T S
3• COARSE COMPOST
IN PONDING AREA
'�.9�:79�:1d
T'��i
NATIVE SUBGRADE, DO NOT
COMPACT NATIVE MATERIAL
UNDER 810 -RETENTION CELL.
BIORETENTION PLANTING NOTES
BIORETENTION SOIL MIX NOTES:
1.810RETENTION MIX SHALL MEET THE DEFAULT BIORETENTION SOIL MIX AS DETERMINED IN THE
D.O.E STORMWATER MANAGEMENT MANUAL UNDER VOLUME 5 PG. 7-18.
ALTERNATIVE:
CUSTOM BIORETENiION MIX MAY BE ACCEPTED IF TESTED TO MEET REQUIREMENTS IN THE
D.O.E. STORMWATER MANAGEMENT MANUAL AND APPROVED BY THE CITY OF YELM.
ALL BIORETENTION AREAS SHALL BE SEEDED BY AN APPROVED HYDROSEEDER WHICH UTILIZES WATER AS THE CARRYING AGENT, AND MAINTAINS
CONTINUOUS AGITATION THROUGH PADDLE BLADES. IT SHALL HAVE AN OPERATING CAPACITY SUFFICIENT TO AGITATE, SUSPEND, AND MIX INTO A
HOMOGENEOUS SLURRY THE SPECIFIED AMOUNT OF SEED, WATER, FERTILIZER AND MULCH.
GRASS SEED
ALL GRASS MIXTURES SHALL CONTAIN FRESH, CLEAN, NEW CROP SEED. SEED IS TO BE MIXED MECHANICALLY ON THE SITE, OR MAV BE MIXED BY
THE DEALER. IF SEED IS MIXED ON-SITE, EACH VARIETY SHALL BE DELIVERED IN THE ORIGINAL CONTAINERS BEARING THE DEALER'S GUARANTEED
ANALYSIS. IF SEED IS MIXED BY THE DEALER, THE CONTRACTOR SHALL FURNISH TO THE LANDSCAPE ARCHRECT THE DEALER'S GUARANTEED
STATEMENT OF THE COMPOSITION OF THE MIXTURE AND THE PERCENTAGE OF PURITY AND GERMINATION OF EACH VARIETY.
GRASS SEED SHALL BE PURCHASED FROM A RECOGNIZED DISTRIBUTOR AND SHALL BE COMPOSED OF THE FOLLOWING VARIETIES MIXED IN THE
PROPORTIONS INDICATED. SEED SHALL MEET THE MINIMUM PERCENTAGES OF PURITY AND GERMINATION SPECIFIED. SEED •A• THROUGH •H' SHALL
BE APPLIED AT THE RATE OF 240 POUNDS PER ACRE, UNLESS OTHERWISE SPECIFIED BELOW ON THEAPPROVED PROJECT PLANS.
WATER
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING AWELL-ESTABLISHED STAND OF GRASS.
WATERING IS SUGGESTED AT LEAST TWICE A WEEK DURING THE GROWING SEASON AND AS NEEDED AFTERWARDS.
WHEN GRASS IS REQUIRED AS A BEST MANAGEMENT PRACTICE ON STEEP SLOPES, NON -GERMINATED SEEDS SHALL BE KEPT MOIST, AND ROOTED
GRASS SHALL HAVE AT LEAST 1 INCH OF WATER PERMONTH DURING THE PERIOD FROM MAY 15 THROUGH SEPTEMBER 15.
FERTILIZER
FERTILIZER SHALL BE A COMMERCIAL MIX WITH A 16-14-8 FORMULA, INCLUDING 50 PERCENT SLOW RELEASE NITROGEN, OR THAT MIXAS
RECOMMENDED BY THE SEED SUPPLIER AND APPROVED FOR USE BY THE LANDSCAPE ARCHITECT.
GRASS MIXES USED SHALL MEEF THE FOLLOWING SPECIFICATIONS: % BY WEIGHT
FESTUCA ARUNDINACEA/TALL FESCUE 33% HYDROSEED
FESTUCA RUBRA/RED FESCUE 33%HYDROSEED
COLLUM PERENNE /PERENNIAL RYEGRASS 33% HYDROSEED
5 BIORETENTION CELL
N. T. S
APPROVED FOR CONSTRUCTION
or:
-_
g1+ECig2
OF
.f'.
YAftKS
N
w
a
0
T'��i
NATIVE SUBGRADE, DO NOT
COMPACT NATIVE MATERIAL
UNDER 810 -RETENTION CELL.
BIORETENTION PLANTING NOTES
BIORETENTION SOIL MIX NOTES:
1.810RETENTION MIX SHALL MEET THE DEFAULT BIORETENTION SOIL MIX AS DETERMINED IN THE
D.O.E STORMWATER MANAGEMENT MANUAL UNDER VOLUME 5 PG. 7-18.
ALTERNATIVE:
CUSTOM BIORETENiION MIX MAY BE ACCEPTED IF TESTED TO MEET REQUIREMENTS IN THE
D.O.E. STORMWATER MANAGEMENT MANUAL AND APPROVED BY THE CITY OF YELM.
ALL BIORETENTION AREAS SHALL BE SEEDED BY AN APPROVED HYDROSEEDER WHICH UTILIZES WATER AS THE CARRYING AGENT, AND MAINTAINS
CONTINUOUS AGITATION THROUGH PADDLE BLADES. IT SHALL HAVE AN OPERATING CAPACITY SUFFICIENT TO AGITATE, SUSPEND, AND MIX INTO A
HOMOGENEOUS SLURRY THE SPECIFIED AMOUNT OF SEED, WATER, FERTILIZER AND MULCH.
GRASS SEED
ALL GRASS MIXTURES SHALL CONTAIN FRESH, CLEAN, NEW CROP SEED. SEED IS TO BE MIXED MECHANICALLY ON THE SITE, OR MAV BE MIXED BY
THE DEALER. IF SEED IS MIXED ON-SITE, EACH VARIETY SHALL BE DELIVERED IN THE ORIGINAL CONTAINERS BEARING THE DEALER'S GUARANTEED
ANALYSIS. IF SEED IS MIXED BY THE DEALER, THE CONTRACTOR SHALL FURNISH TO THE LANDSCAPE ARCHRECT THE DEALER'S GUARANTEED
STATEMENT OF THE COMPOSITION OF THE MIXTURE AND THE PERCENTAGE OF PURITY AND GERMINATION OF EACH VARIETY.
GRASS SEED SHALL BE PURCHASED FROM A RECOGNIZED DISTRIBUTOR AND SHALL BE COMPOSED OF THE FOLLOWING VARIETIES MIXED IN THE
PROPORTIONS INDICATED. SEED SHALL MEET THE MINIMUM PERCENTAGES OF PURITY AND GERMINATION SPECIFIED. SEED •A• THROUGH •H' SHALL
BE APPLIED AT THE RATE OF 240 POUNDS PER ACRE, UNLESS OTHERWISE SPECIFIED BELOW ON THEAPPROVED PROJECT PLANS.
WATER
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING AWELL-ESTABLISHED STAND OF GRASS.
WATERING IS SUGGESTED AT LEAST TWICE A WEEK DURING THE GROWING SEASON AND AS NEEDED AFTERWARDS.
WHEN GRASS IS REQUIRED AS A BEST MANAGEMENT PRACTICE ON STEEP SLOPES, NON -GERMINATED SEEDS SHALL BE KEPT MOIST, AND ROOTED
GRASS SHALL HAVE AT LEAST 1 INCH OF WATER PERMONTH DURING THE PERIOD FROM MAY 15 THROUGH SEPTEMBER 15.
FERTILIZER
FERTILIZER SHALL BE A COMMERCIAL MIX WITH A 16-14-8 FORMULA, INCLUDING 50 PERCENT SLOW RELEASE NITROGEN, OR THAT MIXAS
RECOMMENDED BY THE SEED SUPPLIER AND APPROVED FOR USE BY THE LANDSCAPE ARCHITECT.
GRASS MIXES USED SHALL MEEF THE FOLLOWING SPECIFICATIONS: % BY WEIGHT
FESTUCA ARUNDINACEA/TALL FESCUE 33% HYDROSEED
FESTUCA RUBRA/RED FESCUE 33%HYDROSEED
COLLUM PERENNE /PERENNIAL RYEGRASS 33% HYDROSEED
5 BIORETENTION CELL
N. T. S
APPROVED FOR CONSTRUCTION
or:
Dare:
g1+ECig2
OF
PUR1C
YAftKS
APPft0VA1
2
N
w
a
0
0
z
N
m
�
�
N Vl
m F=
m
m
z
°f
o m
� �
�
`�
i� s
i
� v
U
N
d
3
(.�
Z
J
U
}
U
W
�
J
�
L�
O
U
J_
Q
F-
W
Z
Q
W
F
O
Z
W
a
Z
Q
�
'
m��
�
K
�
rox�,�ww
C
a ��
,L
a
�
�_
f .�
■
� d
C
W
a
W
4
�
Z
•�
� rn3
� m�
�
W
a :_
� wnxwam6dwt
'
� Dauenl,�,m
JOB NUMBD2
15025
DRAYANG NAME
18025
C3.3 GDND
C3.3
8
OF 15
I: L•Z•11 �: T 7 l xi 1 G7 : l
INTERNAL SPILLWAY
NUI IU JUALt
6" x 18" DEEP
CONCRETE ANTI -SEEP COLLAR
DESIGN WATER BOTTOM OF
SURFACE BIO -RETENTION POND
ELEV: 329.0
NOTE: PROVIDE QUARRY SPALLS FOR ROCK
PROTECTION WSDOT SPEC 9-13.1. REASONABLY
WELL GRADED, MAX. STONE SRE 12', MEDIAN
STONE 512E 8'. MIN. STONE SIZE 2'
ROCK PROTECTION
INTERNAL SPILLWAY
NUI 7V SCALE
'7F7:�i"971�S1A\'1
1 r-1' ROCK PROTECTION
6' x 18"DEEP
CONCRETE ANTI -SEEP COLLAR
IATER BOTTOM OF
BIO -RETENTION POND
ELEV: 329.5
NOTE: PROVIDE QUARRY SPALLS FOR ROCK
PROTECTION WSDOT SPEC 9-13.1. REASONABLY
WELL GRADED, MAX. STONE SIZE 12', MEDIAN
STONE SIZE 8', MIN. STONE SIZE 2•
._. � � ...
N V I I U JUALt
ROCK PROTECTION
D 5' NRTIVF FJC�cFILL
O� IUV -01L
INFILTRATION TRENCH
NUI I U JI:ALt
9't AT SPILLWAY
\//�//�Q�/j`ii
i\�j\\j\\j\�j\\j\\j\�j��\\y Yr• • • •
DESIGN MAXIMUM
WATER SURFACE
6' x 18"DEEP ELEV: 330.5
CONCRETE ANTI -SEEP COLLAR Ln'J
BOTTOM OF
INFILTRATION POND
ELEV: 327.5
NOTE: PROVIDE QUARRY SPALLS FOR ROCK
PROTECTION WSDOT SPEC 9-13.1. REASONABLY
WELL GRADED, MAX. STONE SIZE 12", MEDIAN
STONE SIZE 8•. MIN. STONE SIZE 2"
(!
SECTION AA
ROCK PROTECTION
JJJJJJ������ EXISTING GRADE
OND 330.4
SEPARATION
GEOTEXTILE
FABRIC
12'
•���� ������tL• � ���
• • • • • U • •
� � � � � � � � � � � 1
� � � � � � � � 1 � � � � � � � �
• • • • • • • •
PLAN 1'ABOVE CROWN
EXISTING AND/OR l.L-p1P
PROPOSED GROUND pUTFA
O Ono np� � 1N(E7-1pE�
RIPRAP 24" MIN.
NON -WOVEN GEOTEXTILE FABRIC RIPRAP NOTE:
MIRAFI 140N OR APPROVED EQUIVALENT MAXIMUM STONE SIZE: 24 INCHES (NOMINAL DIAMETER)
MEDIAN STONE SIZE: 161NCHES
SECTION MINIMUM STONE SIZE:4INCHES
OUTFALL PROTECTION
NUI I U SUALt
2B�'-M—A11X. � �
Fl. I�� . ,
s•
48", 54" OR 60"
s7EPs art 12"
LADDER
rSAND COLLARS
(PVC PIPE ONLY)
R/NC ANO COYER
EL=34298
RISER OR ADJUSTMENT
sEGnoN
FLAT SLAB COSER
x
.-; MORTAR
NOTES:
1. Nandho/ds in riser section or ad�usl—
ment section shall have 3• min. cleor—
once. Steps in catch basin sha8 haw
6" min. clearance. No steps are required
L1=330.80 when E" Is 4' or less.
2 Precast bases shot/ how cutouts or
knockouts with a wall thickness of 2-
".. Nola sizes sho!l be equal to pipe
outer diameter plus catch basin wal!
thickness Connections to cutch basin to
be mode with Bond collar a equiwlent.
Maximum ha/e s/ze is 38" fora 48"
rotch basin, 42• fore 54� cafch bosh,
and 4B" for o 60" catch basin. Minimum
distance between ho/es is 8�
S Al/ base reinfacing steel shelf be
JY rebar on 8• center spocmg, p/aced
in the tap hall of the base, 1" min.
clearance, 2 1/2" max. clearance.
4. The bottom of the precast cutch basin
may be rounded.
5. Frame and grate may be installed with
eange dawn or cast into riser
MORTAR
W MOIE' FlLLET �--rr •-.-• 1"
,1
tV'�2 GROUND FIEF?- RFL` FD I- R -.F I.NOFO R'JN FI^E ME[TI'tG 54.0 e" --
- , - „PECIFIU �UC.N: Cif i �RD-U5.2 (zI �IA�•P.F 60.0-8•� SEPARATE CAST IN PLACE {4 REBAR (TYP)
p p 14lTH TH- At1❑ITIOW��OtD T10HS OR SEPARATE PRECAST
��,-..,r \ 1 \�:\' _im' -V. BASE
y\yj�' .�»!.•��= 1.It1EPEtt{CT-tATIONS SI�AL!BECWCUL:.R :i.\Or. O•R/NG
MI\U2U`.S OF!i`[xAfJELE. � FOR SEPARATE 'T ' Ts
'��'- _ FLTE �^RI': 2. IPLY LI4�LL ISE C!EANLY CUT A\O BE:tAOftTH CAST IN PLACE GRAVEL SACKFlLL FOR PIPE e
.F At:7 UVIFORIeI V.'ITH NO Fx:FS$ CQ`Lf`RFI € I EY
_ UND FRP`l THE HOLE FERFUR..TIONS PROCESS. DEPTH. FOR PRECASTED BA ES �'4���`�TDETAI'
`t _ Vi I ELLV: 3.` �<E SNALL BE A Is'INL°.1UI.: CJ' 7 SETS OF ONLY.
L PERFORATIONS VJITII2 l-PLES FEK SFT Of
PERTORATIGNSFGI1 LJx iuS OF FIPL LLhGIH. TYPE 2 CATCH BASIN #12 -SPILL CONTROL
SUTTOGI E.EV. 1 P'IEEER CASKETS OR CRt71.1K0 OF THEJS:1\T$
,i_, l I%-- r RERFORATFD PIPE RUhS WILI NO7.E
ScL(.UL4EC.
li'y -%: NU\FRACTURED N TEr-I AOFTHE PER. ORATES LOH-fLTE � � %NOT TO SCALE
GRAIN ROCK EdUIV. TO 1'ii'L LIIA__ cE LI-llE BY IHE M::MCIPAO71' \J
t550'Jf SPEC. BD3.12jS1 ifEi 01<_ n1$1ALLATICt7 yr (I1E pY'E IV iS�E
TRENCH SECTION r,Rc+��D.
m
�'
}
to
�
B
�
i.i�s
� C U
W
(7
Q J
za
W
D ❑
as
� W
Z F
D
� Z
;1
o
a �
JOB NUMBER
18025
DRA151NG NAME
18025_C3.4_GDND
C3.4
9 OF 15
.'W
I�
�
;1
o
a �
JOB NUMBER
18025
DRA151NG NAME
18025_C3.4_GDND
C3.4
9 OF 15
TYPE I
CATCH BASIN & RISER
— d4laMWdo
meets ASC476and
3DOT/APYA Standard
spedficaUma
'
IOIOdcOUT)
wsppr slap es.zo.ot
,a. sy.a is m. rnaa tm.
I...v.<roala,e ifi1
48" TYPE 2 CATCH BASIN
— HS -20 rih
se trod 76.0 klp
— NaMda meals ASM C478 and dl WSHOT/APWA Stmdad
SpeNllmUons
ftubbr gasket l meets ASIY meet
— Ptllyropllaan a spa me slo"ars
mink mut ASM 04101
— ReFforcemml ores meets mfiFum ASM C476
Flat Top =0.15 h'rllnaor ft F both dF«!Ions, .// u.20 B20 he O
90' around apenFq
. _ . .. - - 5n9 bore
tab), Q15
t pb rtqukements
wsppr slat R-1D.zaat
FOR DETAILS, BEE REVERS�a
�..s Tae saxvnax
k...naalps 22% 154
.mss: rr•�c.^..r..n:-a-r�+a
....................................
let
`� r ;•;\r�
•YELM
DEPT.• ORKS
■ A
PIPE
■ TRENCH
APPROVED
RESTORATION TABLE 1
SIA4F'ACE 7HICKNE55 BACKFlLL/ COMMENTS/TYPE COMPACTIONMOUNTS. OTHER REOUIREYR]IS
CRUSHED 4• CRUSHED SURFACE SELECT BACKFILLFINISH GRADE SMALL BE
SURFACE TOP CpAtSE COMPACT TO 95S SMOOTH d: CONSISTANi
W1M COSTING3. 10N. /MADE B AC. FW SH ROADWAY TO
AC, PAYEYENT PAVING OYER 4" CRUSHED 50 -ECT BACKFILLON
LL CFpiY TO ALL EooSRN
OVER GRAVEL BASE gIRpA� TOP CWRSE COMPACT TO 9fiS GRADES AND CUR65
SOPEB SHALL MATCH
CONCRETE SURFACEPATCH DUSTING SElEtT BAtl(FlLL NATCN f:IIsiWG FINISH(IX6YEWAY/SIDEWAl1() CONCRETE TF9CIO1E55 COMPACT TO 96S TEXNRE. AND GRAMU
HYDROSEEO/ PNIINGS NATIVE BACKFILL FINISH CRAOE SHALL RE
IAWN/LANDSCAPE OYER 4• YIN. TWE A COMPACT TO BSS SMOOTHk CONSISTANT
TOP 501 YAM FJOSONG GRADE
NATIVE BACYWNO BACKFAL
UNYIPROVID AIFACE N/A KFLL COMPACT TO BSS 2" ABOVE f315]WC
GTAOE a SMOOTCITY ENGINEER DATE
H
CITY
��ll �Is3rastle Precast'
FRAME AND COVER
240 Iba
RANGE DOMtI *up
Delivering Reliability
48" TYPE 2 CATCH BASIN
TYPE 1 CATCH
BASIN RISER
7 -BO roa
4• = 160 Iba
fi" = 240 Iba
12" =480 Iba 2 \ - 10" , 40, 60, 17 0 24•
24. 960 Iba Y
GRADE RING
2 � 60 Iba
4" = 120 Iba
e" - 160 Iba
ot 4• ce fie
1 4 48' FLATTOP
1MM 24"I
4B'FLAT TOP J N
1BM zD" a z4• 10
6
lw ro.
HOLE
1,6D0 roa -�
B•
W50aT SP3 B-70.2001
Dpau6urn.com
tsa.1
o zaa� zo,6 aa�6. P,.mw h�
0
s
K
F
z
m
3 � � N Nl
rc F
m Z
y m
Z ZZ0
CYY111 3 � fi
O D U O IU]1
Q
3
C7
Z
J
U
U
W �
J
d
� lL
O
U
W
C7 (q
Q J
za
W
00
O �
Z Z
Q Q
Z_ LLl
O ~
� Z
C7
0.'
�4
rONALEN�a,�
W
G a
W 4 �
Z m
•� U' a 3
� m �
� O o E5
� K.�„ah.ra 6etmu
' Ca1lBtl
omyoudIg
JOB NUMBER
18025
DRANING NAME
18025_C3.5_G0N0
C3.5
1D OF 15
6• = 240 roa
1z" = 4ao roa
24" w 960 roa (./ 18
Basin Map
BMP Calculations
Overflow Calculations
Conveyance Calculations
I I
SCALE: 1"=50 FEET
I 0 25 50 100
�I
I I
`I
BASIN #2
,
BASIN #1 = 0.336 AC
IMPERVIOUS = 0.210
PERVIOUS = 0.123
BASIN #3 = 5.531 AC
IMPERVIOUS = 5.509
PERVIOUS = 0.022
/ BASIN #4 = 0.589 AC
IMPERVIOUS = 0.184
PERVIOUS = 0.404
NOTE: ALL MAX PONDING SURFACES ARE INCLUDED IN THE IMPERVIOUS AREAS
0
5
0
0
W
o
m m
om m�
Q
3
z
J
U
}
U
W �
� J
a
z �
0
U
a
a
z
a
m
32107 �4�
roraw sN
= a
W �
z P
. W
m�
o d2-3
� Ifmw MvlY b.ID'M
� Call9fl haPortyaum
JOB NUMBER
18025
DRAKiNG NAlAE
BASIN MAP
BASIN
MUS FLOOD
PROJECT REPORT
Program Version: MGSFIood 4.46
Program License Number: 201610012
Project Simulation Performed on: 09/13/2018 2:15 PM
Report Generation Date: 09/13/2018 2:15 PM
Input File Name: BASIN #1
Project Name: NPR RECYCLING
Analysis Title: BIORETENTION AND INFILTRATION TRENCH
Comments:
Computational Time Step (Minutes)
PRECIPITATION INPUT
15
Extended Precipitation Time Series Selected
Climatic Region Number: 16
Full Period of Record Available used for Routing
Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station 961044 Puget East 44 in MAP
Evaporation Scale Factor 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.336 0.333
Area of Links that Include Precip/Evap (acres) 0.000 0.003
Total (acres) 0.336 0.336
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin :Subbasin 1
Outwash Forest 0.336
Subbasin Total 0.336
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1
-------Area (Acres)
Outwash Pasture 0.123
Impervious 0.210
Subbasin Total 0.333
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
Link Name: New Bio Lnk1
Link Type: Bioretention Facility
Downstream Link Name: New Infilt Trench Lnk2
Base Elevation (ft) 100.00
Riser Crest Elevation (ft)
Storage Depth (ft) 1.00
Bottom Length (ft) 39.0
Bottom Width (ft) 3.0
Side Slopes (ft/ft) : L1= 3.00
Bottom Area (sq -ft) 117.
Area at Riser Crest EI (sq -ft) 405.
(acres) 0.009
Volume at Riser Crest (cu -ft) 325.
(ac -ft) 0.007
Infiltration on Bottom only Selected
Soil Properties
101.00
L2= 3.00 W1= 3.00 W2= 3.00
Biosoil Thickness (ft) 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) 3.00
Biosoil Porosity (Percent) 40.00
Maximum Elevation of Bioretention Soil : 102.00
Native Soil Hydraulic Conductivity (in/hr) 20.00
Riser Geometry
Riser Structure Type :Circular
Riser Diameter (in)
Common Length (ft) :0.000
Riser Crest Elevation : 101.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
------------------------------------------
Link Name: New Infilt Trench Lnk2
Link Type: Infiltration Trench
Downstream Link: None
Trench Type
Trench Length (ft)
Trench Width (ft)
Trench Depth (ft)
Trench Bottom Elev (ft)
Trench Rockfill Porosity (%)
Constant Infiltration Option Used
Infiltration Rate (in/hr): 20.00
Trench on Embankment Sideslope
28.00
4.00
3.00
90.00
40.00
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 2
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 8.153E-02
5 -Year 0.107
10 -Year 0.127
25 -Year 0.150
50 -Year 0.181
100 -Year 0.222
200 -Year 0.232
Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year
8.153E-02
5 -Year
0.107
10 -Year
0.127
25 -Year
0.150
50 -Year 0.181
100 -Year 0.222
200 -Year 0.232
Link Outflow 1 Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year
6.264E-02
5 -Year
8.591 E-02
10 -Year
0.102
-Year
25 -Year
0.116
50 -Year
0.141
101.031
100 -Year
0.160
2.00
200 -Year
0.188
Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
101.024
1.11
-Year
101.027
1.25
-Year
101.031
2.00
-Year
101.042
3.33
-Year
101.048
5 -Year
101.053
10 -Year
101.059
25 -Year
101.065
50 -Year
101.074
100
-Year
101.080
********** Link: New Infilt Trench Lnk2 ********** Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 6.264E-02
5 -Year 8.591 E-02
10 -Year 0.102
25 -Year 0.116
50 -Year 0.141
100 -Year 0.160
200 -Year 0.188
Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac -ft)
a0 "M Subbasin 1 105.069
Total: 105.069
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1 47.629
Link: New Bio Lnk1 98.486
Link: New Infilt Trench Ln 9.043
Total:
155.158
Total Predevelopment Recharge is Less than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.665 ac-ft/year, Post Developed: 0.982 ac-ft/year
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
-------SCENARIO: POSTDEVELOPED
Number of Links: 2
**********
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 105.48
Inflow Volume Including PPT-Evap (ac -ft): 107.66
Total Runoff Infiltrated (ac -ft): 98.49, 91.48%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 9.04
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.48% > 91%TREATED
********** Link: New Infilt Trench Lnk2 **********
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 9.04
Inflow Volume Including PP-Evap (ac -ft): 9.04
Total Runoff Infiltrated (ac -ft): 9.04, 100.00%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 0.00
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 100.00% 100% INFILTRATED
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: New Infilt Trench Lnk2
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
2 -Year
2.606E-04
PASS
0.0%
2 -Year
0.000
5 -Year
2.687E-04
5 -Year
0.000
10 -Year
2.707E-04
10 -Year
0.000
25 -Year
1.017E-03
25 -Year
0.000
50 -Year
1.272E-03
50 -Year
0.000
100 -Year
1.843E-03
100 -Year
0.000
200 -Year
2.769E-03
200 -Year
0.000
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%):
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%)
Maximum Excursion from Q2 to Q50 (Must be less than 10%):
Percent Excursion from Q2 to Q50 (Must be less than 50%):
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%):
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%)
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
0.0%
PASS
0.0%
PASS
PASS
PASS
PASS
PASS
MUS FLOOD
PROJECT REPORT
Program Version: MGSFIood 4.46
Program License Number: 201610012
Project Simulation Performed on: 09/10/2018 8:05 AM
Report Generation Date: 09/10/2018 8:06 AM
Input File Name: BASIN #2
Project Name: NPR RECYCLING
Analysis Title: BIORETENTION AND INFILTRATION CELL
Comments:
PRECIPITATION INPUT
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 16
Full Period of Record Available used for Routing
Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station 961044 Puget East 44 in MAP
Evaporation Scale Factor 0.750
HSPF Parameter Region Number: 1
or- F- Parameter Region Name USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 6.766 6.670
Area of Links that Include Precip/Evap (acres) 0.000 0.096
Total (acres) 6.766 6.766
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
----------Subbasin :Subbasin 1
Outwash Forest 6.766
Subbasin Total 6.766
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1
-------Area (Acres)
Outwash Grass 0.185
Impervious 6.485
Subbasin Total 6.670
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
Link Name: Bioretention Cell
Link Type: Bioretention Facility
Downstream Link Name: Infiltration Cell
Base Elevation (ft) 100.00
Riser Crest Elevation (ft)
Storage Depth (ft) 1.00
Bottom Length (ft) 520.0
Bottom Width (ft) 8.0
Side Slopes (ft/ft) : L1= 3.00
Bottom Area (sq -ft) 4160.
Area at Riser Crest EI (sq -ft) 71364.
(acres) 0.169
Volume at Riser Crest (cu -ft) 8,252.
(ac -ft) 0.189
Infiltration on Bottom only Selected
Soil Properties
101.00
L2= 3.00 W 1= 3.00 W2= 3.00
Biosoil Thickness (ft) 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) 3.00
Biosoil Porosity (Percent) 40.00
Maximum Elevation of Bioretention Soil : 102.00
Native Soil Hydraulic Conductivity (in/hr) 20.00
Riser Geometry
Riser Structure Type :Circular
Riser Diameter (in) :24.00
Common Length (ft) :0.000
Riser Crest Elevation : 101.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
--------------------------------------
Link Name: Infiltration Cell
Link Type: Structure
Downstream Link: None
Prismatic Pond Option Used
Pond Floor Elevation (ft) 96.00
Riser Crest Elevation (ft)
99.00
Max Pond Elevation (ft) 99.50
Storage Depth (ft) 3.00
Pond Bottom Length (ft) 70.0
Pond Bottom Width (ft) 35.0
Pond Side Slopes (ft/ft) : L1= 3.00 L2
Bottom Area (sq -ft) 2450.
Area at Riser Crest EI (sq -ft) 41664.
(acres) 0.107
Volume at Riser Crest (cu -ft) 10,509.
(ac -ft) 0.241
Area at Max Elevation (sq -ft) 5096.
(acres) 0.117
Vol at Max Elevation (cu -ft) 121948.
(ac -ft) 0.297
Constant Infiltration Option Used
Infiltration Rate (in/hr): 20.00
Riser Geometry
Riser Structure Type :Circular
Riser Diameter (in) :24.00
Common Length (ft) : 0.000
Riser Crest Elevation : 99.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
= 2,450 SF --> DESIGN = 532 x 4.6 = 2,447 SF
= 3.00 W1= 3.00 W2= 3.00
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 2
********** Subbasin: Subbasin 1 **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
----------------------
----------------------
2-Year
2.518
5 -Year
3.294
10 -Year
3.831
25 -Year
4.619
50 -Year
5.595
100 -Year
6.854
200 -Year
7.169
Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 2.518
5 -Year 3.294
10 -Year 3.831
25 -Year 4.619
50 -Year 5.595
100 -Year 6.854
200 -Year 7.169
USED FOR OVERFLOW SIZING
Link Outflow 1 Frequency Stats
Flood Frequency Data cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 1.834
5 -Year 2.476
10 -Year 2.912
25 -Year 3.316
50 -Year 4.259
100 -Year 4.680
200 -Year 5.501
Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
101.116
1.11
-Year
101.130
1.25
-Year
101.146
2.00
-Year
101.195
3.33
-Year
101.224
5 -Year
101.239
10 -Year
101.268
25 -Year
101.293
50 -Year
101.350
100 -Year 101.374
********** Link: Infiltration Cell **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 1.834
5 -Year 2.476
10 -Year 2.912
25 -Year 3.316
50 -Year 4.259
100 -Year 4.680
200 -Year 5.501
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
96.011
1.11
-Year
96.013
1.25
-Year
96.019
2.00
-Year
96.494
3.33
-Year
96.832
5 -Year
97.060
10 -Year
97.431
25 -Year
98.198
50 -Year
98.526
100
-Year
98.746
Link Inflow Frequency Stats
Link WSEL Stats
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1
Total:
2115.767
2115.767
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1 70.555
Link: Bioretention Cell 3018.677
Link: Infiltration Cell 291.379
Total: 3380.611
Total Predevelopment Recharge is Less than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 13.391 ac-ft/year, Post Developed: 21.396 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
********** Link: Bioretention Cell
**********
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 3255.55
Inflow Volume Including PPT-Evap (ac -ft): 3310.78
Total Runoff Infiltrated (ac -ft): 3018.68, 91.18%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 291.38
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.18%
********** Link: Infiltration Cell
rsrssszxsrs
Basic Wet Pond Volume (91 % Exceedance): 32402. cu -ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 48604. cu -ft
Time to Infiltrate 91 0/o Treatment
Volume, (Hours): 3.87
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 291.38
Inflow Volume Including PPT-Evap (ac -ft): 291.38
Total Runoff Infiltrated (ac -ft): 291.38, 100.00%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 0.01
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 100.00%
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: Infiltration Cell
100
°/a INFILTRATED
*** Point of Compliance NOW Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
2 -Year
5.247E-03
5%
PASS
2 -Year
0.000
0.0%
5 -Year
5.412E-03
5 -Year
0.000
10 -Year
5.451
E-03
10 -Year
0.000
25 -Year
2.048E-02
25 -Year
0.000
50 -Year
2.562E-02
50 -Year
0.000
100 -Year
3.712E-02
100 -Year
0.000
200 -Year
5.575E-02
200 -Year
0.277
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%):
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%):
Maximum Excursion from Q2 to Q50 (Must be less than 10%):
Percent Excursion from Q2 to Q50 (Must be less than 50%):
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%)
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-100.0%
-99.9%
-99.9%
PASS
5%
PASS
2%
PASS
0.0%
PASS
PASS
PASS
MUS FLOOD
PROJECT REPORT
Program Version: MGSFIood 4.46
Program License Number: 201610012
Project Simulation Performed on: 09/10/2018 3:06 PM
Report Generation Date: 09/10/2018 3:06 PM
Input File Name:
Project Name:
Analysis Title:
Comments:
BASIN #3
NPR RECYCLING
BIORETENTION AND INFILTRATION CELL
Computational Time Step (Minutes):
PRECIPITATION INPUT
15
Extended Precipitation Time Series Selected
Climatic Region Number: 16
Full Period of Record Available used for Routing
Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station 961044 Puget East 44 in MAP
Evaporation Scale Factor 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 5.530 5.450
Area of Links that Include Precip/Evap (acres) 0.000 0.080
Total (acres) 5.530 5.530
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin :Subbasin 1
Outwash Forest 5.530
Subbasin Total 5.530
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1
-------Area (Acres)
Outwash Pasture 0.022
Impervious 5.428
Subbasin Total 5.450
ENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
Link Name: Bioretention Cell
Link Type: Bioretention Facility
Downstream Link Name: Infiltration Cell
Base Elevation (ft) 100.00
Riser Crest Elevation (ft)
Storage Depth (ft) 1.00
Bottom Length (ft) 435.0
Bottom Width (ft) 8.0
Side Slopes (ft/ft) : L1= 3.00
Bottom Area (sq -ft) 3480.
Area at Riser Crest EI (sq -ft) 6,174.
(acres) 0.142
Volume at Riser Crest (cu -ft) 61909.
(ac -ft) 0.159
Infiltration on Bottom only Selected
101.00
= 3,480 SF --> DESIGN = 543 x 6.5 = 3,530 SF
?=3.00 W1=3.00 W2=3.00
Soil Properties
Biosoil Thickness (ft) 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) 3.00
Biosoil Porosity (Percent) 40.00
Maximum Elevation of Bioretention Soil : 102.00
Native Soil Hydraulic Conductivity (in/hr) 20.00
Riser Geometry
Riser Structure Type :Circular
Riser Diameter (in) : 24.00
Common Length (ft) : 0.000
Riser Crest Elevation : 101.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
Link Name: Infiltration Cell
Link Type: Structure
Downstream Link: None
Prismatic Pond Option Used
Pond Floor Elevation (ft) 96.00
Riser Crest Elevation (ft)
99.00
Max Pond Elevation (ft) 99.50
Storage Depth (ft) 3.00
Pond Bottom Length (ft) 55.0
Pond Bottom Width (ft) 35.0
Pond Side Slopes (ft/ft) : L1= 3.00
Bottom Area (sq -ft) 1925.
Area at Riser Crest EI (sq -ft) 3,869.
(acres) 0.089
Volume at Riser Crest (cu -ft) 8,529.
(ac -ft) 0.196
Area at Max Elevation (sq -ft) 4256.
(acres) 0.098
Vol at Max Elevation (cu -ft) 101559.
(ac -ft) 0.242
Constant Infiltration Option Used
Infiltration Rate (in /hr): 20.00
Gt
Riser eomery
Riser Structure Type :Circular
Riser Diameter (in) : 24.00
Common Length (ft) : 0.000
Riser Crest Elevation : 99.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
= 1,925 SF --> DESIGN = 500 x 3.9 = 1,950 SF
L2= 3.00 W1= 3.00 W2= 3.00
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 2
********"* Subbasin: Subbasin 1 **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
------------------------
------------------------
2-Year
2.107
5 -Year
2.757
10 -Year
10 -Year
3.207
3.863
25 -Year
3.863
100 -Year
50 -Year
4.683
6.001
100 -Year
5.737
3.724
200 -Year
6.001
4.385
Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year
2.107
5 -Year
2.757
10 -Year
3.207
25 -Year
3.863
50 -Year
4.683
100 -Year
5.737
200 -Year
6.001
USED FOR OVERFLOW DESIGN
Link Outflow 1 Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year
1.549
101.104
5 -Year
2.041
1.11
10 -Year
2.424
25 -Year
2.713
-Year
50 -Year
3.499
100 -Year
3.724
101.174
200 -Year
4.385
3.33
Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
101.104
1.11
-Year
101.118
1.25
-Year
101.131
2.00
-Year
101.174
3.33
-Year
101.198
5 -Year
101.211
10 -Year
101.236
25 -Year
101.255
50 -Year
101.304
100 -Year 101.318
Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 1.549
5 -Year 2.041
10 -Year 2.424
25 -Year 2.713
50 -Year 3.499
100 -Year 3.724
200 -Year 4.385
Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
96.012
1.11
-Year
96.014
1.25
-Year
96.056
2.00
-Year
96.602
3.33
-Year
96.942
5 -Year
97.180
10 -Year
97.574
25 -Year
98.303
50 -Year
98.643
100
-Year
98.818
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1 1729.263
Total: 1729.263
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1 8.519
Link: Bioretention Cell 2525.698
Link: Infiltration Cell 244.271
Total: 2778.488
Total Predevelopment Recharge is Less than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 10.945 ac-ft/year, Post Developed: 17.585 ac-ft/year
***********Water Quality Facy
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
********** Link: Bioretention Cell
**********
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 2724.75
Inflow Volume Including PPT-Evap (ac -ft): 2770.95
Total Runoff Infiltrated (ac -ft): 2525.70, 91.15%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 244.27
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.15%
********** Link: Infiltration Cell
> 91 %TREATED
**********
Basic Wet Pond Volume (91% Exceedance): 27134. cu -ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 40701. cu -ft
Time to Infiltrate 91 %Treatment Volume, (Hours): 3.87
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 244.27
Inflow Volume Including PPT-Evap (ac -ft): 244.27
Total Runoff Infiltrated (ac -ft): 244.27, 100.00%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 0.01
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 100.00%
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: Infiltration Cell
100%
INFILTRATED
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
2 -Year
4.289E-03
5%
2 -Year
0.000
PASS
5 -Year
4.423E-03
5 -Year
0.000
10 -Year
4.455E-03
10 -Year
0.000
25 -Year
1.674E-02
25 -Year
0.000
50 -Year
2.094E-02
50 -Year
0.000
100 -Year
3.034E-02
100 -Year
0.000
200 -Year
4.557E-02
200 -Year
0.235
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%):
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%)
Maximum Excursion from Q2 to Q50 (Must be less than 10%):
Percent Excursion from Q2 to Q50 (Must be less than 50%):
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%):
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%):
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-100.0%
-99.9%
-99.9%
PASS
5%
PASS
2%
PASS
0.0%
PASS
PASS
PASS
MUS FLOOD
PROJECT REPORT
Program Version: MGSFIood 4.46
Program License Number: 201610012
Project Simulation Performed on: 09/13/2018 2:25 PM
Report Generation Date: 09/13/2018 2:25 PM
Input File Name: BASIN #4
Project Name: NPR RECYCLING
Analysis Title. BIORETENTION AND INFILTRATION TRENCH
Comments:
PRECIPITATION INPUT
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 16
Full Period of Record Available used for Routing
Precipitation Station: 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station 961044 Puget East 44 in MAP
Evaporation Scale Factor 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.589 0.586
Area of Links that Include Precip/Evap (acres) 0.000 0.002
Total (acres) 0.589 0.588
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
----------Subbasin :Subbasin 1
Outwash Forest 0.589
Subbasin Total 0.589
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1
-------Area (Acres)
Outwash Pasture 0.401
Impervious 0.185
Subbasin Total 0.586
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
Link Name: New Bio Lnk1
Link Type: Bioretention Facility
Downstream Link Name: New Infilt Trench Lnk2
Base Elevation (ft) 100.00
Riser Crest Elevation (ft)
Storage Depth (ft) 1.00
Bottom Length (ft) 27.0
Bottom Width (ft) 4.0
Side Slopes (ft/ft) : L1= 3.00
Bottom Area (sq -ft) 108.
Area at Riser Crest EI (sq -ft) 330.
(acres) 0.008
Volume at Riser Crest (cu -ft) 278.
(ac -ft) 0.006
Infiltration on Bottom only Selected
Soil Properties
101.00
L2= 3.00 W1= 3.00 W2= 3.00
Biosoil Thickness (ft) 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) 3.00
Biosoil Porosity (Percent) 40.00
Maximum Elevation of Bioretention Soil : 102.00
Native Soil Hydraulic Conductivity (in/hr) 20.00
Riser Geometry
Riser Structure Type :Circular
Riser Diameter (in)
Common Length (ft) : 0.000
Riser Crest Elevation : 101.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
Link Name: New Infilt Trench Lnk2
Link Type: Infiltration Trench
Downstream Link: None
Trench Type
Trench Length (ft)
Trench Width (ft)
Trench Depth (ft)
Trench Bottom Elev (ft)
Trench Rockfill Porosity (%)
Constant Infiltration Option Used
Infiltration Rate (in/hr): 20.00
Trench on Embankment Sideslope
26.00
4.00
3.00
90.00
40.00
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 2
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 7.211 E-02
5 -Year 9.449E-02
10 -Year 0.112
25 -Year 0.139
50 -Year 0.160
100 -Year 0.196
200 -Year 0.205
Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 7.211 E-02
5 -Year 9.449E-02
10 -Year 0.112
25 -Year 0.139
50 -Year U. IOU
100 -Year 0.196
200 -Year 0.205
********** Link:
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 5.568E-02
5 -Year 7.580E-02
10 -Year 9.163E-02
25 -Year 0.101
50 -Year 0.137
100 -Year 0.145
200 -Year 0.177
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
--------------------------------------
--------------------------------------
1.05-Year
101.023
k ear
101.025
1.25
II
-Year
101.029
2.00
-Year
101.039
3.33
-Year
101.044
5 -Year
101.048
10 -Year
101.055
25 -Year
101.059
50 -Year
101.072
100
-Year
101.075
Link Outflow 1 Frequency Stats
Link WSEL Stats
********** Link: New Infilt Trench Lnk2 ********** Link Inflow Frequency Stats
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
--------------------------------------
--------------------------------------
2-Year 5.568E-02
5 -Year 7.580E-02
10 -Year 9.163E-02
25 -Year 0.101
50 -Year 0.137
100 -Year 0.145
200 -Year 0.177
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasln: Subbasin 1 184.184
Total: 184.184
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac -ft)
Subbasin: Subbasin 1 155.278
Link: New Bio Lnk1 86.975
Link: New Infilt Trench Ln 7.854
Total:
250.106
Total Predevelopment Recharge is Less than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.166 ac-ft/year, Post Developed: 1.583 ac-ft/year
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 2
**********
Infiltration/Filtration Q+n+ic+i s
Volume (ac -ft): 93.07
Inflow Volume Including PPT-Evap (ac -ft): 94.92
Total Runoff Infiltrated (ac -ft): 86.98, 91.63%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 7.85
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.63% ' 91% TREATED
********** Link: New Infilt Trench Lnk2 **********
Infiltration/Filtration Statistics --------------------
Inflow Volume (ac -ft): 7.85
Inflow Volume Including PPT-Evap (ac -ft): 7.85
Total Runoff Infiltrated (ac -ft): 7.85, 100.00%
Total Runoff Filtered (ac -ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac -ft): 0.00
Secondary Outflow To Downstream System (ac -ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 100.00% 100% INFILTRATED
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: New Infilt Trench Lnk2
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
2 -Year
4.568E-04
2 -Year
0.000
5 -Year
4.711
E-04
5 -Year
0.000
10 -Year
4.745E-04
10 -Year
0.000
25 -Year
1.783E-03
25 -Year
0.000
50 -Year
2.230E-03
50 -Year
0.000
100 -Year
3.231
E-03
100 -Year
0.000
200 -Year
4.854E-03
200 -Year
0.000
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 509/oQ2 (Must be Less Than or Equal to 0%):
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%)
Maximum Excursion from Q2 to Q50 (Must be less than 10%):
Percent Excursion from Q2 to Q50 (Must be less than 50%):
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%):
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%)
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
0.0% PASS
PASS
PASS
PASS
PASS
PASS
SPILLWAY AND EMERGENCY OVERFLOW DESIGN
EMERGENCY SPILLWAY SIZING
BASIN Q,00 H
#2 6.854 0.22
#3 5.737 0.20
Q,00 = 100 -YEAR STORM (CFS)
H = OVERFLOW HEIGHT (FT)
L = LENGTH OF SPILLWAY (FT)
MIN. L
20.16 --> DESIGN = 21'
19.50 --> DESIGN = 21'
emergency overflow .L`s zmn. overflow
water surface •. water
o v Ind" 3 surface
6 1 oa H
rpeOvOutlet
Protectiou" in Vol. II
Figure 3.2.5 - Weir Section for Emergency Overflow Spillway
CONVEYANCE CALCULATIONS
BASIN #1
An 8" Diam. HDPE pipe @ 5.0770 is the only pipe in this basin.
Per MGS Flood, the max 100 year flow = 0.16 cfs
Circular
Diameter (ft) = 0.67
Invert Elev (ft) = 336.50
Slope (%) = 5.07
N -Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 0.16
BASIN #2
A 12" Diam. HDPE pipe @ 0.5% is the limiting pipe in this basin.
Per MGS Flood, the max 100 year flow = 6.854 cfs
The area of this basin that is directed through this pipe = 16.3%
Therefore, the flow used to size this pipe = 1.12 cfs
Circular
Diameter (ft)
Invert Elev (ft)
Slope (%)
N -Value
Calculations
Compute by:
Known Q (cfs)
= 333.92
= 0.50
= 0.012
Known Q
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
= 0.11
= 0.160
= 0.04
= 4.22
= 0.56
= 0.19
= 0.50
= 0.39
= 1.120
= 0.34
= 3.25
1.47
= 0.45
= 1.00
= 0.61
CONVEYANCE CALCULATIONS
A 3:1 side slope V -ditch @ 2910 is the limiting ditch in this basin.
Per MGS Flood, the max 100 year flow = 6.854 cfs
Triangular
Side Slopes (z:1)
Total Depth (ft)
Invert Elev (ft)
Slope (%)
N -Value
Calculations
Compute by:
Known Q (cfs)
BASIN #3
= 3. 00, 3.00
1.40
= 333.82
= 2.00
= 0.027
Known Q
= 6.85
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
A 12" Diam. HDPE pipe @ 1.01 % is the limiting pipe in this basin.
Per MGS Flood, the max 100 year flow = 5.737 cfs
The area of this basin that is directed through this pipe = 22.6%
Therefore, flow used to size this pipe = 1.30 cfs
Circular
Diameter (ft)
Invert Elev (ft)
Slope (%)
N -Value
Calculations
Compute by:
Known Q (cfs)
Known Q
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
0.77
6.854
1.78
3.85
4.87
0.80
4.62
1.00
CONVEYANCE CALCULATIONS
BAS 1 N #4
An 8" Diam. HDPE pipe @ 5.62% is proposed to convey the deferred frontage improvements to
the Bioretention cell.
Per MGS Flood, the max 100 year flow = 0.15 cfs
Circular
Diameter (ft)
Invert Elev (ft)
Slope (%)-
NValue
Calculations
Compute by:
Known Q (cfs)
= 335.31
= 5.62
= 0.012
Known Q
= 0.15
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
= 0.150
= 0.03
= 4.53
= 0.53
= 0.18
= 0.48
= 0.42
SOILS REPORT: Parnell Engineering, LLC
Soils Report For Stormwa ter Drainage Design Purposes
Site Address: 1000-1100 ±block of Northern Pacific Road NW, Yelm WA
TPN: 64300900200
Prepared For: NPR Holdings LLC
3655 E. Marginal Way S.
Seattle, WA 98134
206-313-0256
Contact: Ubaida A. Mufrej
Prepared By: Parnell Engineering, LLC
10623 Hunters Lane S.E.
Olympia, WA 98513
(3 60) 491-3243
Contact: William Parnell, P.E.
PARNELL ENGINEERING, LLC
SOIL EVALUATION REPORT
FORM 1: GENERAL SITE INFORMATION
PROJECT TITLE: NPR Holdings LLC SHEET: 1 OF 1
PE PROJECT NO.:18103 DATE: 5/25/18
PREPARED BY: William Parnell, P.E.
1.SITE ADDRESS: 1000-1100 + block of Northern Pacific Road NW., Yelm, WA TPN: 64300900200
2. PROJECT DESCRIPTION: Vehicle storage yard with office buildings.
3. SITE DESCRIPTION: The 13.93 acre irregular shaped parcel is currently unoccupied. Site topography is
nearly level to gently sloping. Elevations range from a high of 338 ft. at the southcentral portion of the site to
a low of 328 ft. at the NE corner of the site. Site vegetation consists of sparsely located conifer trees with a
dominate scotts bloom understory and some indigenous brush and field grass ground cover. The project site
is bounded by rural residential property to the north, undeveloped property to the east, Northern Pacific Road
NW to the south and a private driveway to the west. The on-site soils are mapped by the NRCS as a
somewhat excessively drained Spanaway series soil formed in glacial outwash.
4. SUMMARY OF SOILS WORK PERFORMED: Seventeen test pits were excavated by trackhoe to a
maximum depth of 162" below the existing grade. Soils were inspected by entering and visually logging each
test pit to a depth of four feet. Soils beyond four feet were inspected by examining backhoe tailings. Nine
grain size analysis tests were completed on samples taken from test pit #1 at 60", #2 at 60", #5 at 72", #6 at
72", #7 at 36", #13 at 72", #15 at 84", #16 at 60"and #17 at 66" below the existing grade. Test pit soil log data
sheets, grain size analysis test results and Ksat design infiltration rate calculations are included in this report.
5. ADDITIONAL SOILS WORK RECOMMENDED: Additional soils work should not be necessary unless
drainage infiltration facilities are located outside the general area encompassed by the soil test pits.
6. FINDINGS: The Natural Resource Conservation Service soil survey for Thurston County mapped the on-
site soils as a Spanaway gravelly sandy loam (110,111). All test pits confirmed the Spanaway series
designation generally profiling gravelly sandy loam stratum soils underlain by extremely gravelly coarse sand
substratum soils. Winter water table was present in all test pits except #11, #12 and #15 which were located
at the highest point on the property. Grain size analysis tests and Ksat design infiltration rate calculations
resulted in calculated infiltration rates of 208 in/hr for sample #1 taken at 60" below the existing grade in test
pit #1, 345 in/hr for sample #2 taken at 60" below the existing grade in test pit #2, 128 in/hr for sample #3
taken at 72" below the existing grade in test pit #5, 99 in/hr for sample #4 taken at 72" below the existing
grade in test pit #61 114 in/hr for sample #5 taken at 36" below the existing grade in test pit #71 780 in/hr for
sample #6 taken at 72" below the existing grade in test pit #13, 555 in/hr for sample #7 taken at 84" below the
existing grade in test pit #151 1253 in/hr for sample #8 taken at 60" below the existing grade in test pit #16
and 410 in/hr for sample #9 taken at 66" below the existing grade in test pit #17.
7. RECOMMENDATIONS: The Spanaway soil series is a somewhat excessively drained soil that formed
on terraces in glacial outwash. Infiltration rates are generally rapid in the substratum gravelly soils. It is
recommended that a design infiltration rate < 20 in/hr be used for all proposed stormwater infiltration facilities
that are located in the C1 and C2 horizon soils as indicated in the attached soil log data sheets. Winter water
table was identified and should be considered in the design of all infiltration facilities.
Drainage facility infiltration surfaces must be properly protected from contamination by the fine-grained upper
horizon soils and from compaction by construction site activities. Soils not properly protected will cause
drains a infiltration facilities to prematurely fail.
I hereby certify that I prepared this report, and conducted or supervised the performance of related work. T
certify that I am qualified to do this work. I t my work to be complete an accurate within the bounds
of uncertainty inherent to the.pr%;�Wew
e of s ils science and to be suitable for its intended use.
SIGNED: l
DATE:
Horz
A
C1
C2
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 1 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #1
10YR4/6
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
10YR5/2
loam(110)
4. DEPOSITION HISTORY:
5, HYDROLOGIC SOIL
6, DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
103"
7, CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 103
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13, FINDINGS & RECOMMENDATIONS: Grain size analysis and
Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 208 in/hr for
sample #1 taken at 60" below the
existing grade. It is recommended that a design infiltration rate < 20
in/hr be used for proposed
stormwater infiltration facilities located in the C1 horizon soils. Winter
water table was present at 103"
below the existing rade.
Soils Strata Description
Soil Log #1
%CL %ORG CF STR
MOT
<25 <10 <25 1SBK
<1 - <85 SG
IND CEM ROO <X> FSP
_ - 2-6 2
>20 >20
0"- 24"
10YR2/1
GrLm
24" 86"
10YR4/6
ExGr/CobCSa
some stones
and boulders
86"- 132"
10YR5/2
ExGrCSa
Soils Strata Description
Soil Log #1
%CL %ORG CF STR
MOT
<25 <10 <25 1SBK
<1 - <85 SG
IND CEM ROO <X> FSP
_ - 2-6 2
>20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
PROJECT NO.: 18103
PREPARED BY: William Parnell, PE
SHEET: 2 OF 17
DATE: 2/7/2018
REVISED 5/2512018
SOIL LOG: #2
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
Grain Size Analysis Test
2. SCS SOILS SERIES:
Spanaway gravelly sandy
3. LAND FORM:
Terrace
loam(110)
4. DEPOSITION HISTORY:
Glacial Outwash
5, HYDROLOGIC SOIL
GROUP: A
6. DEPTH OF SEASONAL HW:
108"
7. CURRENT WATER
DEPTH: 108
8. DEPTH TO
IMPERVIOUS/RESTRICTIVE
HORIZONS:
9. MISCELLANEOUS:
Nearly level
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 345 in/hr for sample #2 taken at 60" below the
existing grade. It is recommended that a design infiltration rate < 20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon soils. Winter water table was present at
108" below the existing rade.
Horz Depth Color Texture
A 0% 18" 10YR2/1 VGr/CobLm
C1 18"- 40" 10YR4/6 ExGr/CobCSa
some stones
C2 40" 142" 10YR5/2 ExGr/CobCSa
some stones
Soils Strata Description
Soil Log #2
%CL %ORG CF STR MOT
<25 <10 <40 1SBK
<1 - <80 SG
IND CEM ROO <X> FSP
ff 2-6 2
ff >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings
LLC
SHEET: 3 OF 17
PROJECT NO.: 18103
Bw
DATE: 2/7/2018
PREPARED BY: William Parnell,
PE
REVISED 5/25/2018
MSa some
stones
SOIL LOG: #3
LOCATION: See test pit location
map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam (110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
125"
7, CURRENT WATER
8, DEPTH TO
9. MISCELLANEOUS:
DEPTH: 125
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11, SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration
facilities located in the C1
horizon soils. Winter water table was
resent at 125" below the existing
rade.
Horz
Depth
A
0" 24"
Bw
24"- 42"
C1
42"- 148"
Color
Texture
10YR2/1
VGrLm
10YR3/3
GrSaLm
10YR5/6
ExGr/CobC-
MSa some
stones
Soils Strata Description
Soil Log #3
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<25 <10 <40 1 SBK - ff 2-6 2
<20 <6 <25 1SBK - - ff 2-6 4
<1 - <75 SG - >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 4 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
10YR2/1
VGr/CobLm
SOIL LOG: #4
21% 30"
LOCATION: See test pit location map
ExGrC-MSa
1. TYPES OF TEST DONE:
20 SCS SOILS SERIES:
3, LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6, DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
132"
7, CURRENT WATER
8. DEPTH TO
9, MISCELLANEOUS:
DEPTH: 132
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C1
and C2 horizon soils. Winter water
table was present at 132" below the existing rade.
Horz
Depth
Color
Texture
A
0% 21"
10YR2/1
VGr/CobLm
C1
21% 30"
10YR4/6
ExGrC-MSa
C2
30"- 150"
10YR512
ExGr/CobCSa
some stones
and boulders
Soils Strata Description
Soil Log #4
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<25 <10 <45 1SI3K - ff 2-6 2
<2 <75 SG >20 >20
<1 <80 SG - - >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 5 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #5
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6, DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
120"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 120
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and
Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 128 in/hr for
sample #3 taken at 72" below the
existing grade. It is recommended that a design infiltration rate < 20
in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon soils. Winter water table was present at
120" below the existing rade.
Soils Strata Description
Soil Log #5
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"- 24" 10YR2/1 VGr/CobLm <25 <10 <55 1SBK ff 2-6 2
C1 24"- 52" 10YR4/6 ExGr/CobCSa <1 - <85 SG - >20 >20
some stones
C2 52"- 148" 10YR5/2 ExGrCSa <1 - <75 SG >20 >20
some stones
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 6 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #6
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5, HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
112"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 112
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
118"
10, POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 99 in/hr for
sample #4 taken at 72" below the
existing grade. It is recommended that a design infiltration rate <
20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon
soils. Winter water table was present at
112" below the existing rade.
Soils Strata Description
Soil Log #6
Horz Depth Color Texture %CL %ORG CF STR Nil
IND CEM R00 <X> FSP
A 0% 22" 10YR2/1 VGr/CobLm <25 <10 <45 1SBK - ff 2-6 2
C1 22"- 58" 10YR4/6 ExGr/CobCSa <1 - <85 SG - - - -
>20 >20
some stones
C2 58"- 118" 10YR5/2 ExGrCSa <1 - <75 SG - - - -
>20 >20
some stones
and boulders
Cgm3 118"-148" 10YR5/6 ExGrLmFSa <12 mas - Mod WI<
(Till)
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 7 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #7
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3, LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam (1110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
76"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 76
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and
Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 114 in/hr for
sample #5 taken at 36" below the
existing grade. It is recommended that a design infiltration rate < 20
in/hr be used for proposed
stormwater infiltration facilities located in the C2 horizon soils. Winter
water table was present at 76"
below the existing rade.
Horz Depth Color Texture
A 0"- 18" 10YR2/1 VCobLm
C1 18"- 24" 10YR4/6 EXGrLmW
FSa
C2 24"- 108" 10YR5/6 ExGr/CobC-
MSa some
stones and
boulders
Soils Strata Description
Soil Log #7
%CIL %ORG CF STR MOT
<25 <10 <55 1SBK
<8 <75 SG
IND CEM ROO <X> FSP
ff 2-6 2
>20 >15
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET: 8 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #8
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2, SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam(110)
4, DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
70"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 70
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C1 and C2 horizon soils. Winter water
table was present at 70" below the existing rade.
Horz Depth Color Texture
A 0"- 22" 10YR2/1 VGr/CobLm
C1 22"- 30" 10YR4/6 ExGr/CobC-
FSa
C2 3011-10811 10YR5/2 ExGr/CobC-
MSa some
stones and
boulders
Soils Strata Description
Soil Log #8
%CL %ORG CF STR
MOT
<25 <10 <55 1SBK
<1 - <80 SG
IND CEM ROO <X> FSP
ff 2-6 2
>20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings
LLC
SHEET: 9 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell,
PE
REVISED 5/25/2018
SOIL LOG: #9
LOCATION: See test pit location
map
1. TYPES OF TEST DONE:
2, SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6, DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
112"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 112"
IMPERVIOUS/RESTRICTIVE
Nearly level
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION RUNOFF PONDING
Slight Slight Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration
facilities located in the C1 and C2 horizon soils. Winter water
table was present at 112" below
the existing rade.
Horz Depth Color Texture
A 0"- 23" 10YR2/1 VGr/CobLm
C1 23" 76" 10YR4/6 ExGr/CobCSa
C2 76"- 144" 10YR5/2 ExGr/CobC-
MSa some
stones
Soils Strata Description
Soil Log #9
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<25 <10 <40 1SBK ff 2-6 2
<85 SG >20 >20
<80 SG >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:10 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #10
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
146"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 146
IMPERVIOUS/RESTRICTIVE
Sloping
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C2
horizon soils. Winter water table
was present at 146" below the existing rade.
Soils Strata Description
Soil Log #10
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"- 14" 10YR2/1 VGr/CobLm <25 <10 <40 1SBK ff 2-6 2
C1 14"- 28" 10YR3/4 ExGrM-FSa <1 - <85 SG ff >20 >15
C2 28"- 156" 10YR5/6 ExGr/CobCSa <1 <90 SG >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:11 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #11
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
Greater than bottom of hole
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: Greater than bottom
IMPERVIOUS/RESTRICTIVE
Nearly level
of hole
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11, SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C1
horizon soils. Winter water table was
not present to 144" below the existing rade, Hole cave in.
Soils Strata Description
Soil Log #11
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"- 30" 10YR2/1 VGr/CobLm <25 <10 <40 1SBK fm 2-6 2
C1 30"- 144" 10YR5/2 ExGrCSa <1 - <85 SG - fm >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:12 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
10YR2/1
VGr/CobLm
SOIL LOG: #12
16"- 26"
LOCATION: See test pit location map
ExGrSaLm
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
None
Spanaway gravelly sandy
Terrace
10YR5/1
loam (110)
4. DEPOSITION HISTORY:
5, HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
Greater than bottom of hole
7. CURRENT WATER
8, DEPTH TO
9. MISCELLANEOUS:
DEPTH: Greater than bottom
IMPERVIOUS/RESTRICTIVE
Nearly level
of hole
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C2 and C3 horizon soils. Winter water
table was not present to 162" below the existing rade. Hole cave
in.
Horz
Depth
Color
Texture
A
0"- 16"
10YR2/1
VGr/CobLm
C1
16"- 26"
10YR3/3
ExGrSaLm
C2
26"- 123"
10YR5/2
ExGrCSa
C3
123"- 162"
10YR5/1
MSa
Soils Strata Description
Soil Log #12
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<25 <10 <55 1SBK ff 2-6 2
<15 - <70 SG - - - ff 6-20 6
<1 <85 SG - - - - >20 >20
<1 - <10 SG - - - >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:13 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #13
LOCATION: See test pit location map
I. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6, DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
123mmmmmmm"
7. CURRENT WATER 8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 123 IMPERVIOUS/RESTRICTIVE
Sloping
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION RUNOFF PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and
Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 780 in/hr for
sample #6 taken at 72" below the
existing grade. It is recommended that a design infiltration rate < 20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon soils. Winter water table was present at
123" below the existing rade.
Soils Strata Description
Soil Log #13
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"- 18" 10YR211 VGr/Cobl-m <25 <10 <45 1 SBK - ff 2-6 2
C1 18"- 30" 10YR4/6 ExGrC-FSa <1 - <75 SG - - - ff >20 >20
C2 30"- 144" 10YR5/2 ExGrCSa <1 - <85 SG - - - >20 >20
Horz
A
C1
C2
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings
LLC
SHEET:14 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell,
PE
REVISED 5/25/2018
SOIL LOG: #14
LOCATION: See test pit location
map
1. TYPES OF TEST DONE:
2, SCS SOILS SERIES:
3, LAND FORM:
None
Spanaway gravelly sandy
Terrace
loam (110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
65"
7. CURRENT WATER
8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 65
IMPERVIOUS/RESTRICTIVE
Toe of Slope
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION
RUNOFF
PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: It is recommended that
a design infiltration rate < 20 in/hr be
used for proposed stormwater infiltration facilities located in the C1 horizon soils Winter water table was
resent at 65" below the existing
rade. Test pit was at the toe of slope.
Depth Color Texture
0% 20" 10YR2/1 GrLm
20" 36" 10YR416 ExGrM-FSa
36" 84" 10YR512 ExGrCSa
some stones
Soils Strata Description
Soil Log #14
%CL %ORG CF STR
MOT
<25 <10 <30 1 SBK
<1 - <75 SG
<1 - <85 SG
IND CEM ROO <X> FSP
ff 2-6 2
ff >20 >20
_ _ >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:15 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #15
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5, HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
Greater than bottom of hole
7. CURRENT WATER 8, DEPTH TO
9. MISCELLANEOUS:
DEPTH: Greater than bottom IMPERVIOUS/RESTRICTIVE
Nearly level
of hole HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION RUNOFF PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and
Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 555 in/hr for
sample #7 taken at 84" below the
existing grade. It is recommended that a design infiltration rate < 20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon soils. Winter water table was not
resent to 144" below the existing rade. Hole cave in.
Horz Depth Color Texture %CL
A 0"- 14" 10YR2/1 VGr/CobLm <25
C1 14"- 27" 10YR4/6 ExGrC-FSa <1
C2 27"- 144" 10YR512 ExGrCSa <1
Soils Strata Description
Soil Log #15
%ORG CF STIR MOT IND CEM ROO <X> FSP
<10 <50 1 SBK - ff 2-6 2
<80 SG - ff >20 >20
<90 SG >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:16 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #16
LOCATION: See test pit location map
1. TYPES OF TEST DONE:
2, SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
97'
7, CURRENT WATER 8. DEPTH TO
9, MISCELLANEOUS:
DEPTH: 97" IMPERVIOUS/RESTRICTIVE
Toe of Slope
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION RUNOFF PONDING
Slight
Slight
Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 1253 in/hr
for sample #8 taken at 60" below the
existing grade. It is recommended that a design infiltration rate <
20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon
soils. Winter water table was present at
97" below the existing rade. Test pit was at the toe of slope.
Horz Depth Color Texture
A 0"- 12" 10YR2/1 VGrLm
C1 12"- 21" 10YR4/6 ExGrC-FSa
C2 21"- 120" 10YR5/2 ExGrCSa
some stones
Soils Strata Description
Soil Log #16
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<25 <10 <55 1SBK - - ff 2-6 2
<80 SG If >20 >20
<1 <90 SG - >20 >20
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: NPR Holdings LLC
SHEET:17 OF 17
PROJECT NO.: 18103
DATE: 2/7/2018
PREPARED BY: William Parnell, PE
REVISED 5/25/2018
SOIL LOG: #17
LOCATION: See test pit location map
I. TYPES OF TEST DONE:
2. SCS SOILS SERIES:
3. LAND FORM:
Grain Size Analysis Test
Spanaway gravelly sandy
Terrace
loam(110)
4. DEPOSITION HISTORY:
5. HYDROLOGIC SOIL
6. DEPTH OF SEASONAL HW:
Glacial Outwash
GROUP: A
106"
7. CURRENT WATER 8. DEPTH TO
9. MISCELLANEOUS:
DEPTH: 106 IMPERVIOUS/RESTRICTIVE
Toe of Slope
HORIZONS:
Greater than bottom of hole
10. POTENTIAL FOR:
EROSION RUNOFF PONDING
Slight Slight Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: Grain size analysis and Ksat design infiltration rate
calculations resulted in a calculated infiltration rate of 410 in/hr for sample #9 taken at 66" below the
existing grade. It is recommended that a design infiltration rate <
20 in/hr be used for proposed
stormwater infiltration facilities located in the C1 and C2 horizon
soils. Winter water table was present at
106" below the existing rade. Test pit was at the toe of slope.
Horz Depth Color Texture
A 0" 20" 10YR2/1 VGr/CobLm
C1 20"- 38" 10YR4/6 ExGrC-FSa
C2 38" 122" 10YR5/2 ExGr/CobCSa
some stones
Soils Strata Description
Soil Log #17
%CL %ORG CF STIR MOT IND CEM ROO <X> FSP
<25 <10 <55 1SBK - ff 2-6 2
<85 SG If >20 >20
<85 SG >20 >20
Abbreviations
Textural Class
&Cementation
Structure
(CEM)
Grades of
Structure
(Texture)
Mod
(STR)
Str
Few - F
Fine
Cobbled
- Cob
Granular
- Gr
Strong -
3
Stone
- St
Blocky
- Blky
Moderate -
2
Gravelly
- Gr
Platy
- PI
Weak -I
Sandy
- Sa
Massive
- Mas
Loamy
- Lm
Single Grained - SG
Silty
- Si
Sub -Angular
Blocky - SBK
Clayey
- CI
Coarse
-c
Very
-V
Extremely
- Ex
Fine
- F
Medium
- M
Induration
&Cementation
(IND)
(CEM)
Weak -
Wk
Moderate -
Mod
Strong -
Str
Mot#les MOT
2nd Letter
Size
Few - f
Fine
1 Letter Abundance
1st Number
Size
2nd Letter
Contrast
Few - F
Fine
- 1
Faint
- F
Common - C
Medium
.2
Distinct
- D
Man - M
Coarse
- 3
Prominent
- P
Roots ROO)
1st Letter Abundance
<X> -Generalized range of infiltration rates trom Sub soli survey <<Aw;�)
2nd Letter
Size
Few - f
Fine
- f
Common - c
Medium
- m
Many - m
Coarse
- c
FSP -Estimated Design Field Saturated Percolation rate based on horizon specific
factors and specific test results.
Dso = 7.0
Dso = 19.0
furies = 0.004
log�o(Ksat) _ -1.57 + 1.90D�o + 0.015Dso - 0.013Dso - 2.08frnes
logto(Ksat) _ -1.57 + 1.90(0.7) + 0.015(7.0)
Ksat = 0.4071 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 577 in/hr
Desig
n Infiltration Rate Calculation :Nest n
Idesign
= Ksat initial X CFT
Ksat initial = 577 In/hr
CFT = CFv x CFt x CFm
CFT=1.0x0.4x0.9
CFT= 0.36
Idestgn = 577 X 0.36
Idesign = 208 in/hr
For stormwater facility design purposes, USe an Idesign < 20 in/hr.
Dso=
0.8
Dso =
7.0
Dso =
16.5
ftines
= 0.005
logio(Ksat) _ -1.57 + 1.90Dio + 0.015Dso - 0.013Dso - 2.08fenes
logio(Ksat) = -1.57 + 1.90(0.8) + 0.015(7.0) - 0.013(16.5)
Ksat = 0.6762 cm/s x 0.3937 in/cm x 60s/min x 60 min/.hr = 958 in/hr
Design
Infiltration Rate Calculation : Ideslgnn
Ideslgn = %sat initial X CFT
Ksat initial = 958 In/hr
'FT = CFv x CFt x CFm
CFT=1.Ox0.4x0.9
'FT= 0.36
Idesign = 958 X 0.36
Idesign = 345 in/hr
For stormwater facility design purposes, USe an Ideslgn < 20 in/hr.
Dso=
0.58
Dso =
6I5
Dso =
17.0
ftines
= 0.004
log�o(Ksat) _ -1.57 + 1.90Dio + 0.015Dso - 0.013Dso - 2.08fgnes
logio(Ksat) = -1.57 + 1.90(0.58) + 0.015(6.5) - 0. 013(17.0) - 2. 08(0.004)
Ksat = 0.2513 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 356 in/hr
Design Infiltration Rate Calculation : laesign
Idesign
= Ksat initial X CFT
Ksat Initial = 356 In/hr
CFT = CFv x CFt x CFm
CFT = 1 .0 x 0.4 x 0.9
CFT= 0.36
Idesign = 356 X 0.36
Idesign = 128 in/hr
For stormwater facility design purposes, use an laesign < 20 in/hr.
-.-NPR HoIdings_LLC_ ._.
3/4 3/8 4 10 20 40 60 100 200
100 its i
I f
go Tes!!i1
t Pit #6I!jii
at
tI
7
80- • Sample 4
CO 70---
60
FL I
•50
40 2If"
li
CL
�
30---
20
fill
100
100 10 1 Sample 4 0.1 0.01 0.001
Cuhh Graver Sand Sill Clay
Cnnrsc Medrrmr RIC
log,o(Ksat) _ -1.57 + 1.90D,o + 0.015Dso - 0.013Dso - 2.08ffines
log,o(Ksat) _ -1.57 + 1.90(0.52) + 0.015(9.5) - 0. 013(20.0) - 2.08(0.007)
Ksat = 0.1932 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 274 in/hr
Design
Infiltration Rate Calculation : Idesinn
(design = Ksat inllial X CFT
Ksat inulol = 274 in/hr
,FT = CFv x CFt x CFm
CFT=1.0x0.4x0.9
,FT= 0.36
(design = 274 X 0.36
(design = 99 in/hr
For
stormwater facility design purposes, use an (design < 20 inlhr.
Dso =
9.5
Dso =
20.0
fines
= 0.007
log,o(Ksat) _ -1.57 + 1.90D,o + 0.015Dso - 0.013Dso - 2.08ffines
log,o(Ksat) _ -1.57 + 1.90(0.52) + 0.015(9.5) - 0. 013(20.0) - 2.08(0.007)
Ksat = 0.1932 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 274 in/hr
Design
Infiltration Rate Calculation : Idesinn
(design = Ksat inllial X CFT
Ksat inulol = 274 in/hr
,FT = CFv x CFt x CFm
CFT=1.0x0.4x0.9
,FT= 0.36
(design = 274 X 0.36
(design = 99 in/hr
For
stormwater facility design purposes, use an (design < 20 inlhr.
NPR Holdings LLC
3l4 3/8 4 10 20 40 00 100 200
100-
go--
Test
00 Test Pit #7 at 36"
I ;I i i I
• Sample 5 t i
V)
E 70---
60
0 60
i 3
T
50
0)I !
40—
CO
CL
CL
3o
i i I
20
i' I I
i I i
Ilk
I
10
j � G
0
100 10 1 Sample 5 0.1 0.o1 0.001
Sbm/
Cohh Gravel Silt Clay
Conrsc Medium Pine
Dio =
0.60
Dso =
0.7
Dso =
17.0
ftines
= 0.005
logio(Ksat) _ -1.57 + 1.90Dio + 0.015Dso - 0.013Dso - 2.08ftines
logio(Ksat) = -1.57 + 1.90(0.60) + 0.015(0.7) - 0. 013(17.0) - 2. 08(0.005)
Ksat = 0.2234 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 317 in/hr
Design Infiltration Rate Calculation : Ideslpn
Idesign = Ksat initial
X CFT
Ksatinilial = 317 In/hr
CFT = CFv x CFt x CFm
CFT=1.0x0.4x0.9
CFT= 0.36
Idesign = 317 X 0.36
Idesign = 114 in/hr
For stormwater facility design purposes, use an Idesign < 20 inlhr.
Dto=
1.0
Dso =
6.7
Dso =
17.5
fines
= 0.009
logto(Ksat) _ -1.57 + 1.90Dto + 0.015Dso - 0.013Dso - 2.08ftines
logto(Ksat) = -1.57 or 1.90(1IU) + 0.015(6.7) - 0. 013(17.5) - 2. 08(0.009)
Ksat = 1.5286 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 2166 in/hr
Design
Infiltration Rate Calculation : Idesinn
Idesign = Ksat initial.X
CFT
Ksatinitiai = 2166 in/hr
,FT = CFv x CFt x CFm
CFT= 1 .0 x 0.4 x 0.9
CFT= 0.36
Idesign = 2166 X 0.36
Idesign = 780 in/hr
For stormwater facility design purposes, USe an Idesign < 20 in/hr.
NPR Holdings LLC
314 3/8 4 10 20 40 00 100 200
100 I� � !
so
Test Pit #15 at 84" I
f
Sample 7 !
1
E 70
60---
I
.3
En
40 I I E i i
I ( I iki I
30
20
10
0
100 10 1 Sample 7 0.1 0.01 0.001
Cobb Gravel sand .Silt Cirq�
Camse btedimn RIC
D10 =
0.9
Dso =
10.0
Dso=
18.5
fines
= 0.006
loglo(Ksat) _ -1.57 + 1.90D10 + 0.015Doo - 0.013Dso - 2.08frnes
loglo(Ksat) = -1.57 + 1.90(0.9) + 0.015(10.0) - 0. 013(18.5) - 2. 08(0.006)
Ksat = 1.089 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 1543 in/hr
Design
Infiltration Rate Calculation : (design
Idesign
= Ksat initial X CFT
Ksat inil3al = 1543 in/hr
'FT = CFv x CFt x CFm
,FT =1.0x0.4x0.9
CFT = 0.36
(design = 1543 X 0.36
(design = 555 in/hr
For stormwater facility design purposes, use an Ideslgn < 20 in/hr.
Dso= 1.1
Dso = 6.9
Dso= 16.5
'tines = 0.009
logio(Ksat) _ -1.57 + 1.90D�o + 0.015Dso - 0.013Dso - 2.08frnes
logio(Ksat) _ -1.57 + 1. 90(1.1) + 0. 015(6.9) - 0. 013(16.5) - 2. 08(0.009)
Ksat = 2.456 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 3481 in/hr
Desian Infiltration Rate Calculation : Idesian
(design = Ksat initial
X CFT
Ksat initial = 3481 In/hr
'FT = CFv x CFt x CFm
CFT=1.0x0.4x 0.9
,FT= 0.36
(design = 3481 X 0.36
(design = 1253 in/hr
For stormwater facility design purposes, use an (design < 20 in/hr.
NPR Holdings LLC
3/4 318 4 10 20 40 60 100 200
100
90
i I Test Pit #17 at 66"
•Sample 9 i
E 70-
0
0 o is
�60 � I i j ►�:�'� j � � Ifs
3 III I I I i t
o> 50
4�
N 40 1j I
CL
i
30
0_ I I III i I i I j I
i
20 I l i !II' 1 � ►ill'' � � I I I
10
o �
I � I i �
100 10 1 Sample 9 0.1 0.01 0.001
Sand .S!l!
(oil
Cnhh (irarel
Cnncsc A�dimn line
Dio =
0.85
Dso =
5.5
Dso =
16.0
'Fines=
0.007
logio(Ksat) _ -1.57 + 1.90Dio + 0.015Doo - 0.013Dso - 2.08frnes
logi0(Ksat) = -1.57 + 1.90(0.85) + 0.015(5.5) - 0.013(16.0) - 2.08(0.007)
Ksat = 0.8034 cm/s x 0.3937 in/cm x 60s/min x 60 min/hr = 1139 in/hr
Design
Infiltration Rate Calculation : Idesian
(design = Ksat initial X CFT
Ksatinitiai = 1139 in/hr
,FT = CFv x CFt x CFm
3FT=1.0x0.4x 0.9
'FT= 0.36
(design = 1139 X 0.36
(design = 410 in/hr
For stormwater facility design purposes, use an (design < 20 in/hr.
tz
t
IIS ,I � � •:.
f ,+�,v, ,
sp
Tor
toep IF if
—
be Now VI
.1 1f ——
i}I:a�_ - — _ Rt
To -
VI _____ v -w wn) am ns rf �_Ar . lv
'aamd _ _ _ _ m,rf� _ _- —11 K _ - — --� __ �i tt, : t 1 R Y i _ _ =.. K, -_•_ - _ _ _ _ rlr., .
oer
_ _
Tr —JI
_ :� .
�,
zl IV
1 IVole To I
V.
: -n
i - _ •/It
I _ ye_�
' � 1 9 spy
�- :L. !'
"oma -
'•..'
>aIV Q
_ fire
Trooep
1
I I
I - ato T
IL — /
I
1
1
— a
r
I
—n4
I —
TV ` :'
To
j
",, '
I . To
_ — _
Q _ to
_
I -
k - d
i
--,
-
_ i
- - ---
=`
'�e
,:�' ' �+rr%I - _
•�\m
. •h r
- v
o To'. i'. .. - - '\'
..� - - .. -
I.6.
0
r
l
— 5
i _or
t
, -. -
•.l • ..
i �• No I
L =T�.:
I
p- —
l-
IJ _
I TV
To To
=. .V. ,IV be. TNT to 1..
ob, Too11 to
- .. a :�
i
-'\T-Telfr . 4
v
I R
7 : e >
a= '! ...
L
1. _ _
1 = !
+1 .
i
t
1 ITt' l
U `: ;t1
I
141
o .
it
_ tIT
I. It
�r
�' "ti
i r<
IT me.¢.
TV .'
IfTV
<: 'i' ,' bear. /
s 'r — - �.To
i''
�,f. -
,
�'
}�_
t = �j .
a
_ �J
�;.. -.!
It
�1 t. cemb To .RToo _ ,
i' - - �. /'
r"'
TV
i1 /
hh
1. _
;. - -
:.
VI 0
M To
I —TV
7' J: /
li _.70 ny
, J
,
i
.• l . /•' ,
�.,
- Y. rt - •
ll , ��
I ,t.
I —
"•
i'
I�.s _ -
I
.
1 •'.f
a
IAT Lj
f t' .'.., r ,�
C�7
1�-
:1'. _
_ /.:"
1"'
dr
�t *me 0o.
iLL
-f —TV r
,t '
, t'
Go
bee
... ,
{I _
I IIt We to NoT
To
To Se"
- a. TV o
.`/ Too
AN
1
I Nod"- i':
9Toit
1
•,ra it
' - -ook 4
T -
bee 4 Too
TN tar m - ySF, af+
:�
t - 9i0 AGE •r - -I To
•.
I 1 - -` -- .yf.. -
' o., -11 1
>I _ n ��rr- f'
j I`�fl a>, :TIT
_ _tart �- _ `�� - - -
Ir
er
I:I 4-�JetTV�
-
Vo—
(bet lit
to
�III a --�--
�,,
f I 'N' -
►
to— VITI
}Ar
, jt' _.arc
• SII Ij'i �-, _
h
N.0; �r: ,
it -
1