18025.doe.sec.1 Proj Descrip Page 1-2____________________________________________________ 18025 Drainage Report 1-2 PART 1 – PROJECT SITE ANALYSIS AND DATA Permit Requested: Site Plan Review Other Permits Required: Building Permit Grading/Earthwork SEPA Review Agency Permit No.: Pending Site Address: 939 Northern Pacific Rd Yelm, Washington 98597 Section, Township, Range: Section 19 Township 17 Range 02E, W.M Total Site Area: 13.93 Acres Zoning: I - Industrial Project Overall Description The project includes the development of an auto wrecking yard named, Yelm Auto Recycling, on lot 64300900200. Development will include 4 structures to be used for office space, storage and general shop/maintenance space. Construction will also include onsite customer parking, graveled and paved vehicle storage yards, water, sewer, and power service, stormwater facilities. Frontage improvements are proposed, but will be deferred until required by the City. Proposed Flow Control Improvements The flow control facilities consist of bioretention cells, infiltration trenches and infiltration cells. Test pits dug at the facility locations revealed infiltration rates more than 100 in/hr. For design purposes, stormwater facilities were modeled with 20 in/hr. The soils report can be found in Appendix #2 of this document. Proposed Water Quality Improvements The water quality facilities consist of bioretention cells. The bioretention cells are designed to treat 91% of the runoff profile. The bioretention cells utilize a 12 in/hr design infiltration rate with a Ksat safety factor of 4. Proposed Conveyance System The proposed conveyance systems will consist of Type I catch basins and conveyance pipe in various sizes to distribute stormwater to the proposed stormwater facilities. Surface flow will also be handled using clay lined V ditches. Proposed Discharge Location The project site will infiltrate all runoff at the proposed infiltration trenches/cells.