R0-01 - Civil Plan Review Checklist3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 1/6 STANDARD ITEMS: WATER, SANITARY SEWER, STORM SEWER, STREET, LIGHTING, AND SIGNALS ( ) Vicinity Map ( ) Legend (APWA Standard Symbols) ( ) North Arrow ( ) Scale Bar ( ) Datum - Bench Mark Elevation And Location (on all sheets where elevations are referenced) ( ) Title Block: ( ) Title: APPROVED FOR CONSTRUCTION ( ) Design By: ( ) Drawn By: ( ) Date: ( ) Checked By: ( ) Signature Approval Block ( ) Sheet Number of Total Sheets: ( ) Section, Township and Range (every plan/profile sheet) ( ) Engineers Stamp (signed and dated) ( ) Project Title (cover sheet) ( ) Utility System Map (showing all proposed utilities on one drawing) ( ) Revision Block PLAN PORTION STANDARD ITEMS ( ) Center line and Stations ( ) Edge of Pavement and Width ( ) Right-of-Way and Width ( ) Proposed Survey Monumentation Locations and Details ( ) Sidewalk and Width ( ) Roadway Sections ( ) Existing Utilities (above and below ground) ( ) Adjacent Property Lines, Ownership, Parcel Number, and Street Address ( ) Identify Street Names, Right-of-Way, Lots ( ) Identify Match Existing Sheet Numbers and Stations ( ) Easements, Width and Type ( ) Define Survey Baselines ( ) Stations for Structures ( ) Flow Direction Arrows PROFILE PORTION STANDARD ITEMS 3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 2/6 ( ) Profile Grades (decimal FT./FT.) ( ) Existing Ground ( ) Scale (horizontal and vertical) ( ) Stationing ( ) Vertical Elevation Increments ( ) Existing Utilities (if available) Misc. ( ) Detail Sheet ( ) General Notes SANITARY SEWER Plan View: (Gravity System) ( ) Manhole ( ) Station Shown at Each Manhole (watch spacing) ( ) Manholes Numbered ( ) Manhole Type Designation ( ) Flow Direction (with arrow on pipe) ( ) Depth at Property Line and Distance from Downhill Manhole for Side Sewer ( ) Distance from Water Lines ( ) Service to Each Lot Profile View: ( ) Manholes Numbered ( ) Invert Elevation Showing Direction, In and Out ( ) Gravity ( ) Grades Shown (decimal form FT./FT.) slopes, depths ( ) Type of Pipe ( ) Size of Pipe ( ) Length of Pipe (in L.F.) ( ) Existing Utilities Shown STEP SYSTEM ( ) Pipe Alignment, grade and offset, type and size ( ) Location of water, utilities crossing ( ) Location of pigging ports ( ) Location of pressure sustaining valves, check valves, vacuum valves, pressure relief valves, gate valves ( ) Trench and restoration details showing depth, bedding compaction requirements ( ) Septic (STEP) Tank 3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 3/6 ( ) Inverts elevation ( ) Size, type, location ( ) Side sewer location ( ) Electrical hookups ( ) Alarm and controls ( ) Pump operational characteristics ( ) Pump type Misc.: ( ) Detail Sheet ( ) Sewer General Notes WATER Plan View: ( ) System Map (1” = 300’) showing existing and proposed with line size, valves, and hydrants ( ) Existing Utility Conflicts ( ) Fixtures (need horizontal and vertical control) ( ) Fire Hydrants (at all intersections. See Yelm Fire District #2) ( ) Blow-off (at end of line) ( ) Vacuum and Air Release Valves When Required ( ) Tees, Crosses, Elbows, Adapters and Valves Need Coupling Type, Meter Locations ( ) Valves (2 each tee, 3 each cross) ( ) Fire Department Connection ( ) Thrust Blocking Required at all Fittings Including In-Line Valves ( ) Distance from Sewer ( ) Service to Each Lot (include open tracts) Profile View: ( ) Existing Utility Crossings ( ) Show Fixtures (tees, crosses, hydrants) ( ) Show Valves and Couplers ( ) Size of Water-main ( ) Length of Water-main (in L.F.) ( ) Cover Over Pipe ( ) Grades (Engineered Design Grade to F.L.) Misc. ( ) Detail Sheet ( ) Water General Notes STORM SEWER ( ) Drainage and Erosion Control Plan Report ( ) Cover sheet ( ) Table of Contents ( ) Section 1 - Proposed Project Description ( ) Section 2 - Existing Conditions ( ) Section 3 - Infiltration Rates/Soils Report ( ) Section 4 - Wells ( ) Section 5 - Fuel Tanks ( ) Section 6 - Sub-Basin Description ( ) Section 7 - Analysis of the 100-Year Flood ( ) Section 8 - Aesthetic Considerations for Facilities ( ) Section 9 - Downstream Analysis ( ) Section 10 - Covenants, Dedications, Easements ( ) Section 11 - Homeowners - Articles of Incorporation ( ) Project Engineers Certificate ( ) Facility Summary Form ( ) Engineer ’s Estimate ( ) Erosion Control Plan Report ( ) Section 1 - Construction Sequence and Procedure ( ) Section 2 - Trapping Sediment 3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 4/6 ( ) Section 3 - Permanent Erosion Control and Site Restoration ( ) Section 4 - Geotechnical Analysis and Report ( ) Section 5 - Inspection Sequence ( ) Drawings and Specification ( ) Vicinity map ( ) Project Boundaries ( ) Sub-Basin Boundaries ( ) Off-Site Area Tributary to Project ( ) Contours ( ) Major Drainage Features ( ) Flow Path ( ) Site Map ( ) Existing Topography at Least 50 Feet Beyond Site Boundaries ( ) Finished Grades ( ) Existing Structures within 100 Feet of Project Boundary ( ) Utilities ( ) Easements, Both Existing and Proposed ( ) Environmentally Sensitive Area ( ) 100-Year Flood Plain Boundary ( ) Existing and Proposed Wells within 1,200 feet of Proposed Retention Facility ( ) Existing and Proposed Fuel Tanks ( ) Existing and Proposed On-Site Sanitary Systems within 100 Feet of Detention/Retention Facilities ( ) Proposed Structures Including Roads and Parking Surfaces ( ) Lot Dimensions and Areas ( ) Proposed Drainage Facilities and Sufficient Cross-Section and Details to Build ( ) Plan View - Conveyance System ( ) Station and Number at each Manhole/Catch Basin ( ) Manhole/Catch Basin Type and Size ( ) Manhole/Catch Basin Rim Elevation ( ) Flow Direction with Arrow on Pipe/Channel ( ) Type and Size of Pipe ( ) Length of Pipe in Lineal Feet ( ) Profile View - Conveyance System ( ) Station and Number at each Manhole/Catch Basin ( ) Rim Elevation ( ) Invert In and Out ( ) Length of Pipe (in L.F.) ( ) Grades (FT./FT.) ( ) Design Velocity ( ) Work Map ( ) Unit Areas (including Off-Site Contributing Areas) ( ) Percentage Impervious ( ) Average Slope ( ) Estimated Ultimate Infiltration Rate ( ) Conveyance Date, Identifier (for Reference to Model Output), Length, Slope, Inverts ( ) Overland Flow Paths and Distances ( ) Soil Types ( ) Spot Water Surface Elevations, Discharges and Velocities for the Design Event ( ) Erosion Control Drawing ( ) Soil Types ( ) Locations of Soil Pits and Infiltration Tests ( ) Construction Entrance Detail ( ) Silt Fences and Traps ( ) Mulching and Vegetation Plan ( ) Clearing and Grubbing Limits ( ) Existing and Finished Grade 3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 5/6 ( ) Details and Locations of all BMPs Recommended ( ) Location and Details of Temporary Sediment Ponds ( ) Maintenance Report ( ) Required Type and Frequency of Long-Term Maintenance ( ) Identification of Responsible Maintenance Organization ( ) Frequency of Sediment Removal ( ) Cleaning of Catch Basins ( ) Vegetation Control ( ) Annual Cost Estimate of Maintenance ( ) Construction Inspection Report Misc. ( ) Detail Sheet ( ) Storm General Notes STREET Plan View: ( ) Flow Direction Arrows at Curb Returns Showing Grade ( ) Spot Elevations on Curb Returns ( ) Station PC, PT, PI, and Intersections ( ) Curve Information Delta, Radius, Length and Tangent ( ) BCR and ECR (Begin Curb Radius, End Curb Radius) ( ) Identify All Field Design Situations ( ) Typical Sections ( ) Pavement Marking Details With Station and Offset ( ) Sidewalks ( ) Driveway Entrances ( ) Station ( ) Width, Material ( AC, PCC) ( ) Driveway Type ( ) Curb Ramps - Detail and Type ( ) Public Transit Facilities and Bus Stops Profile View: ( ) Vertical Information VPI, BVC, EVC, AP, Low Point, High Point ( ) Show Grades in Decimal Form with (+ or -) Slope ( ) Super Elevated Roadways ( ) Detail - Show Transitions ( ) Special Detail Showing Gutter Flowing Adequately Misc. ( ) Detail Sheet ( ) Street General Notes ( ) AASHTO Street Design Worksheet, With Soils Report, if Applicable ILLUMINATION AND SIGNALS ( ) Lighting ( ) Station and Offset to Fixtures ( ) Pole Type, including Manufacturer ( ) Mounting Height, Arm Length, Anchor Bolt Size and Pattern ( ) Power Source ( ) Wire size, Type, Conduit ( ) Line Loss Calculations ( ) Luminaire Type, Lamp Wattage ( ) Location of Service Disconnects (5% Max. Voltage Drop from Source to Farthest Luminaire) ( ) J-Box Location (include station and offset) ( ) Signals (Follow WSDOT Specs Unless Otherwise Required by the City) ( ) Station and Offset to Signal Base, Cabinets, Ped. Lead, Loops, etc. ( ) Wiring Schedule ( ) Signal Heads and Mounting Assembly ( ) Detection Loops ( ) Opticom ( ) Control Cabinet, Size and Layout ( ) Power Source 3/2/2020 New Submission https://lf.yelmwa.gov/Forms/CivilPR 6/6 ( ) Conduit ( ) Wire Size and Type ( ) Construction Notes ( ) J-Box Schedule ( ) Pedestrian Signal Type with Push Button ( ) Controller Type, Configuration, and Wiring Schematic Misc. ( ) Detail Sheet ( ) Lighting General Notes ( ) Line Loss Calculations MISCELLANEOUS ( ) Easements and/or Dedication Deeds ( ) Contract Documents/Specifications Additional Items: ( ) Sheet Index (on title sheet if required) ( ) Field Verify Note on DWG - Expose Connection Points And Verify Fittings 48 Hours Prior To Distributing shut-Down Notices ( ) Call Before You Dig Note ( ) Signing - Temporary And Permanent ( ) Channelization ( ) Location of Cluster Mailboxes Applicant Agreement:* I have read the above Application Requirements and understand that there is a $250.00 deposit fee required before review of my application. I Agree