Approved TESC C2.1_ECPLC2.1TEMPORARY EROSION ANDSEDIMENT CONTROL PLANDESIGN PERMIT MANAGEEngineeringNPR RECYCLINGILTRLEMLABW.EBORAPPROVAL EXPIRES:APPROVED FOR CONSTRUCTIONBY:DATE:CONSTRUCTION ENTRANCE - BMP C105CONTRACTOR SHALL INSTALL 15 FT WIDE CONSTRUCTION ENTRANCE/EXITUSING 4 TO 8 INCH MINUS QUARRY ROCK 12 INCHES THICK PER WSDOE FIGUREII-4.2.12. CRUSHED CONCRETE WILL NOT BE ALLOWED. PLACE A WOVENGEOTEXTILE WITH A GRAB TENSILE STRENGTH OF 200 PSI IF SOFT SOILS AREENCOUNTERED. PROVIDE LENGTH PER PLAN. CONTRACTOR SHALL REMOVEALL SILT FENCING ONCE THE PROJECT IS COMPLETED OR DETERMINED TO BESTABILIZED BY THE PROJECT ENGINEER.CONCRETE WASHOUT AREA - BMP C154CONTRACTOR SHALL PROVIDE THE CONCRETE WASHOUT AREA AT THELOCATION SHOWN ON THE APPROVED TESC PLANS. CONTRACTOR SHALL USEONE OF THE TWO OPTIONS SHOWN ON WSDOE FIGURE II-4.1.7A. WASHOUTAREA SHALL BE A MINIMUM 10-FOOT X 10-FOOT SQUARE. CONTRACTOR SHALLMAINTAIN THE BMP THROUGHOUT CONSTRUCTION AND REMOVE WASHOUTWATER AS NEEDED DURING THE WINTER MONTHS. CLEAN ALL CONCRETETOOLS OVER THE WASHOUT AREA. NO WASHOUT AREA WATER MAY ENTER THEGROUND, SURFACE OR ONSITE STORMWATER SYSTEM.STORM DRAIN INLET PROTECTION - BMP C220CONTRACTOR TO PROVIDE INLET PROTECTION ON ALL NEW CATCH BASININLETS IMMEDIATELY AFTER INSTALLATION. ALL EXISTING CATCH BASINSWITHIN 500 FEET OF THE SITE CONSTRUCTION ENTRANCE SHALL ALSO RECEIVEINLET PROTECTION. SEE DETAIL ON APPROVED PLANS. REMOVE THE BMP'SONCE THE SITE IS DETERMINED TO BE STABILIZED BY THE PROJECT ENGINEER.SILT FENCING - BMP C233CONTRACTOR SHALL INSTALL ALL SILT FENCING PER APPROVED TESC PLANAND WSDOE FIGURE II-4.2.12. SILT FENCING ALONG THE CLEARING LIMITS SHALLBE ORANGE IN COLOR. SEE PROJECT SWPPP FOR SILT FENCINGSPECIFICATIONS.WATTLES - BMP C235CONTRACTOR SHALL PROVIDE WATTLES PER APPROVED TESC PLAN ANDWSDOE FIGURE II-4.2.14.NORTHERN PACIFIC RD NW