Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Energy Forms
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Oct 2017 General Info Project Title: NPR 515 Date 1/23/2019 PROD -SUM form Project Street Address 939 Northern Pacific Rd For Building Department Use shall be provided as Project City, County, Zip: Yelm WA 98597 a cover sheet for all compliance form Project Owner or Rep: Ubaida Mufrej submittals. Project Title shall match Jurisdiction: City of Yelm project plans title block. Project Description New Construction and Additions Select all that apply to the 0 New Building ❑ Building Addition scope of project. Select Addition + Existing or Existing Building Retrofit Alteration + Existing if the existing building wilt be ❑ Alteration ❑ Change of Occupancy ❑ Change in Space Conditioning combined with the addition oralteration to demonstrate Historic Building compliance per Section C502.1 or C503.1. Building Elements Scope - Select all that apply ❑ All Building Envelope ❑ Mechanical Systems ❑ Service Hot Water Systems Q Lighting Systems ❑ Electrical Systems Q All Commercial 0 Group R - R2, R3, & R4 Q Mixed Use over 3 stories and all R1 anC OCCl1 Type Occupancy Yp Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. Mixed Occupancy - Building is three stories or less above grade and it has both Commercial and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Select all that apply to the scope of project ❑ Fully Conditioned ❑ Semi-heated2 ❑ Refrigerated Spaces (Warehouse and/or Walk-in') [� i.ow Energy Space Category' Space Conditioning Eligible Low Energy Spaces Categories ❑� Unconditioned ❑ Low energy heating/cooling capacity ❑ Wireless service [] Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area Stories 1 2,281 Compliance Method 1 - General Compliance Method 2 - Total Building Performance Compliance Method 1 - Projects shall demonstrate compliance with all applicable mandatory and prescriptive requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms to General Compliance include with a Prescriptive submittal.. All applicable ENV, LTG, and MECH. Path Compliance Method 2 - Projects complying via total building performance (TBP) shalt include a summary of results from a whole building energy model per Section C407 and shall demonstrate compliance with all applicable mandatory provisions in this Code. Refer to Section C401.2, item 2 for more information. Compliance forms to include with a TBP submittal; PROD -SUM, ENV -CHK LTG -EXT, LTG -CHK, and all MECH forms except MECH-ECONO and MECH-VENT (pending). Note 1- Refrigerated Spaces - They shall comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. Note 2 - Semi -heated Spaces - If heated with equipment other than electric resistance may take an exemption for wall insulation. All other envelope assemblies shall comply with the thermal envelope provisions. Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from all provisions in WSEC Section C402 Building .Envelope, however all other applicable provisions in the Code do apply including lighting, mechanical, service water heating, etc. Note 4 - Eligible Space Conditioning For Low Energy Greenhouses - Greenhouses are defined as spaces that maintain a specialized sunlit environment that is used exclusively for cultivation, protection and maintenance of plants. Cooling with outside air and/or evaporative cooling, and any form of heating equipment, are allowed under the Low Energy Greenhouse category. Greenhouses with cooling equipment that requires a condensing unit are NOT eligible. 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 uver 3 stories and all R1 Revised Oct 2017 Generallnfo Project Title: NPR 518 Date 1/23/2019 PROJ-SUM form Project Street Address: 939 Northern Pacific Rd For Building Department Use shall be provided as Project City, County, Zip: Yelm WA 98597 a cover sheet for all compliance form Project Owner or Rep: Ubaida Mufrej submittals. Project Title shall match Jurisdiction: City of Yelm project plans title block. Project Description New Construction and Additions Select all that apply to the Q New Building ❑ Building Addition scope of project. Select Addition + Existing or =xisting Building Retrofit Alteration + Existing if the existing building will be ❑ Alteration ❑ Change of Occupancy ❑ Change in Space Conditioning combined with the addition or alteration to demonstrate ❑ Historic Building compliance per Section C502.1 or C503.1. Building Elements Scope - Select all that apply ❑ All Q Building Envelope ❑ Mechanical Systems ❑ Service Hot Water Systems PI Lighting Systems ❑ Electrical Systems Q All Commercial 0 Group R - R2, R3, & R4 Q Mixed Use over 3 stories and all R1 Occupancy Type Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. Mixed Occupancy - Building is three stories or less above grade and it has both Commercial and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Select all that apply to the scope of project ❑ Fully Conditioned ❑ Semi-heated2 ❑ Refrigerated Spaces (Warehouse and/or Walk-in') 0 Low Energy space Category' Space Conditioning Eligible Low Energy Spaces Categories Unconditioned F1 Low energy heating/cooling capacity ❑ Wireless service ❑ Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area Stories 1 1,440 Q Compliance Method 1 - General C Compliance Method 2 - Total Building Performance Compliance Method 1 - Projects shall demonstrate compliance with all applicable mandatory and prescriptive requirements of this code. Refer to C401.2, item 1 for more information. Compliance forms to General Compliance include with a Prescriptive submittal: All applicable ENV, LTG, and MECH. Path Compliance Method 2 - Projects complying via total building performance (TBP) shall include a summary of results from a whole building energy model per Section C407 and shall demonstrate compliance with all applicable mandatory provisions in this Code. Refer to Section C401.2, Item 2 for more information. Compliance forms to include with a TBP submittal: PROD -SUM, ENV -CHK, LTG -EXT, LTG -CHK, and all MECH forms except MECH-ECONO and MECH-VENT (pending). Note 1 - Refrigerated Spaces - They shall comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. Note 2 - Semi -heated Spaces - If heated with equipment other than electric resistance may take an exemption for wall insulation. All other envelope assemblies shalt comply with the thermal envelope provisions. Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelope, however all other applicable provisions in the Code do apply including lighting, mechanical, service water heating, etc. Note 4 - Eligible Space Conditioning For Low Energy Greenhouses - Greenhouses are defined as spaces that maintain a specialized sunlit environment that is used exclusively for cultivation, protection and maintenance of plants. Cooling with outside air and/or evaporative cooling, and any form of heating equipment, are allowed under the Low Energy Greenhouse category. Greenhouses with cooling equipment that requires a condensing unit are NOT eligible. 2015 WSEC. Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Oct 2017 General Info Project Title: NPR513 Date 1/23/2019 PROJ-SUM farm Project Street Address: 939 Northern Pacific Rd For Building Department Use shall be provided as a cover sheet for all Project City, County, Zip: Yelm WA 98597 compliance form Project Owner or Rep: Ubaida Mufrej submittals. Project rifle shall match Jurisdiction: City of Yelm project plans title block. Project Description New Construction and Additions Select alt that apply to the 0 New Building ❑ Building Addition scope of project. Select Addition + Existing or Existing Building Retrofit Alteration + Existing if the existing building will be ❑ Alteration ❑ Change of Occupancy ❑ Change in Space Conditioning combined with the addition or alteration to demonstrate Historic Building compliance per Section C502.1 or C503.1. Building Elements Scope - Select all that apply ❑ All ❑✓ Building Envelope ❑ Mechanical Systems ❑ Service Hot Water Systems Lighting Systems ❑ Electrical Systems © All Commercial O Group R - R2, R3, & R4 O Mixed Use over 3 stories and all R1 Occupancy Type l� y yp Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. Mixed Occupancy - Building is three stories or less above grade and it has both Commercial and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Select all that apply to the scope of project ❑ Fully Conditioned ❑ Semi-heated2 ❑ Refrigerated Spaces (Warehouse and/or Walk-in') ❑✓ Low Energy Space Category' Space Conditioning Eligible Low Energy Spaces Categories 0 Unconditioned ❑ Low energy heatingicooling capacity ❑ Wireless service ❑ Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area Stories 1 1,440 Compliance Method 1 - General C Compliance Method 2 - Total Building Performance Compliance Method 1 - Projects shall demonstrate compliance with all applicable mandatory and General Compliance prescriptive requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms to include with a Prescriptive submittal: All applicable ENV, LTG, and MECH. Path Compliance Method 2 - Projects complying via total building performance (TBP) shall include a summary of results from a whole building energy model per Section C407 and shall demonstrate compliance with all applicable mandatory provisions in this Code. Refer to Section C401.2, item 2 for more information. Compliance forms to include with a TBP submittal: PROD -SUM, ENV -CHK, LTG -EXT, LTG -CNK, and all MECH forms except MECH-ECONO and MECH-VENT (pending). Note 1 - Refrigerated Spaces - They shall comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. Note 2 - Semi -heated Spaces - if heated with equipment other than electric resistance may take an exemption for wall insulation. All other envelope assemblies shall comply with the thermal envelope provisions. Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from alt provisions in WSEC Section C402 Building Envelope, however all other applicable provisions in the Code do apply including lighting, mechanical, service water heating, etc. Note 4 - Eligible Space Conditioning For Low Energy Greenhouses - Greenhouses are defined as spaces that maintain a specialized sunlit environment that is used exclusively for cultivation, protection and maintenance of plants. Cooling with outside air and/or evaporative cooling, and any form of heating equipment, are allowed under the Low Energy Greenhouse category. Greenhouses with cooling equipment that requires a condensing unit are NOT eligible.