Floors Bldg 518 Repair ShopMaterials: 0 Steel Building: See steel building submittal Concrete: Fc"=3000 Rebar: ASTM A615 grade 60 except #3 hoops may be Grade 40, use ASTM A706 rebor for all welded applications. LULU Anchor Bolts: ASTM A307 or ASTM A36 or better threaded Rod with Nuts, or J—Bolts, QUALITY ASSURANCE: z oCo 1. The owner shall retain on inspection Service independent from the building contractor. The Inspection Service shall be responsible for performing � 7 o inspections when ordred by the contractor, collecting quality assuance documents, and certifing complance with the plans and specifications. 2. See below for inspection points. o w Cl) 3. The inspections conducted the building official will satisfy the those items usually inspected by the building offiicial. The building official shall 00 c designate those items that will be inspected by the building official. LU a 4. The contractor shall ensure that all inspections are performed and ore satisfactory before work is covered. Work covered before it can be certified satisfactory may be ordered to be opened for inspection at the contractors expense. Items that are designated unsatisfactory shall be corrected at� the contractor's expense. X Zi - � St0NM_ E L 3 ra � NPR REPAIR SHOP 518 Special Inspections: a, Building Identification: STAR Job 16—B-78518 Building Size:30x23x16, 1.5:12 pitch roof -- C) 8556 total ft"2. 1. Statement of Special Inspection: Special inspection 0 N 0', Building Risk Cat II, Construction Type 1113, no sprinklers beyond that normally inspected in the sequence of D o Occupancy: S1 (Vehicle Repair), construction by the building offical is required for following: 6 N 5 L Occupancy Density 100 Ft 2/occupant, Occupant load 6 people per Chapter 10, High—Strength Bolts — A325 pretensioning for 0) 2: Requires 1 exit, max travel 200 feet. provided 1 egress routes travel distance less than Building Main Frames connections. CY_ . D 100 feet Seismic Resistance —Wind Resistance — No special ft^2 inspection required for wind and seismic beyond those Size Restrictions: Table 506.2 — 17500 ft^2, without setback increases, Section 903.2.9.1 12.000 normally provided by the building official. Notes: Con ~ e n t S • Vl q This project builds a new shop for repair of motor vehicles. The building will be a pre --engineered building from Star Building Systems, supported on a reinforced concrete foundations. Floor Plan A1.1 U Plans Site plan by others Elevations A2.1 _CD 75 0J Foundation Plan S1.1 ^, cu 0 u NREC Heated Building R25+R11ci for roof, R13+R10ci Walls, R10 foundation. Man Doors U<=0.37, Overhead door lJ<=.34 Vapor Barriers shall be installed on the heated side with sealed joints and openings, All weather barriers shall be sealed and or caulked Foundation Details S1.2 & S1.3 _ = C4 - 00 consistent with industry good practice. Floor Reinforcement S1.4 4 - Lighting Design build by others, Lighting wattage is limited as listed on sheet A1.1. z O LOADs: Snow: Pf=25 PSF Wind: 85MPH, Exposure C, ht=20ft, Partially Enclosed, Kz=1.0, Kt=1.0, qs=18.5. PSF Iw=1.0 P4 Seismic: Cs= 0.13, Ss=..479, S1=.147, Sds=.453 Sd1=.216, Fa=1.415, Fv=2.213, R=3.5 (OSMF) Rho=1.0 _-- Dead for steel building 5 PSF, dead for wood walls 15 PSF. Soil: 1500 PSF vertical bearing. Materials: 0 Steel Building: See steel building submittal Concrete: Fc"=3000 Rebar: ASTM A615 grade 60 except #3 hoops may be Grade 40, use ASTM A706 rebor for all welded applications. LULU Anchor Bolts: ASTM A307 or ASTM A36 or better threaded Rod with Nuts, or J—Bolts, QUALITY ASSURANCE: z oCo 1. The owner shall retain on inspection Service independent from the building contractor. The Inspection Service shall be responsible for performing � 7 o inspections when ordred by the contractor, collecting quality assuance documents, and certifing complance with the plans and specifications. 2. See below for inspection points. o w Cl) 3. The inspections conducted the building official will satisfy the those items usually inspected by the building offiicial. The building official shall 00 c designate those items that will be inspected by the building official. LU a 4. The contractor shall ensure that all inspections are performed and ore satisfactory before work is covered. Work covered before it can be certified satisfactory may be ordered to be opened for inspection at the contractors expense. Items that are designated unsatisfactory shall be corrected at� the contractor's expense. X Zi - � St0NM_ E FLOOR PLAN Scale 114"=1 k A B (D - 4ftx5ft landing -P `� 4 d PQ m 0 CD OC OJ _N d >-y� Lr) I OD Cl) Lr) O U 4 -ED 4 ICL O z � PCI Single Single Bay — 621 SF Lighting Allowance —285W = .46w/ft2x621SF 750W exterior, Zone 3 Base o Insulation Requirements — � o ��(0 Roof R25+R11LS Coo C9 ti Walls R13+R10CI O W �, Foundation R10 rigid c LU� Man door U<= 0.37 a. r- cn �. Overhead Door U<= 0.34 -------- ❑verhead door 1 1 1 I EXIT El 2A 3070 MD 4ftx5ft landing -P `� 4 d PQ m 0 CD OC OJ _N d >-y� Lr) I OD Cl) Lr) O U 4 -ED 4 ICL O z � PCI LIAR 0 5 2019 �� W B� of WAQf. 46��� o 0 0) � o ��(0 Coo C9 ti c� CO °o O W �, c LU� O , ) LO 0 � a. r- cn �. LIAR 0 5 2019 �� W B� of WAQf. 46��� OUTH SIDE ELEVATION Scale 1/4"=1 ft 1.5 [lT2-- NORTH SIDE ELEVATION Scale 114"=1 ft I in EAST SIDE ELEVATION Scale 1/4"=1 ft I I � I I k i i l l I i j I t ` ( I I t E � 3 I in CD in cu c 0 c DJ Ln co I 0) LO -C 4p u 75 cu OL) 0 U --A — co :1E Cl- -Q 0 TWEST SIDE ELEVATION pq pq Scale 1/4"=1 ft Q) LU LU OD LLJ (o op 0 LLI 00 LU(0 :3 IL U) LO l i i I I ( I ; I I ; MAR 0 5 2019 I E t ! f � � I ' of WA I � I E ! 1 I I I � Err 29aM EAST SIDE ELEVATION Scale 1/4"=1 ft I I � I I k i i l l I i j I CD in cu c 0 c DJ Ln co I 0) LO -C 4p u 75 cu OL) 0 U --A — co :1E Cl- -Q 0 TWEST SIDE ELEVATION pq pq Scale 1/4"=1 ft Q) LU LU OD LLJ (o op 0 LLI 00 LU(0 :3 IL U) LO l i i I I ( I ; I I ; MAR 0 5 2019 I E t ! f � � I ' of WA I � I E ! 1 I I I � Err 29aM "8 -INCH FROST WALL SFCJON S1.2 Scale 112"=1 ft 8"x24" Frost wall, Two #5 rebar top and Bottom, Lap 24" #3 x20" frostwall vert I space 10" R-10 Foundation Insulation " Scale 3141'1 ft #4 2424 CORNER BARS FOOTING 24"x28"x12 conc footing with two #4 x22" rebar spaced 8" long way and Two #4 x 18"rebar spaced 6" shortway with 6" bottom cover. _ Six #5 8"x29" verts spaced 5" PLINTH #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. Four --Bolt Thrust Channel Four i" dia x 18" min Anchor bolts, 3" projection Concrete floor F2C PLAN VIEW Scale 31411=1 ft #4 24x24 CORNER BARS FOOTING �I 24"x28"x12 conc footing with two #4 x22" rebar spaced 8" long way and Two #4 x 18"rebar spaced 6" shortway with 6" bottom cover. o Six #5 8"x29" verts spaced 5" E 2'-4" 1 0 PLINTH #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. '-2 Four --Bolt Thrust Channel Four J" dia x 18" min Anchor bolts, 3" projection 2 SECTION VIEW F3 Four #5 rebar in footing, 8" OC as shown 51.2 Scale 112"=1 ft Two # 5 Cane bars into slab, 22 Two #5 Horz Bars #3 Verts, top and bottom of 6x18x6 Frost wall 12" OC Minimum degrees, as shown. Six #5 8"x30" vertical "L" bars. 3 8"x12" hoops spaced 3"OC for 2 spaces, 6" OC thereafter 8" long anchor bolts Frost wall 3' 3 11ptlonal Forminp Aid !I� iII ! �, �" compactetl,, Cav,�l...x29 EVartical! $ars 317315 SECTION Four—Bolt Thrust Channel, Four" S1.2 Scale 1I2"=1 ft dia x 18" min Anchor bolts, 3" aro lection Seal Air 'i Boundary F313 PLAN VIEW FOOTING F3C PLAN VIEW FOOTING Scale 3141'=1 ft 24"x30"x12 conc footing Scale 31411=1 ft 24"x30"x12 cone footing with two #4 x24" rebar spaced 8" long with two #4 x24" rebar spaced 8" long „ way and Two #4 x 18"rebar spaced 6" a� mC � rn way and Two #4 x 18"rebar spaced 6" shortway with 6" bottom Cover shortway with 6" bottom Cover Six #5 8"x29" verts spaced 5" Six #5 8"x29" verts spaced 5" ' IR E PLINTH° o PLINTH o #3 8"x12" hoops spaced #3 8"x12" hoops spaced [7V ° 1 3" for 2 spaces and 6" 1'--4" ° ° 1'-4" 3" for 2 spaces and. 6" thereafter. thereafter. 1 —2� 2 Four—Bolt Thrust Channel Four—Bolt Thrust Channel Four i" dia x 18" rain Four J" dia x 18" min Anchor bolts, 3 projection Anchor bolts, 3 projection Fros Wall PLINTH #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. Four—Bolt Thrust Channel Four i" dia x 18" min Anchor bolts, 3" projection #5 cane bars ties plinth to floor 3" cover. FOOTING 54"x48"x12 conc footing with four #5 x48"rebar spaced 8" long way, and four #5x42" spaced 10" short way with 6" bottom cover. six #5 8"x29" verts spaced 5" F3C SECTION Four—Bolt Thrust Channel, Four" Scale 112"=1 ft dia x 18" min Anchor bolts, 3" pro lection Seal Air Boundary Fros Wall PLINTH #3 8"x12" hoops spaced 3" for 2 spaces and 6" thereafter. Four—Bolt Thrust Channel Four J" dia x 18" min Anchor bolts, 3" projection #5 cane bars ties plinth to floor 3" cover. FOOT1 NG 54"x48"x12 conc footing with four #5 x48"rebar spaced long way, and four #5x42" spa 10" short way with 6" bottom cover. six #5 8"x29" verts spaced 5" m LA o C Cd O �-+ �V, 1 d I (A 00 CDS' U O O 00 = S � z ° Pq BAR 0 5�� W yp�w logMA�I�r� q� W C/ r 29896 SSIONAL �,4 W L It 0 �rn LLI ro�� X a� mC � rn LL T co BAR 0 5�� W yp�w logMA�I�r� q� W C/ r 29896 SSIONAL �,4