Office Drawings 3Building Identification: STAR Job 16--B--78516 Building Size:60x40x18, 1.5:12 pitch roof -- 8556 total ft'2. Building Risk Cat ll, Construction Type VB, no sprinklers Occupancy: B & S1 (Business & Vehicle Parts), No separation required. Occupancy Density 100 Ft" 2/occupant, Occupant load 13 people per Chapter 10, Requires 1 exit, max travel 200 feet. provided 1 egress routes travel distance less than 100 feet Size Restrictions: Table 506.2 - 17500 ft"2, without setback increases, Section 903.2.9.1 12.000 ft" 2 Notes: This project builds a new Office and warehouse for storage of automotive parts. The building will be a pre-engineered building from Star Building Systems, supported on a reinforced concrete foundations, The building will be single story with a mezzanine. Plans Site plan by others NREC Fully conditioned Buildinng R25+R11ci for roof, R13+R10cl Walls, R10 foundation. Doors U<-0.37 (swing) U<= 0.34 OHD Windows U<=0.40 Vapor Barriers shall be installed on the heated side with sealed joints and openings, All weather barriers shall be sealed and or caulked consistent with industry good practice. Air leak test required, Air boundary surface =8400 SF. Lighting Design build by others, Lighting wattage is limited as listed am sheet 6. Electrician to respect day light zones for switching and lumunalre placement. LOADS: Snow: Pf=25 PSF Wind: 85MPH, Exposure C, ht=20ft, Partially Enclosed, Kz=1.0, Kt=1.0, qs=18.5. PSF Iw=1.0 Seismic: Cs= 0.13, Ss=..479, S1=.147, Sds=.453 Sd1=.216, Fa=1.415, Fv-2.213, R=3.5 (OSMF) Rho=1.0 Dead for steel building 5 PSF, dead for wood walls 15 PSF. Soil: 1500 PSF vertical bearing. Materials: Steel Building: See steel building submittal Concrete: Fc"=3000 Rebar: ASTM A615 grade 60 except #3 hoops may be Grade 40, use ASTM A706 rebar for oil welded applications. Anchor Bolts: ASTM A307 or ASTM A36 or better threaded Rod with Nuts, or J -Bolts, QUALITY ASSURANCE: 1. The owner shall retain on Inspection Service independent from the building contractor. The Inspection Service shall be responsible for performing inspections when ordred by the contractor, collecting quality assuance documents, and certifing complonce with the plans and specifications. 2. See below for inspection points. 3. The inspections conducted the building official will satisfy the those Items usually inspected by the building offlicial. The building official shall designate those Items that will be inspected by the building official. 4. The contractor shall ensure that all inspections are performed and are satisfactory before work is covered. Work covered before it con be certified satisfactory may be ordered to be opened for inspection at the contractor's expense. Items that are designated unsatisfactory shall be corrected at the contractor's expense. Special Inspections: 1. Statement of Special Inspection: Special inspection beyond that normally inspected in the sequence of construction by the building offical is required for following: High -Strength Bolts - A325 pretensioning for Building Main Frames connections. Seismic Resistance -Wind Resistance - No special inspection required for wind and seismic beyond those normally provided by the building official. Contents: Floor Plan A1.1 Mezzanine Floor Plan A1.2 Room Schedule A1.3 ADA Details A1.4 Elevations A2.1 Foundation Plan S1.1 Foundation Details S1.2, Floor Structural S1.4 Wall Framing Line 2 S2.1 Wall Assembly Sections S2.2 Mezzanine Framing S3.1 Mezzanine Subfloor S3.2 Main Floor Lighting Plan E1.1 Mezzanine Lighting Plan E1.2 Plumbing M1.1 DOAS M2.1 -P �I e, - a, LD s aD WfUQ 0i Q L1 �aL �A d of2:IY � � 0) U-) & A2.2 �:: ZI*_ S1.3 p U & S2.3 CL 0 z Lu LLA0 5 �c m 0) 00 >1�co ti � U i~ oM CO UJ N 00 M O CD 8 2019 D SOUTH ELEVATION B A Scale 118"=1 ft 1.5 121 1iI�I i +I�li�•I, i �' I� i'• l iE '�' f I I `jEE�� A NORTH ELEVATION B Lu Scale 118 t'=1 ft � � �_; 'I; IjE t',; �I1 II �1.; I €.�i { .-.;•� E .;I,� �.' � � I ,` nonmCD I.A.. T �! `i � I�� ! F I '! I 311 11 Ii13 , I r II -E �!!'31i� tti I'i ,tI III ! I I I�I • � t � I I ? ti t I, I I y I I � i � ;�� E ' ! I ! , t q t I!lii�l m CD (ILI MAR _Q 8 2019 i Lu j CO CO LU m o >'2 C) w �o in • �' nonmCD I.A.. T �! `i MAR _Q 8 2019 i FOUNDATION PLAN Scale 3116"=1 ft n all ire n cu oc Ln d -5;- ) L 0) LO 0) O U co (4- Cl - Fl CL +Cl- CL p z � pq 0 W LU t7 ' 00 Quo CY oco N ti aco L m d C) LU o (D �- MAR P �4Z, cn d m �3 m ra �0i b N d >� I LO (OU d O U q0 = y_ 00 G-- _Q �- � O z z (D ��o XM CO mw �� a) 0� �� MAR 0 8 2019 �������� °y r t� 29896 LQ I AL F2 PLAN VIEW F4�B PLAN VIEW F5B PLAN VIEW Scale 314"=1 ft #4 24x24 CORNER BARS Scale 112"=1 ft 6J" 2'-9J" Scale 112"=1 ft FOOTING FOOTING 24"x24"x12 cone foatin 2----I 48"x48"x12 conc footing, with Four 9 Four-Bolt Thrust Channel with two 4 rebar spaced #4x42" rebar spaced 8" and 6" # p Four J" dia x 20" min Anchor 8" and $" bottom Cover a bottom Caver;� both ways. bolts, 3" projection 1'--4" both ways. Six #5 8x29 verts spaced 7 Six .�5 8"x29" verts inches �, PLINTH spaced 5 Two #3 8"x16" hoops spaced 3" PLINTH - ° for 2 spaces and 6" thereafter. � W. #3 8"x12" hoops spaced FOOTING �� Four-Bolt Thrust Channel 60"x60"x12 conc footing, with 3 for 2 spaces and 6 Four i" dia x 18" min Anchor Four #5x54" rebar spaced 12" thereafter. 1' bolts, 3" projection and 6" bottom Cover both ways. Six #5 i3"x29" verts. Four-bolt Thrust Channel spaced 6 inches Four J" dia x 18" min 1'-4" Anchor bolts, 3" projectio F3 PLAN VIEW F4�A PLAN VIEW F5A PLAN VIEW Scale 314"M1 ft 54" Scale 112"=1 ft Scale 112"=1 fLID t FOOTING Four--Bolt Thrust Channel 48"x48"x12 conc footing, with Four �" dia x 18" min Anchor Four #4x42" rebar spaced 8" and bolts, 3" projection FOOTING o ° 6" bottom Cover both ways. 1 -2 Six #5 8"x29" verts spaced 7 36"x36"x12 cant footing ° ° inches nominal. PLINTH with four #4x30"rebar #4 24x2 #3 8"x16" hoops spaced 3" spaced 6" and 6" bottom 1'-101" PL.INTH CORNER ARS for 2 spaces and B Cover both ways. Three #3 8"x16" hoops spaced 3" thereafter. ° Six #5 8"x29" vents for 2 spaces and 6" thereafter. ° FOOTING PLINTH 60"x60"x12 conc footing, with #3 $"x12" hoops spaced I _ 5, Four-Bolt Thrust Channel - Four #5x54" rebar spaced 12" 1'-4" 3" for 2 spaces and 6" Four--Bolt Thrust Channel Four J" dia x 18" min Anchor and 6" bottom Cover bath thereafter. Four J" dia x 18" min bolts, 3" projection ways. Six #5 8"x29" vents. Anchor bolts, 3" projection spaced 7 inches Four-Bolt Thrust z F3 SECTION f S AR z F4B SECTION s F5B SECTION VIEW Scale 3!4"=1 ft B DG Channel, Four J' dia x si.z Scale 112"=1 ft S�•z Scale 112"=1 LU ft Four-Bolt Thrust ChanneLIA l -meal Airrz n InIl 18" min Anchor bolts, Four CO Ca T 11 -1 FOOTING J" dia x 20" min Anchor Boundary 3" ra'ection bolts, 3" projection Four-Bolt Thrust Channel Concrete Floor �. �� PLINTH our � dia x 18 min Anchor „ F ' I � bolts, 3" 14 x1b x8 PLINTH Gornpacted G�>'av�l����� projection #3 8"x12" hooja,sj:jsp;aced...N. 3" for 2 spaces! and ;fi" PLINTH Co c Floor • , -' � I' Two �� 8"x16" hoops spaced-3 � Crushed rock or sand thereafter.- ! 3" for 2 spaces and 6" � between footing and floor 9 s, thereafter. I er• i FOOTING .II , �� ��aeted...gravel 36 x36 x12 conc foo#i FOOTING � "` "" '""• "" i l ! g 60"x60' x12 conc footing with with four #4x30" retia 48"x48"x12 conc footing, with � f ---------- � � 1' Four 5x54" rebar spaced 12" spaced 6" and 6" �of'orn Four #4x42" rebar spaced 8" and _ • o. � �, !J and 6" bottom Cover both Dover both ways. 8" bottom Cover both ways. � I + ' (j 3" comp �'fied gravel t ways. Six 5 8x29 veru. • �� Six 5 8"x29" vents spaced 7 � Six #5 8x29 vents,3z"corn�acte,d # ' inches nominal. • ' ' • • spaced 6 inches cn d m �3 m ra �0i b N d >� I LO (OU d O U q0 = y_ 00 G-- _Q �- � O z z (D ��o XM CO mw �� a) 0� �� MAR 0 8 2019 �������� °y r t� 29896 LQ I AL F2 PLAN VIEW F4�B PLAN VIEW F5B PLAN VIEW Scale 314"=1 ft #4 24x24 CORNER BARS Scale 112"=1 ft 6J" 2'-9J" Scale 112"=1 ft FOOTING FOOTING 24"x24"x12 cone foatin 2----I 48"x48"x12 conc footing, with Four 9 Four-Bolt Thrust Channel with two 4 rebar spaced #4x42" rebar spaced 8" and 6" # p Four J" dia x 20" min Anchor 8" and $" bottom Cover a bottom Caver;� both ways. bolts, 3" projection 1'--4" both ways. Six #5 8x29 verts spaced 7 Six .�5 8"x29" verts inches �, PLINTH spaced 5 Two #3 8"x16" hoops spaced 3" PLINTH - ° for 2 spaces and 6" thereafter. � W. #3 8"x12" hoops spaced FOOTING �� Four-Bolt Thrust Channel 60"x60"x12 conc footing, with 3 for 2 spaces and 6 Four i" dia x 18" min Anchor Four #5x54" rebar spaced 12" thereafter. 1' bolts, 3" projection and 6" bottom Cover both ways. Six #5 i3"x29" verts. Four-bolt Thrust Channel spaced 6 inches Four J" dia x 18" min 1'-4" Anchor bolts, 3" projectio F3 PLAN VIEW F4�A PLAN VIEW F5A PLAN VIEW Scale 314"M1 ft 54" Scale 112"=1 ft Scale 112"=1 fLID t FOOTING Four--Bolt Thrust Channel 48"x48"x12 conc footing, with Four �" dia x 18" min Anchor Four #4x42" rebar spaced 8" and bolts, 3" projection FOOTING o ° 6" bottom Cover both ways. 1 -2 Six #5 8"x29" verts spaced 7 36"x36"x12 cant footing ° ° inches nominal. PLINTH with four #4x30"rebar #4 24x2 #3 8"x16" hoops spaced 3" spaced 6" and 6" bottom 1'-101" PL.INTH CORNER ARS for 2 spaces and B Cover both ways. Three #3 8"x16" hoops spaced 3" thereafter. ° Six #5 8"x29" vents for 2 spaces and 6" thereafter. ° FOOTING PLINTH 60"x60"x12 conc footing, with #3 $"x12" hoops spaced I _ 5, Four-Bolt Thrust Channel - Four #5x54" rebar spaced 12" 1'-4" 3" for 2 spaces and 6" Four--Bolt Thrust Channel Four J" dia x 18" min Anchor and 6" bottom Cover bath thereafter. Four J" dia x 18" min bolts, 3" projection ways. Six #5 8"x29" vents. Anchor bolts, 3" projection spaced 7 inches Four-Bolt Thrust z F3 SECTION f S AR z F4B SECTION s F5B SECTION VIEW Scale 3!4"=1 ft B DG Channel, Four J' dia x si.z Scale 112"=1 ft S�•z Scale 112"=1 LU ft Four-Bolt Thrust ChanneLIA l -meal Airrz n InIl 18" min Anchor bolts, Four CO Ca T 11 -1 FOOTING J" dia x 20" min Anchor Boundary 3" ra'ection bolts, 3" projection Four-Bolt Thrust Channel Concrete Floor �. �� PLINTH our � dia x 18 min Anchor „ F ' I � bolts, 3" 14 x1b x8 PLINTH Gornpacted G�>'av�l����� projection #3 8"x12" hooja,sj:jsp;aced...N. 3" for 2 spaces! and ;fi" PLINTH Co c Floor • , -' � I' Two �� 8"x16" hoops spaced-3 � Crushed rock or sand thereafter.- ! 3" for 2 spaces and 6" � between footing and floor 9 s, thereafter. I er• i FOOTING .II , �� ��aeted...gravel 36 x36 x12 conc foo#i FOOTING � "` "" '""• "" i l ! g 60"x60' x12 conc footing with with four #4x30" retia 48"x48"x12 conc footing, with � f ---------- � � 1' Four 5x54" rebar spaced 12" spaced 6" and 6" �of'orn Four #4x42" rebar spaced 8" and _ • o. � �, !J and 6" bottom Cover both Dover both ways. 8" bottom Cover both ways. � I + ' (j 3" comp �'fied gravel t ways. Six 5 8x29 veru. • �� Six 5 8"x29" vents spaced 7 � Six #5 8x29 vents,3z"corn�acte,d # ' inches nominal. • ' ' • • spaced F2 PLAN VIEW F4B PLAN VIEW I A I F5B PLAN VIEW G, Scale 31411=1 ft #4 24x24 CORNER BARS Scale 1/2"=1 ft -- 62" 2'-9�" Scale 1121'=1 ft r J FOOTING o cn coo FOOTING ~ m ' X 24"x24"x12 cont footing 21 48"x48"x12 conc footing, with Four Ion (1) Four -Bolt Thrust Channel with two 4 rebar spaced # p ,g� #4x42" rebar spaced 8 and 6 Four J" dia x 20° min Anchor $�� and 6 bottom Cover " bottom Cover both ways. bolts, 3" projection 1 -4 both Six #5 8"x29" verts spaced 7 ways. inches Six #5 8"x29" verts spaced 5" R PLINTH Two #3 8"x16" hoops spaced 3" °rr 1 for 2 spaces and 6" thereafter. -` --" --- ---- PLINTH FOOTING #3 8"x12" hoops spacedO Four -Bolt Thrust Channel 60"x60"x12 conc footing, with » 3 for 2 spaces and 6» rrrr Four dia x 18 min Anchor Four 5x54" rebar spaced 12" # P thereafter. 1' bolts, 3" projection and 6" bottom Cover both ways. Six #5 8"x29" verts. Four -Bolt Thrust Channel spaced 6 inches Four J" dia x 18" min 1'-`" Anchor bolts, 3" projectio F3 PLAN VIEW F4A PLAN VIEW F5A PLAN VIEW Scale 3141'=1 ft 5J" Scale 1/211=1 ft FOOTING r Scale 112"=1 ft - Four -Bolt Thrust Channel 48"x48"x12 conc footing, with Four #4x42" rebar spaced 8" and Four J" ldia x 18" min Anchor bolts, 3' projection FOOTING + 6" bottom Cover both ways. 36"x36"x12 conc footing°°Six ° ° A1 #5 8x29 vents spaced 7 PLINTHwith faurfl#4x30" rebar inches nominal. #4 24x2 #3 8"x16" hoops spaced 3" A13' spaced 6 and 6' bottom 1'-103" PLINTH CORNER ARS for 2 spaces and 6Cover both ways. Three 3 8"x16" hoo s s aced 3"thereafter. Six #5 8"x29" vents for 2 paces and 6"pthe thereafter. ° PLINTH 1V-2' FOOTING 3 8x12hoops spaced #"" p p I 3' I Four -Bolt Thrust Channel 60"x60"x12 conc footing, with Four #5x54" rebar spaced 12" 1'-4" 3" for 2 spaces and 6" Four -Bolt Thrust Channel Four J" dia x 18" rain Anchor and 6" bottom Cover both thereafter. Four J" dia x 18" min bolts, 3" projection ways. Six #5 8"x29" verts. Anchor bolts, 3" projection spaced 7 inches i F3 SECTION S' AR Four—Bolt Thrust z F4B SECTION s F5B SECTION VIEW S1.2 Scale 314'1=1 ft B DG Channel, Four „ dia x s1.z Scale 112'1=1 ft S1.2 Scale 11211=1 ft Four -Bolt Thrust Channel Seal Air 18" min Anchor bolts, Four J" dia x 20" min Anchor Boundary 3" Proiection bolts, 3" projection Four -Bolt Thrust Channel Concrete FloorPL ,� Four dia x 18' min Anchor NTH PLINTHCotmpaete'd jGraveI baits, 3" projection 14"x16"x8" u rr 4 #3 8x12 hoops s�Paced' j 1 i € I j=.. 3" for 2 space and {6'. 1 I € I PLINTH I, Floor -- I t : € I I €; thereafter. ;I (� € I h � � 7 I Two #3 8"x16 hoops spaced. l +' r, _ ! € I II 3 for 2 spaces and 6 � � � thereafter. ! . 3 `I :,�. ;,Nr- J Crushed rock or sand between footing 9 and floor- r FOOTING € I I, 36"x36"x12 conc foots .._. with four 4x30" rebs r s, �:: FOOTING I€.FOOTINGi1I. 48 x48 x12 conc footin withr.rr# 9rs I' 1' 60"x60"x12 conc footing, with Four 5xot rebar spaced 12 # p aced 6" and 6 1: Four 4x42' rebar spaced 8" an # p and 6" bottom Cover bath Cover both ways. » » ( 6" bottom Cover both ways. Six #5 811x29" vents spaced 7 l �l. , € # �or{p4Sted gra vel c ways. Six #5 8x29 vents. Six 5 8 x29 vents # 3;, �� r t cornpactecl Gavel i inches nominal. ,-_' ' E r �' / spaced 6 inches P i I I a's o N a � M d -> --) ev ry-4 h Pq C� LU (D'T p a? LU o cn coo ~ m ' X carn Ion (1) MAR P 9 2019 : � �a ""&I yhQ QL d V n 29896 Q SIaNAL �' '4)L ` 8 -INCH FROST ALL SECTION 3 Scale 112"=9 ft Cone Floor 8"x24' Frost wall, Two #5 rebar top and i Bottom, Lap 24" #3 x21" frostwall vert space 10" R10 ridgid board insulation, Provide protective flashing --B -P l / T 0 _ -92 s V C%P21 � 3 A �- 0� O �(U O C to d N U Pq Q) uj w ;00 �L 00 ❑ Cf 0 �I OD ,l LLlOD MQ M �_ C O (' L0 ^LU '^3 LL � VJ - MAR �Dp9 9 OF W 1 29B9b O REGisTEP�� �SSTbtve� ��S FLOOR REINFORCEMENT Note: Use a performance engineered mix design that Scale 118"=1 ft Scale 1"=6" mix proposal for approval by the engineer. Use of D C B M CONTROL JOINT DETAIL SAW—CUT Note: Use a performance engineered mix design that CONTROL JOINT Scale 1"=6" mix proposal for approval by the engineer. Use of 1-1/2" deep, plastisisers, larger aggregate, and protective agents (Per Plan) d Q G G d. j�3"d 1�3" ° -Rebar Middle of slab. ' Use standard 90 degree with 6" extension, 1-1/2" Nominal concrete a a Reba St nds , 6" CONCRETE, e ' Rebar St nds 1-1/2 Inch deep saw—cut control joints (W). as 4 u d #4 rebor or larger with hooks as Provides elostomeric sleeve around pipe and conduit shown. " COMPAMI) TOP BASE f' e 3" COMPACTED ROAD EASE ;• I I COMPACTED NATIVE FILL Note: Use a performance engineered mix design that has low shrinkage and moderate strength. Submitt 6"Thick Nominal mix proposal for approval by the engineer. Use of concrete slab, plastisisers, larger aggregate, and protective agents such as Spray lock can be part of the proposal. Use minimum 18" development extensions 4" minimum Thick Use standard 90 degree with 6" extension, 1-1/2" Nominal concrete bend radius for perpendicular terminations. slab 1-1/2 Inch deep saw—cut control joints (W). as shown. #4 rebor or larger with hooks as Provides elostomeric sleeve around pipe and conduit shown. penetrations c I `NOTES 1. Use 1"x8" expansion bolts spaced 48" to fasten base plate to concrete floor 2. Nail Base plate to subfloor with 12d spaced 12" for the mezzanine level wall. 3. 2x8 pressure treated base plate, with corrosion resistant fasteners 4. 2x8 studs spaced 16", full bearing capable. 5. Fasten Top plate to building floor girder or rafter with suitable J" self—tapping screw 6. Sheet with 1/2 " Gypsum Wall Board, standard attachment with screws or nails 7. Headers 2x6 box headers. 8. Jambs— one king stud and one trimmer. 9. Provide 2x10 blocking for stair rail attachment, I— STAIR WELL FRAMING Lop plates at Scale 114"=1 ft '^ Ang I Ballon Framed wall, 2x4,2xl 01 spaced 2x4 stringer I •support, to walls, withdirect bear pony studs CN 1-40 l� cu _Q (kJ Q (kJ �LL_ N Co Iy N r- IZ Uj W �rn �01) LLJ XxN�00 M FO 00 LL, ooq c � �Q of Q_(0 - Scale 112"=1 ft 150E-125-30 Furring Channel, fasten to purlins spaced 24", fasten with #10xi" teks. R25 plus R11 liner system,Sheet Ceiling with gypsum wall board (GWS), Attach with #6 self drilling screwE spaced 8", Tape, Texture, & Paint. 2x8 top plate fasten to steel rafter with sutable i" self tapping screws. 2x8 studs spaced 16", Nail to top and bottom plates with three 16d per standard nailing table (IBC 2304.10.1) Insulate R28, with vapor barrier on mezzanine side, Sheet with GWB, Tape Texture & Paint. LF -7-74- 0 _. e 2x8 Presuure Treated base plate Seal base of wall with suitable cell seal. Air envelope tightness test required. Fasten base plate to concrete floor with 1/2x8" expansion bolts spaced 48". R25 plus R11 liner system, 2x8 Base plate fasten to sub floor with two 12d nail spaced 16" Attach 1-1/8" sub floor to steel joists and floor girders with suitable i self tapping screw. 087125-30 furring channels spaced 24", Attached floor joists with two self drilling and tapping screws to each floor joist. Sheet ceiling with GWB, Attach with #6 self drilling screws spaced 8 11, Tape, Texture, & Paint. 2x8 top plate fasten to steel Floor Girder with suitable X" self tapping screws. 2x8 studs spaced 16", Nail to top and bottom plates with three 16d per standard nailing table (IBC 2304.10.1) Insulate R28, with vapor barrier on Office side, Sheet with GWB, Tape Texture & Paint. PPORT MID -SPAN DETAIL Scale 1"=1 ft 2x4 stringer support. fasten to wall studs and provide direct bearing pony stud at top of stringer and mid span. Knotch stringers to seat to \ stringer support. e� svoq °Z , "- 0 O 2 WALL SECTION STAIR s2.2Scale 112"=1 ft 1-11 e STAIR RM 151 Scale 112"=1 ft 0 Fasten and str block t wall stu 2x4 to grid Balloon Frame stair wall to optimize barrier wall strength Three 2x12 stair stringers 2x6 stringer block Fosten stringer and stringer 3 block to stair wall studs and to grid 2 wall studs with two #9x4-1/2" structural screws at each stud Cover under stair ceiling and walls with i GWB, tape texture point UNDERSTAIR 2x4 stringer support. fasten to wolf studs and provide direct bearing pony stud at top of stringer and mid span. knotch stringers to seat to stringer support. Trim and seal wall to floor, Air envelope tightness test required 150E-125-30 Furring Channel, fasten to Floor Joists spaced 24", fasten with #10xJ" teks. Optional Insulation. Sheet Ceiling with gypsum wall board (GWB), Attach with #6 self drilling screws spaced 8", Tape, Texture, & Paint. Trim and seal wall to floor, Air envelope tightness test required rn 0 0� o � to N co a� N U) s 3 9 C5P3 U1 I-- PQ `PQ � OD ❑ o M m w a) °° X M CO o W �, Co O� �Q CL r 0) `. MAR 0 8 2019 150E-125-30 Furring Channel, fasten to purlins spaced 24", stringer fasten with #10xi" teks. install inger R25 plus R11 liner system, Sheet o stair Ceiling with gypsum wall board ds and (GWB), Attach with #6 self drilling 2 wall studs w ith two screws spaced 8", Tape, Texture, stringer support #9x4-1 /2" & Paint. structural screws at each stud Direct 150E-125-30 Furring Channel, bearing fasten to girts spaced 24", pony stud fasten with #10xi" teks. Install R25 plus R11 liner system, Sheet Walls with gypsum wall board (GWB), Attach with #6 self drilling screws spaced 8", Tape, Texture, & Paint. Three 2x12 stair stringers 2x6 stringer block Fosten stringer and stringer 3 block to stair wall studs and to grid 2 wall studs with two #9x4-1/2" structural screws at each stud Cover under stair ceiling and walls with i GWB, tape texture point UNDERSTAIR 2x4 stringer support. fasten to wolf studs and provide direct bearing pony stud at top of stringer and mid span. knotch stringers to seat to stringer support. Trim and seal wall to floor, Air envelope tightness test required 150E-125-30 Furring Channel, fasten to Floor Joists spaced 24", fasten with #10xJ" teks. Optional Insulation. Sheet Ceiling with gypsum wall board (GWB), Attach with #6 self drilling screws spaced 8", Tape, Texture, & Paint. Trim and seal wall to floor, Air envelope tightness test required rn 0 0� o � to N co a� N U) s 3 9 C5P3 U1 I-- PQ `PQ � OD ❑ o M m w a) °° X M CO o W �, Co O� �Q CL r 0) `. MAR 0 8 2019 MEZZANINE Scale FRAMING (Taken from Star Dwg E9 sealed 6Dec2018, AD Hurtz PE) a; 33 , ■ ht ceiling SEE STAR DRAWINGSfull FOR CONNECTION DETAILS 2x10 framed landing FramedPLACEMENT 2x4 Stair Wall [` 011. IiInO�F��� 1,. if nII uI uII uII uII 11 1I1h 11 Ii I IuI IuI IuI IiIi uI IuI 211 -nI1I. nr �� p7rni _ rnH�:.n•1 �unV1 �nI �na :.nuII �nII r.^11 �r�.eInnf unI nl NEW �u�ll�„n■ I11 Ll MEZZANINE SUBFLOOR LAYOUT PLAN CN Scale 1/8"=1 ft cs dL > A � co —20' OP 20' �T 11-1/5, subfloar fasten with self d'rill 8c tapping te 1/8 LLb Tf-p r L 9yout J1 I T Set 1-1/8 subfloor with 4" cantilever beyond edge of floor girder. I it :: �: I , , � F3Co ZC', C�, LU M (0 Co a) 00 WU8, -2 Im- X U) Co 0 AwkAi& 0 LU CL (f) I FBAR P 8 2019 .77 L0 CU 0 - U CC) SEE STAR DRAWINGS 2x10 framed landing 2x12 4 - FOR CONNECTION AND stair stringers 0 PLACEMENT DETAILS 2x4 Framed Stair Wall 0 Suitable treads and kick plates Use 1-1/8 subfloor to tie landing framing to main structure -11 U-8 �T 11-1/5, subfloar fasten with self d'rill 8c tapping te 1/8 LLb Tf-p r L 9yout J1 I T Set 1-1/8 subfloor with 4" cantilever beyond edge of floor girder. I it :: �: I , , � F3Co ZC', C�, LU M (0 Co a) 00 WU8, -2 Im- X U) Co 0 AwkAi& 0 LU CL (f) I FBAR P 8 2019 0- 9�_ Commercial Electric 54663141 11.5 W. 800 lumens, occupancy sensor Nicor ACW— 20— 4S—UNV-50K, 39 W, 3800 lumens, occupancy sensor Motion & Light Activated LED —Defiant—DFI-5852—WH — Motion Sensors with electric eye High Bay LED —DIVA LHB-110W—U-50K—D10 — 110 W, 14,410 Lumens, occupancy sensors Light Switch, tied to occupancy sensors m to CD 0 N L C5 Na: 1 D On CRU O U 00 _ c+ 0 .4 r) O r- Pq WAR 0 8 2019 W Q) C:, LU o Co CoOD wN' a °O rn O�Q 0 CL r cry WAR 0 8 2019 20' 20' D T-- BA20'20' 20' Nicor ACW-20-45—UNV-50K, 39 W, 3800 lumens, occupancy sensor Light Switch, tied to occupancy sensors -P Rj 0 W C5 P:) L 3 A F- Oti Ut o 0 Ln L d 0) Ln -C d' O U CD MEZZANINE LIGHTING PLANCi of Scale3116"=1 ft full ht ! ceiling RM 150 oo AR MM0 W M 1,51] D(w 0—� Q a��L EXIT El 2A Mezzanine RM 2ao All 1111111 �1 Nicor ACW-20-45—UNV-50K, 39 W, 3800 lumens, occupancy sensor Light Switch, tied to occupancy sensors -P Rj 0 W C5 P:) L 3 A F- Oti Ut o 0 Ln L d 0) Ln -C d' O U CD Z ! L CO oo X� �N L �, CO MM0 W Ca 0—� Q a��L MAR P 8 2019 I1I4 ABs IE -16.5' V Lel H ad dmin Ilse 6nmeh N . dA n DRAIN PLAN c B A Scale 118"=1 ft T T T .j i Sewer Per RB O Engineering NISX 111,—��FFICE � I� OFFICE C Counter OFFICE CONFERENCE LOCKER Rm D Potable Water Iso Water lines V3 v gold no scale route around HW1 Column IOn Mazz 'i - Grid 2 ln. Fh Hol ater line4th about 12 <43ft,c not required late Hot water HB1ith minimum"thick pipeation suitable for use up to 20OF To Water Supply per RB Engineering WC1 ..1d . DRAIN ISO no scale a� Wall at Grid D Clean out ABS IE sie— Fl— Penekatlon Though Frost wall " """" -- —1. k" vent WC1 3` ABS �� lE 3" vent to roof Vent routes around Floor beam. Grid 2 Vt o 0 CJ N2- I �� V � J In 44 E CU © U :1ECl- �D -Q Z � I, - Potable LU LLJ It 00 water source Do o LLJ 1— 0 coo XXM � ro •�M O W >,eo per RB O� Z3Q IL r U) Engineering to sewer per RB Engineering PLUMBING SCHEDULE Ivrs FIXTURES Discription WFSU DFU VENT TRAP COLD H T Comment FD1 FD NA 2 2" 2" NA NA trop prime from toilet HB1 Hose Bib 3 NA NA NA 1/2 1/2 Frost Free HW1 Hot water NA/3 NA NA NA 1/2 1/2 Hot water— 20 go] electric L1 Lavatory 1 1 1-1/4 1-1/4 1/2 1/2 Proximity Valves WC1 Toilet 2.5 6 2" NA 1/2 NA Proximity Valve Anti—syphon fill valve V1 Water Isolation 3/4 Gate Valve V2 Hot Water isolation Gate valve or Ball valve V3 Hot Water Supply 1/2 Gate valve or Ball valve TOTALS 6.5 7 sie— Fl— Penekatlon Though Frost wall " """" -- —1. k" vent WC1 3` ABS �� lE 3" vent to roof Vent routes around Floor beam. Grid 2 Vt o 0 CJ N2- I �� V � J In 44 E CU © U :1ECl- �D -Q Z � I, - MAR 0 9 7019 LU LLJ It 00 Do o LLJ 1— 0 coo XXM � ro •�M O W >,eo O� Z3Q IL r U) MAR 0 9 7019 DEDICATED OUTSIDE AIR SUPPLY Scale 118"=1 fl D Similar DISCHARGE AIR NM . T T System Description— This system provide minimum fresh air for four spaces based on the Washington Ventilation Code. These spaces are: Room 100 (hall), Room 110 (retail), Room 150 (warehouse), and Room 200 (mezzanine). This system has an inlet and discharged damper and four discharge fans, one for each space. The DOAS system is activated when the room lights are on. The electrician can best decide how to provide this function. In the office space, any one of the rooms with a light on should turn the discharge fan on. Specific fan selection and dampers will be by the mechanical contractor. These fans must be: Low sone, Flow capacities at or near above that specified Durable and reliable— 2—year warrantee System commissioning will included verifying fan and damper operation and that air flows are at or very near those specified. Ducting was intended to be standard metal duct. Lay out can be as best fits the building, but supply and discharge need to be separated sufficient to assure air mixing with the whole room. The equipment was Intended to be mounted in the mezzanine space with ducts routed to the respective rooms. DOAS SYSTEM HVAC SYSTEM— Design Build Respect the following limits: Heading loads were determined to be 17,800 BTUs/hr Cooling Loads 22,850 BTUs Select equipment with rated performance near these values. Provided incomplete WEC Forms Fan Door test required— 336 CFM max. IOAS SUPPLY SIR F1 Rm 100 Exhaust DOAS 6" 120VAC 100 CFM Fan ON with room lights F2 Rm 110 Exhaust DOAS 6" 120VAC SO CFM Fan ON with room lights F3 Rm 150 Exhaust DOAS 4" 120VAC 53 CFM Fan ON with room lights F4 Rm 200 Exhaust DORS 8" 120VAC 140 CFM Fan ON with room lights D1 Motorized Damper 12" M 120VAC Damper OPEN if D2 is open, Supply Air D2 Motorized Damper 12" 120VAC Damper OPEN if any fan on, Discharge Air Motorized dampers are part of the air boundary and must have low leakage sufficient to pass the fan—door test. 5, - 0 4 C$m L 3 A I— ON -- 4 U, .- o -C CD 0 W s.. d r` Pq MAR 0 8 2019 W rn O 0) o 00 00 OD 2 M X N O LL, °° LU O ( o 0 d,fn� MAR 0 8 2019