R1 Bldg 513R1
06Apr '16
Erection Guide
FIELD SERVICE PROCEDURES
SHORT MATERIALS
DAMAGED OR DEFECTIVE MATERIAL
OIL CANNING IS NOT CAUSE FOR REJECTION
EXCESSIVE MATERIAL
INITIAL CLAIM
AUTHORIZATION FOR CORRECTIVE WORK
FINAL CLAIM
THE "FINAL CLAIM" MUST INCLUDE:
** IMPORTANT NOTE **
SHIPMENT ARRIVAL TIME
UNLOADING, HANDLING, AND STORING MATERIALS
STRUCTURAL
NOTE: PIECE MARKS ARE STENCILED ON PRIMARY STRUCTURAL MEMBERS AT LOWER
END, 1'-0" FROM END. INSPECT ALL SHIPMENTS PRIOR TO RELEASING THE TIE-DOWNS
FOR LOADS THAT MAY HAVE SHIFTED DURING TRANSIT!
REMEMBER, SAFETY FIRST!
TEMPORARY SUPPORTS
ROOF AND WALL PANELS
UNDER NO CIRCUMSTANCES SHOULD PANELS BE HANDLED ROUGHLY
CAUTION:
DAMAGE DURING CONSTRUCTION
TYPES OF FINISHES
SHOP PRIMED STEEL
GALVALUME
PRE-PAINTED
PAINT AND COATING MAINTENANCE
DAMAGE FROM CONDENSATION OR TRAPPED WATER SAFETY COMMITMENT
ICE AND SNOW REMOVAL
DEBRIS REMOVAL
PERIODIC INSPECTION
DRAINAGE
ROOF MAINTENANCE GUIDELINES
FOOT TRAFFIC
DISSIMILAR METALS
R1-01 R1-02 R1-03 R1-04 R1-05
R1-06 R1-07 R1-08 R1-09