Loading...
Peer Review ltr Preliminary Storm 8730 Tallon Lane NE, Suite 200  Lacey, WA 98516  Office 360.352.1465  Fax 360.352.1509  scjalliance.com July 20, 2018 Tami Merriman, Associate Planner City of Yelm Community and Economic Development Department 105 Yelm Avenue West Yelm, WA 98597 Re: Peer Review – NPR Recycling SCJ Project No. 0605.05 Task 41 Dear Tami: The City has requested SCJ Alliance to conduct a preliminary peer review of the proposed stormwater management system for the NPR Recycling projecting including a review of the Preliminary plans and Preliminary Drainage Report in accordance with the 2014 Stormwater Management Manual for Western Washington. This review consisted of the following documents: · City of Yelm Administrative Site Plan Review Application · Preliminary Plans dated 6/1/2018 · Preliminary Drainage Report dated June 2018 Review Understanding: Previously, City of Yelm policy was that all storage yard areas that had any possibility of waste, auto’s, or whatever, were to be paved to meet stormwater treatment. In the recent past, there has been a switch that gravel storage be allowed, if it meets the 2014 Stormwater Management Manual for Western Washington (referred to as the stormwater manual for the remainder of this letter). The purpose of this review is to establish whether the proposed design meets the stormwater manual requirements and comment on any changes that are required. The stormwater manual generally defines gravel surfaces as impervious surfaces, therefore the drainage design as provided meets the intent of the stormwater manual. We also made the following observations regarding the drainage design: General Comments 1. Per the plans provided, a bioretention swale is identified but the swale does not meet the minimum requirements for a swale. (e.g. bioretention swales imply longitudinal slopes or a method of conveyance) Please clarify if the design intent is as a bioretention swale or a bioretention cell. The design of the selected facility type then needs to meet the design requirements of the stormwater manual. 2. The project must incorporate BMP T5.13 Post Construction Soil Quality and depth within landscaped areas. July 20, 2018 Page 2 Preliminary Plans 3. Sheet P1.1 – Grading construction note #4 references a v-bottom ditch but appears to callout a pipe in the plan. Preliminary Drainage Report 4. Applicable references, charts and figures within the preliminary drainage report need to reference the 2014 version of the stormwater manual. 5. Document the 6-month, 24-hour rain event can infiltrate through the facility within 48 hours in accordance with SSC-4 of the 2014 stormwater manual. 6. Part 4 - MR #6 is not addressed within the drainage report. 7. Part 5.1 - The detention volumes represented for the proposed facilities is not shown in the WWHM output. Confirm the detention volumes are correct or demonstrate basis of volume calculations. Should you have any questions or comments, please contact me at (360)352-1465 at your earliest convenience. Sincerely, SCJ Alliance Jared VerHey, PE Project Manager N:\Projects\0605 City of Yelm\605-05 Civil Plan Reviews\Phase 41 - NPR Recycling\Correspondence\To\Yelm