2020.0015 Building Engineering Property# 22719331301jFn'5jd PeK)k S Cop.\/ Lateral and Gravity Analysis For NHD 1062-Z Parcel 22719331301 Yelm, WA For Cale Broadwell 2830 Graf Road Centrailia, WA 98531 By N.L. Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98336 360-876-2284 NLO #11081-20 February 2020 Dead Load Determination: Roof: Item Value Unit Source Gypsum Board (5/8 -in thick) 2.75 psf ASCE 7-10, page 399, Table C3-1 Composition 4 psf ASCE 7-10, page 333, Table C3-1 Roofing 2 psf ASCE 7-10, page 332, Table C3-1 (Doubled) Plywood (1/2 -in 2.85 psf Design of Wood Structures 6th Edition, Appendix A thick) 2.4 psf ASCE 7-10, page 399, Table C3-1 Loose Insulation, 6.0 psf p Design of Wood Structures 61h Edition, Appendix B, 12 -in. thick Insulation, Loose 2x12 Roof Rafters 11.05 psf spaced at 16" o c 2'9 psf Design of Wood Structures, 6`h Edition, Appendix A Total 16.05 psf Total Rounded Up 17 psf Floor: Item Value Unit Source Plywood (3/4 -in thick) 2.4 psf ASCE 7-10, page 332, Table C3-1 Hardwood Flooring 4 psf ASCE 7-10, page 333, Table C3-1 Weight of 2x12 Joists 2.85 psf Design of Wood Structures 6th Edition, Appendix A Expanded Polystyrene, 9 -in. 1.8 psf Design of Wood Structures 6th Edition, Appendix B, thick Insulation, Expanded Polystyrene Total 11.05 psf Total Rounded Up 12 psf Siding: Item Value Unit Source 2 x 6 @ 16 -in., 5/8 - in. gypsum, insulated, 3/8 -in. 12 psf ASCE 7-10, page 333, TableC3-1 siding Subtract 1/8 -in gypsum -0.55 psf ASCE 7-10, page 332, Table C3-1 Add 1/8 -in. plywood siding 0.4 psf ASCE 7-10, page 332, Table C3-1 Windows, glass, frame, and sash 8 psf p ASCE 7-10, a page 333, Table C3-1 Total 11.85 psf Total Rounded Up 12 psf Live Load Determination: Item Value Unit Source Floor Live Loads 40 psf IBC 2015, Table 1607.1, Residential under "AII other areas' Roof Live Load 20 psf IBC 2015, Table 1607.1, Roofs under'AII other construction" Floor Live Loads: 40 psf Roof Live Load(s): 20 psf Snow Load Determination: Item Value Unit Source C_e 1.0 ASCE 7-10, page 24, Table 7-2 under "Terrain Category B, Partially Exposed" C_t 1.0 ASCE 7-10, page 24, Table 7-3 under "All structures except as indicated below" I_s 1.00 ASCE 7-10, page 4, Table 1.5-2 under "Risk Category II" C_s 1 ASCE 7-10, page 36, Figure 7.2a, Roof Slope 5 on 12 p_g 30 psf p_f 25 psf p s 25 psf p_m psf Flat Roof Balanced Snow Load: 2S psf NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 96366 (360) 876-2264 Multiple Wood Beam Project Title: NHD 1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Printed. 13 FEB 19, Second Floor Joists - - -- - -- 12'04PM Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 using Load Kesistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: Hem Fir Wood Grade: No.2 Flo - Compr Fib- Tension 850.0 psi Fc - Prll 13000 psi Fv 150.0 psi Ebend- xx 1,300.0 ksi Density 26.830 pcf 850.0 psi Fc - Perp , . 405.0 psi Ft 525.0 psi Eminbend - xx 470.0 ksi Applied Loads Total Downward Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft, Trib= 1.333 It Desian Summary Unif Load: D = Max fb/Fb Ratio = 0.447; 1 fb : Actual: Fb : Allowable: 867.52 psi at 6.500 ft in Span # 1 1,942.49 psi Load Comb: +1.20D+0.50Lr+1.60L+1.60H Max fv/FvRatio = 0.208: 1 fv : Actual : F 53.80 psi at 0.000 It in Span # 1 D(0.0160),L(0 05332) A 2xt2 13.0 k C- .Allowable . 259.20 psi Load Comb: +1.20D+0.50Lr+1.60L+1.60H Max Reactions (k) D L Lr S W E H Left Support 0.12 0.35 Right Support 0.12 0.35 Wood Beam Design : Second Floor North Beam i2-11 I ransient Downward 0.149 in Ratio 1047 LC: L Only Transient Upward 0.000 in Ratio 9999 LC: Total Downward 0202 in Ratio 771 LC:+D+L+H Total Upward 0.000 in Ratio 9999 LC: Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: Hem Fir Wood Grade: No.2 Fb -Tension 850 psi Fc - Prll 1300 psi Fv 150 psi Ebend- xx 1300 ksi Density 26.83 pcf Flo - Compr 850 psi Fc - Perp 405 psi Ft 525 psi Eminbend - xx 470 ksi Applied Loads Total Downward Beam self weigh( calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft, Trib= 5.458 f( Unif Load: D = 0.0120 k/ft, Trib= 8.0 ft Unit Load: D = 0.0170, Lr = 0.020, S = 0.0250 k/ft, Trib= 2.0 ft Design Summary Max fb/Fb Ratio = 0.870; 1 It, : Actual : Fb : Allowable: 1,404.84 psf at 5.290 It in Span # 1 1,615.68 psi Load Comb: +1.20D+1.60L+0.50S+1.60H Max fv/FvRatio = 0.397: 1 fv : Actual : 102.91 psi at 0.000 It in Span # 1 Fv : Allowable: 259.20 psi Load Comb: +1.20D+1.60L+0.505+1.60H Max Reactions (k) D L Lr S w E Left Support 1.07 1.15 0.21 0.26 Right Support 1.07 1.15 0.21 0.26 • re e e?.-wa r r r s a :r H Transient Downward 0.115 in Total Downward 0.221 in Ratio 1107 Ratio 574 LC: L Only LC: +D+L+H Transient Upward 0.000 in Total Upward 0.000 in Ratio 9999 Ratio 9999 LC LC: NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 (360) 876-2284 Wood Beam Design Second Floor North Beam i2-21 Project Title: NHD 1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Calculations per NDS 2015, IBC CBC 2016, ASCE 7-10 usmg Loac Nesistance t -actor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species : DF/DF Wood Grade: 24F - V4 Fb - Tension 2,400.0 psi Fc - Prll 1,650.0 psi Fv 265.0 psi Ebend- xx 1,800.0 ksi Density 31.20 pcf Fb-Compr 1,850.0 psi Fc - Perp 650.0 psi Ft 1,100.0 psi Eminbend -xx 950.0 ksi Applied Loads Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 kill, Trib= 1.333 ft Unit Load: D = 0.0170, Lr = 0.020, S = 0,0250 k/ft, 0.0 to 4.708 it, Trib=13.0 ft Unif Load: D = 0.0120 k/fl, 0.0 to 4.708 ft, Trib= 8.0 ft Point: D=1.070, Lr = 0.210, L=1.150, S = 0.260 k @ 4.875 ft Point: E = -3.336 k @ 0.250 If Point: D=1.410, Lr=0.260, L=1.60, 5=0.320, E=2.160k@0,250It D S esran ummary 115.15 psi --------- Max fb/Fb Ratio = 0.473. 1 o(o,zvn)_4f{b�a(o az X01 Po : Actual : 1,960.18 psi at 4.897 ft in Span # 1 Dto:oleo L 0.05332 ------- Fb : Allowable : 4,147.20 psi __ Load Comb: +1.20D+1.601 -+0.50S+1.601 s 5x11.25 Max fv/FvRatio = 0 251 : 1 41 tv : Actual : 115.15 psi at 0.000 It in Span # 1 I• Fv: Allowable: 457.92 psi 9999 = 0.842. 1 LC: Load Comb: +1.200+0.50L+1.605+1.60H M. Max Reactions (k) D L Lr S W E H Left Support 3.62 2.78 1.44 1.79 -1.16 Right Support 0.81 0.80 0.25 0.32 -0.02 Wood Beam Design : Second Floor South Beam f2-31 15.630 ft Transient Downward 0.182 in Ratio 1033 LC L Only Transient Upward -0.007 in Ratio 9999 LC E Only Total Downward 0.436 in Ratio 430 .C:+D+0.750L+0.750S+H Unit Load: D = 0.0120, Total Upward 0.000 in Ratio 9999 = 0.842. 1 LC: BEAM Size : Sawn Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7.10 6x12, , Fully Braced Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: Hem Fir Wood Grade : NoA Fb- Tension 975.0 psi Fc -Prll 1,350.0 psi Fv 150.0 psi Ebend-xx 1,500.0 ksi Density 26.830 pcf Fb - Compr 975.0 psi Fc - Perp 405.0 psi Ft 625.0 psi Eminbend - xx 550.0 ksi Applied Loads Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft Trib= 8.875 It Design Summary Max fb/Fb Ratio = 0.842. 1 fb : Actual : 1,419.05 psi at 6.355 ft in Span # 1 Fb : Allowable : 1,684.80 psi Load Comb: +1.20D+0.50Lr+1.601-+1.601-1 Max fv/FvRatio = 0.352: 1 fv : Actual : 91.30 psi at 0.000 ft in Span # 1 Fv: Allowable: 259.20 psi Load Comb: +1.20D+0.5OLr+1.60L+1.60H Max Reactions (k) D L Lr S W E Left Support 0.75 2.26 Right Support 0.75 2.26 D(0.1065) 1-(0.3550 6x12 A 12.710 ft Maz Deflections H Transient Downward 0.200 in Total Downward 0.267 in Ratio 761 Ratio 570 LC L Only Transient Upward 0.000 in Ratio 9999 LC: LC +D+L+H Total Upward 0.000 in Ratio 9999 LC: NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 (360) 876-2284 Beam Beam Design : Second Floor South Beam f2-51 Project Title: NHD1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Calculations per NDS Printed. 13 FEB 2020, 12 04PM , IBC 2015, CBC 2016, ASCE 7.10 Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: Hem Fir Wood Grade: N0.2 Flo -Tension 850.0 psi Fc - PHI 1,300.0 psi Fv 150.0 psi Ebend-xx 1,300.0 ksi Density 26.830 pcf Fb - Compr 850.0 psi Fc - Perp 405.0 psi Ft 525.0 psi Eminbend - xx 470.0 ksi Applied Loads Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft, Trib=1.333 ft Unit Load: D = 0,0170, Lr = 0.020, S = 0.0250 k/ft, 7.417 to 8.958 If, Trib= 10.50 If Point: D=0.380, Lr = 0.090, L=0,350, S = 0.10, E =1.510 k @ 7.250 ft D S esron ummary Max fb/Fb Ratio = 0.316. 1 0.064 in D(0 178 Lr D 0.0160 L 0.05332 ) (0.2101 5(0.2625) fb : Actual : 638.40 psi at 7.226 It In Span # 1 - B0.750L+0.750S+0.5250E Fb: Allowable: 2,019.60 psi Total Upward 0.000 in Load Comb: +1.388D+0.50L+0.70S+E+1,60H 9999 LC: Max fv/FvRatio = 0.266: 1 4 4.12 F : AOual : 86.30 psi at 8.032 ft in Span # 1 F 8.958 ft - v: owa e . 324.00 psi Load Comb: +1.388D+0.50L+0.705+E+1.60H Max De lectin Max Reactions (k) D L Lr S w E H Transient Left Support 0.20 0.31 0.04 0.05 0.29 Ratio Right Support 0.66 0.52 0.37 0.45 1.22 Wood Beam Design : Second Floor South Beam f2-61 Transient Upward Ratio rd 0.040 in Total Downward 0.064 in 2662 Ratio 1668 LC: E Only B0.750L+0.750S+0.5250E -- - - --- - --_- ,w - _-- 0.000 in Total Upward 0.000 in 9999 Ratio 9999 LC: 0 193: 1 LC: Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: DF/DF Wood Grade : 24F - V4 Fb - Tension 2,400.0 psi Fc - PHI 1,650.0 psi Fv 265.0 psi Ebend- xx 1,800.0 ksi Density 31.20 pcf Fb - Compr 1,850.0 psi Fc - Perp 650.0 psi Ft 1,100.0 psi Eminbend - xx 950.0 ksi Applied Loads Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft, 0.0 it to 13.50 It, Trib= 4.708 ft Unit Load: D = 0.0170, Lr = 0.020, S = 0.0250 k/ft, 0.0 to 13.50 ft, Trib= 2.0 it Unit Load: D = 0.0120 k/ft, 0.0 to 13.50 fl, Trib= 8.0 ft Point: E = -3260 k @ 0.5833 it Point: E = -3.260 k @ 10.625 It Point: D = 0.660, Lr = 0.370, L = 0.520, S = 0.450, E = 3.260 k @ 13.375 ft Point: E = 3.260 k @ 2.875 It Desrpn Summary Total Downward 0.453 in Max fb/Fb Ratio = 0.384. 1 r taramaea>, to : Actual : 1,561.72 psf at 9.69011 in Span # 1 -- - - --- - --_- ,w - _-- Fb: Allowable: 4,067.65 psi - Load Comb: +1.20D+1.60L+0.505+1.60H 5sx15 Max fv/FvRatio = 0 193: 1 LC: fv : Actual, 88.21 psi at 0.000 It in Span # 1 --- - Fv: Allowable: 457.92 psi Load Comb : +1.20D+1.60L+0.50S+1.60H Ma Max Reactions (k) D L l r S W E H Left Support 1.99 1.79 0.46 0.57 -0.87 Right Support 1.53 1.27 0.45 0.56 0.87 19.0 ft x Defections Transient Downward 0.198 in Total Downward 0.453 in Ratio 1152 Ratio 503 LC: L Only ~0.7501-+0.750S+0.5250E Transient Upward -0.046 in Total Upward 0.000 in Ratio 4998 Ratio 9999 LC: E Only" -1.0 LC: NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 (360) 876-2284 Simple Beam Project Title: NHD 1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Printed 13 FEB 2020, 12 04P Wood Beam Design : Second Floor East Beam j2-71 -- 11.790 a Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 BEAM Size. 5.5x11.25, GLB, Fully Unbraced - Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending Wood Species: DF/DF Wood Grade: 24F - V4 Fb - Tension 2,400.0 psi Fc - Prll 1,650.0 psi Fv Fb-Compr 1,850.0 psi Fc - Perp 650.0 Ft 265.0 psi Ebend- xx 1,800.0 ksi Density 31.20 pcf 1;100.0 psi psi Eminbend -xx 950.0 ksi Applied Loads Right Support Beam self weight calculated and added to loads Ratio 1256 Ratio Unit Load: D = 0.0120 k/ft, 0.0 it to 9.50 ft, Trib= 8.0 it -0.016 in Unif Load: D = 0.0170, Lr = 0.020, S = 0.0250 k/ft 0.0 to 9.50 it, Trib= 13.0 it LC: S Only LC: +D+S+H Point: D=0.330, Lr = 0.080, L=0.410, S=0080, E = 0.120 k @ 9.375 ft 9709 DesignSumma ------------- - ___ Maxfb/Fb Ratio = 0.396; 1 fb : Actual: 1,616.22 psi at 5.856 ft in Span # 1 Ratio 9999 Ratio - olo.zzlolrgf(�stp3zso) ___ Fb: Allowable : 4,084.52 psi Design : Second Floor North Beam j2-81 -- - --- -- Load Comb: +1.20D+0.50L+1.605+1.60H Max fv/FvRatio = 0.239:1. ASCE 7-10 ss.11.zs fv : Actual: Fv: Allowable: 109.66 psi at 0.000 ft in Span # 1 457.92 psi 11.790 a Load Comb: +1.20D+0.50L+1.605+1.60H Max De actions Ratio Max Reactions Left Support (k) D L Lr S W E H 1.94 0.08 1.49 1.86 Transient Downward 0.113 in Total Downward 0.235 in Right Support 0.02 1.55 0.33 1.06 1.31 0.10 Ratio 1256 Ratio 602 -0.016 in Total Upward LC: S Only LC: +D+S+H Ratio 9709 Transient Upward 0.000 in Total Upward 0.000 in LC: E Only Ratio 9999 Ratio 9999 pod Beam Design : Second Floor North Beam j2-81 LC: __ LC: Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 BEAM Srze , 5.5x11.25, GLB, Fully Braced-_- _- --- - _---- __ Wood Species: Using Load Resistance Factor Design with IBC 2015 Load Combinations, Major Axis Bending DF/DF Fb - Tension Fle -Compr 2,400.0 psi Fc - Prll 1,650.0 psi Fv 1,850.0 Fe Perp Wood Grade: 24F - V4 265.0 psi Ebend- xx 1,800.0 ksi Density 31.20 pcf psi - 650.0 psi Ft 1,100.0 psi Eminbend -xx 950.0 ksi Applied Loads Beam self weight calculated and added to loads Unit Load: D = 0.0120, L = 0.040 k/ft, Trib= 6.167 it Unit Load: D = 0.0120 k/ft, Trib= 8.0 ft Unif Load: D = 0.0170, Lr = 0.020, S = 0.0250 k/ft, Trib= 2.0 ft Point: E=-3.336k@2.125ft Point: E = 3.336 k @ 10.375 It Point: E = -3.336 k @ 12.833 it Design Summary Max fb/Fb Ratio = 0.356. 1 to : Actual : 1,477.97 psf at 6.480 it in Span # 1 Fb : Allowable, 4,147.20 psi Load Comb: +1.20D+1.60L+0.505+1.60H Max fv/FvRatio = 0.201 : 1 fv : Actual : 91.95 psi at 12.053 it in Span # 1 Fv: Allowable : 457.92 psi Load Comb : +1.20D+1,60L+0.50S+1.60H Max Reactions (k) D L Lr S W E Left Support 1.41 1.60 0.26 0.32 -2.16 Right Support 1.41 1.60 0.26 0.32 -1.18 I x Deflections - Transient Downward 0.134 in Total Downward 0.252 in Ratio 1160 Ratio 616 LC: L Only LC: +D+L+H Transient Upward -0.016 in Total Upward 0.000 in Ratio 9709 Ratio 9999 LC: E Only LC: NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 (360)876-2284 Second Floor South Beam [2-41 CODE REFERENCES_ Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 Load Combination Set: IBC 2015 Material Properties Project Title: NHD 1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Analysis Method: Load Resistance Factor D Fib Load Combination iBC 2015 Fb- DESIGN SUMMARY Fc - Prll Wood Species : Hem Fir Fc - Perp Wood Grade : No.2 Fv Beam Bracing Ft Beam is Fully Braced against lateral -torsional buckling 850.0 psi 850.0 psi 1,300.0 psi 405.0 psi 150.0 psi 525.0 psi Printed 13 FEB 2020, 12 03P E: Modulus of Elasticity Ebend-xx 1,300.Oksi Eminbend -xx 470.Oksi Density 26.830pcf I Span - 5.375 ft I Span = 4.708 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Loads on all spans... Uniform Load on ALL spans : D = 0.0120 ksf, Tributary Width = 8.0 It Partial Length Uniform Load : D = 0.0340, Lr = 0.040, S = 0.050 kfft, Extent = 0.0 -->> 10.083 it Load for Span Numbed Point Load : E =-1.495 k @ 0,1250 It Uniform Load : D = 0.0120, L = OA40 ksf, Tributary Width = 3.708 it Load for Span Number 2 Point Load : E =1.495 k @ 0.5417 ft Uniform Load . D = 0.0120, L = 0.040 ksf, Tributary Width = 4.875 ft DESIGN SUMMARY 'Maximum Bending Stress Ratio = 0.16a 1 Section used for this span 4x12 = 270.65psi = 1,615.68psi Load Combination +1.20D+1.60L+0.505+1.60H, LL Comb Location of maximum on span = 5.375ft Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Maximum Maximum Shear Stress Ratio Section used for this span ")eAinn O 0.172 : 1 4x12 44.71 psi 259.20 psi Load Combination +1.20D+1.60L+0,505+1.60H, LL Comb Location of maximum on span = 5.375 it Span # where maximum occurs = Span # 1 0.004 in Ratio= 18119>=360 -0.003 in Ratio= 24392>=360 0.006 in Ratio = 9930>=240 -0.001 in Ratio= 83943>=240 ou.,. apan Max.'- Usti Location in Span Load Combination Max. "+^ Defl Lombon in Span L+H +D+, Ll Oomb Run (L') _ _ - 1 0.0065 2.432 0.0000 ao00 +D+0.750L+0.7505+0.5250E+H, LL C 2 0.0050 2.525 0.0000 0.000 Vertical ReaCtions Support notation: Far left is#1 Values in KIPS Load Combination Support1 Support2 Support3 — Overall MAXimum -1.510 2.963 0.760 - NL Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 (360) 876-2284 Wood Beam DESCRIPTION: Second Floor South Beam [2-4] Project Title: NHD 1062-Z Engineer: Project ID: 9696-16 Project Descr: SFR Printed 13 FEB 2020, 1203PM Vertical Reactions Support notation: Far left is#1 Values in KIPS Load combination Support Support Supporta +D+H 0.376 1.190 0.333 +D+L+H. LL Comb Run ('L) 0.329 1.750 0.738 +D+L+H, LL Comb Run (L') 0.722 1.703 0.272 +D+L+H, LL Comb Run (LL) 0.675 2.262 0.678 +D+Lr+H, LL Comb Run ('L) 0.367 1.305 0.416 +D+Lr+H, LL Comb Run (L') 0.470 1.328 0.317 +D+Lr+H, LL Comb Run (LL) 0.460 1.443 0.400 +D+S+H 0.481 1.506 0.416 +D+0,750Lr+0.750L+H, LL Comb Run (' 0.334 1.696 0.699 +D+0.750Lr+0.750L+H, LL Comb Run (L 0.705 1.678 0.275 +D+0.750Lr+0.760L+H, LL Comb Run (L 0.663 2.184 0.642 +D+0.750L+0.750S+H, LL Comb Run ('L 0.420 1.847 0.700 +D+0.750L+0.750S+H, LL Comb Run (L' 0.714 1.612 0.350 +D+0.750L+0.7508+H, LL Comb Run (LL 0.679 2.231 0.654 +D+0.60W+H 0.376 1.190 0.333 +0+0.70E+H -0.680 2.166 0.414 +D+0,750Lr+0.750L+0.450W+H, LL Comb 0.334 1.696 0.699 +D+0.750Lr+0.750L+0.450W+H, LL Comb 0.705 1.678 0.275 +D+0.750Lr+0.750L+0.450W+H, LL Comb 0.663 2.184 0.642 +D+0.750L+0.750S+0.450W+H, LL Comb 0.420 1.847 0.700 +D+0.750L+0.15oS+0.450W+H, LL Comb 0.714 1.812 0.350 +D+0.750L+0.750S+0.450W+H, LL Comb 0.679 2.231 0.654 +D+0.750L+0.750S+0.5250E+H, LL Comb -0.373 2.579 0.760 +D+0.750L+0750S+0.5250E+H, LL Comb -0.079 2543 0.411 +D+0.750L+0.750S+0.5250E+H, LL Comb -0.114 2.963 0.715 +0.60D+0.60W+0.60H 0.226 0114 0.200 +0.60D+0.70E+0.60H -0.831 1.690 0.281 D Only 0.376 1.190 0.333 Lr Only, LL Comb Run ('L) -0.010 0.115 0.083 Lr Only, LL Comb Run (L') 0.093 0.138 -0.016 Lr Only, LL Comb Run (LL) 0.084 0.253 0.067 L Only, LL Comb Run ('L) -0.047 0.560 0.405 L Only, LL Comb Run (L') 0.345 0.512 -0.061 L Only, LL Comb Run (LL) 0.299 1.072 0.345 S Only 0.104 0.316 0,084 W Only E Only -1.510 1.394 0.116 H Only Wind Load Determination Assumed North Basic Dimensions Plan View 24'-0" North/South Elevation 51'-0" 24'-0" East/West Elevation 51'-0" 23'-6.5" Wind Forces P_net Exposure Category B Base Wind Speed V (mph) 110 Velocity Pressure Coefficient K_z 0.65 Topographic Factor K_A 1 Coefficient C (P_net = C * C net) 20.13 I Wind Normal to East/West Wall 1 Walls Windward Wall 0.43 0.73 Leeward Wall -0.51 0.21 Roofs Leeward Roof 1 -0.66 -0.35 Windward Roof Cond.1 1 -0.58 -0.28 Fc -on -d. 2 0.031 0.34 Roof Forces P_net First Floor Leeward Walls ft + + Horizontal Windward Wall 8.66 14.70 Leeward Wall -10.27 -4.23 Windward Roofs Angle 22.61986 degrees Cond.1 Horizontal Leeward Roof -13.29 -7.05 Windward Roof -5.20 Cond.2 Horizontal 0.23 Cond.1 -11.65 -5.64 Cond.2 0.601 6.85 Roof Forces First Floor Leeward West Wall Height 9.5 ft + ft Horizontal -5.11 -2.71 Vertical -12.27 -6.50 Roof Windward Pitch 0.416667 Angle 22.61986 degrees Cond.1 Horizontal -4.49 -2.17 Vertical -10.78 -5.20 Cond.2 Horizontal 0.23 2.63 Vertical 0.56 6.32 Dimensions First Floor West Wall Height 9.5 ft West Wall Length 51 ft Second Floor West Wall Height 8.5 ft West Wall Length 137.16667 ft Roof Pitch 0.416667 Angle 22.61986 degrees Height 5 ft Cond. 1 -4.49 -2.17 Cond.2 ----� 0.23 2.63 8.66 14.70 Cond. 1 12.27 10.78 6.50 5.20 Cond.2 -0.56 -6.32 Diaphragm Forces Roof East/West Diaphragm Load (lb) 3983 Second Floor East/West Diaphragm Load (lb) 7574 East/West Base Shear (lb) 11557 5.11 2.71 10.27 4.23 Wind Normal to North/South Wall C net Dimensions Walls First Floor + - North Wall Height 9.5 ft Windward Wall 0.43 0.73 North Wall Length 24 ft Leeward Wall -0.51 -0.21 Second Floor Roofs North Wall Height 8.5 ft + North Wall Length 24 1 ft Parallel to Roof 1 -1.09 -0.79 8.66 14.70 Roof Pitch 0.416667 Angle 22.62 degrees Height 5 ft 21.95 15.91 Diaphragm Forces P_net Walls 3066 North/South Second Floor Windward Wall 8.66 14.70 Leeward Wall -10.27 -4.23 7154 Roofs Leeward Roof 1 -21.95 -15.91 8.66 14.70 Roof Pitch 0.416667 Angle 22.62 degrees Height 5 ft 21.95 15.91 Diaphragm Forces North/South Roof Diaphragm Load (lb) 3066 North/South Second Floor Diaphragm Load (lb) 4088 North/South Base Shear (lb) 7154 10.27 4.23 ATC Hazards by Location Search Information Address: Yelm, WA, USA Coordinates: 46.9420431,-122.6059582 Elevation: 354 ft Tim esta mp: 2020-02-13T1 9:40;43.589Z Hazard Type: Seismic Reference IBC -2015 Document: 0.747 Risk Category: II Site Class: D MCER Horizontal Response Spectrum Sa(g) Numeric seismic design value at 1.0s SA 1.20 1.00 0.80 0.60 0.40 0.20 0.00 0 5 10 15 Basic Parameters Tacoma of o Puyallup -'! 354 ft Ria Cly*cnl?it'- V11 Rainier National Par ^[:ergcaia ncr- Go gle rhrhal Map, Report a map error Design Horizontal Response Spectrum Sa(g) 0.80 0.60 0.40 0.20 0.00 Period (s) 0 5 10 15 Name Value Description SS 1.248 MCER ground motion (period=0.2s) SI 0.497 MCER ground motion (period=l.Os) SMS 1.249 Site -modified spectral acceleration value SMI 0.747 Site -modified spectral acceleration value SDS 0.833 Numeric seismic design value at 0.2s SA SDI 0.498 Numeric seismic design value at 1.0s SA Additional Information Name Value Description SDC D Seismic design category Fa 1.001 Site amplification factor at 0.2s Fv 1.503 Site amplification factor at 1.0s Period (s) CRS 0.986 Coefficient of risk (0.2s) CRI 0.942 Coefficient of risk (1.0s) PGA 0.517 MCEG peak ground acceleration FPGA 1 Site amplification factor at PGA PGAM 0.517 Site modified peak ground acceleration TL 16 Long -period transition period (s) SsRT 1.248 Probabilistic risk -targeted ground motion (0.2s) SsUH 1.266 Factored uniform -hazard spectral acceleration (2% probability of exceedance in 50 years) SSD 1.5 Factored deterministic acceleration value (0.2s) S1 RT 0.497 Probabilistic risk -targeted ground motion (1.Os) S1 UH 0.528 Factored uniform -hazard spectral acceleration (2% probability of exceedance in 50 years) S1 D 0.6 Factored deterministic acceleration value (1.0s) PGAd 0.6 Factored deterministic acceleration value (PGA) The results indicated here DO NOT reflect any state or local amendments to the values or any delineation lines made during the building code adoption process. Users should confirm any output obtained from this tool with the local Authority Having Jurisdiction before proceeding with design. Disclaimer Hazard loads are provided by the U.S. Geological Survey Seismic Design Web Services. While the information presented on this website is believed to be correct, ATC and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in the report should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the report. rcoor Area �,econa hioor(sgtt) Attic Area (sqft) 0 Roof Area First Floor (sqft) 529 Second Floor Area (sqft) 821 First Floor Wall Perimeter (ft) 150 Second Floor Wall Perimeter (ft) 122 Roof Diaphragm Weight (lb) 22347 Second Floor Diaphragm Weight (lb) 33639 Total Seismic Weight (lb) 55986 Comparison of Wind Loads and Seismic Loads for Diaphragms: Roof Diaphragm: East/West Direction: Wind Load: 3983 Ib Seismic Load: 4517 Ib North/South Direction: Wind Load: 3066 Ib Seismic Load: 4517 lb Second Floor Diaphragm: East/West Direction: Wind Load: 11557 lb Seismic Load: 8105 lb North/South Direction: Wind Load: 7154 lb Seismic Load: 8105 Ib Shear Wall Design Seismic Factor(s) SDs 1 0.941 Design of Second Floor North Shear Wall Full length = 5.5 ft Wall Height = 8 ft I Length of Full height wall= 5.5 ft Max Height of opening = 0 ft % of full height walls = 100% Shear Resistance Adjustment Factor, Cc = 1 (2015 SDPWS Table 4.3.3.5) V = 2259 lbs (from Seismic calcs) Uplift Anchorage, T = Vh / CoELi = 3285 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 411 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 453.4 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir, LRFD, and 2`b/h (b=2'-8.5") Vertical Load (0.9-0.2Sps)D = 24.2 plf For Smallest Segment (0.9-0.2SDS)D+ 1.0(W or E) Net uplift= 3219 lbs Uplift from above floor = 0 lbs Net Uplift= 3219 lbs Hold Downs Required Shear capacity of 16d box nails = 192 lbs (NDS Table 11N, LRFD) Minimum required spacing= 6 in Use 16d @ 5" nailing. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 199.1 psi Use double Stud at Ends Design of Second Floor, South Shear Wall Full length = 5.542 ft Wall Height = 8 ft I Length of Full height wall= 5.542 ft Max Height of opening = 0 ft % of full height walls = 100% Shear Resistance Adjustment Factor, Co = 1 (2015 SDPWS Table 4.3.3.5) V = 2259 lbs (from Seismic calcs) Uplift Anchorage, T = Vh / CoELi = 3260 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 408 plf (2015 SDPWS Eqn 4.3-9) 7116" min wl 8d Nails @3" edge spacing = 425.5 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir, LRFD, and 2*b/h (b=3'-0.5") Vertical Load (0.9-0.2Sps)D = 24.2 plf For Smallest Segment (0.9-0.2SDS)D+ 1.0(W or E) Net uPlift= 3193 lbs Uplift from above floor = 0 lbs Net Uplift= 3193 lbs Hold Downs Required Shear capacity of 16d box nails = Minimum required spacing = Use 16d @ 5.5" nailing. 192 lbs (NDS Table 11N, LRFD) 5.66 in Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 197.6 psi Use double Stud at Ends Design of Second Floor, West Shear Wall Full length = 27 ft Wall Height = 8 ft Y Length of Full height wall= 27 ft Max Height of opening = 0 ft of full height walls = 100% Shear Resistance Adjustment Factor , Co = 1 (2015 SDPWS Table 4.3.3.5) V = 2259 lbs (from Seismic calcs) Uplift Anchorage, T = Vh / CoELi = 669 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 84 plf (2015 SDPWS Eqn 4.3-9) 7116" min wi 8d Nails @6" edge spacing = 357.1 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.2SDS)D = 157.3 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net Uplift= -1454 lbs Uplift from above floor = o lbs Net Uplift = -1454 lbs No Hold Downs Required Shear capacity of 16d box nails = 192 lbs (NDS Table 11N, LRFD) Minimum required spacing = 27.55 in Use prescriptive nailing. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 40.56 psi Use double Stud at Ends Design of Second Floor East Shear Wall Full length = 23.21 ft Wall Height = 8 ft I Length of Full height wall= 23.21 ft Max Height of opening = 0 ft of full height walls = 100% Shear Resistance Adjustment Factor, Co = 1 (2015 SDPWS Table 4.3.3.5) V = 2259 lbs (from Wind calcs) Uplift Anchorage, T = Vh / CoELi = 779 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 97 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 357.1 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.2Sos)D = 198.9 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net Uplift= -1530 lbs Uplift from above floor = o lbs Net Uplift = -1530 lbs No Hold Downs Required Shear capacity of 16d box nails = 192 lbs (NDS Table 11N, LRFD) Minimum required spacing= 23.68 in Use prescriptive nailing. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 47.18 psi Use double Stud at Ends Design of First Floor, North Shear Wall Full length = 14 ft I Length of Full height wall= 14 ft of full height walls = 100% Wall Height = 9 ft Max Height of opening = 0 ft Shear Resistance Adjustment Factor, Co = 1 (2015 SDPWS Table 4.3.3.5) V = 3138 lbs (from Seismic calcs) Uplift Anchorage, T = Vh / CoELi = 2017 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 224 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 277.8 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir, LRFD, and 2*b/h (b=3'-6") Vertical Load (0.9-0.2SDS)D= 24.2 plf For Smallest Segment (0.9-0.2SDS)D+ 1.0(W or E) Net Uplift= 1848 lbs Uplift from above floor= o lbs Net Uplift = 1848 lbs Hold Downs Required Shear capacity of 5/8 dia anchors = 1856 lbs (NDS Table 11E, LRFD) Minimum required spacing= 8.28 ft Use 5/8" dia Anchors at 4'-0" on center. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 122.3 psi Use double Stud at Ends Design of First Floor, Garage Shear Wall (1) Full length = 11.96 ft Wall Height = 9 ft F Length of Full height wall= 11.96 ft Max Height of opening = 0 ft %of full heightwalls= 100% Shear Resistance Adjustment Factor, Co = 1 (2015 SDPWS Table 4.3.3.5) V = 2475 lbs (from Wind calcs) Uplift Anchorage, T = Vh / CoELi = 1863 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoE,Li = 207 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 498.5 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.2SDS)D = 44.1 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net uplift= 1599 lbs Uplift from above floor= o lbs Net Uplift= 1599 lbs Hold Downs Required Shear capacity of 5/8 dia anchors = 1856 lbs (NDS Table 11E, LRFD) Minimum required spacing= 8.97 ft Use 5/8" dia Anchors at 4'-0" on center. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 112.9 psi Use double Stud at Ends Design of First Floor, Garage Shear Wall (2) Full length = 6.458 ft Wall Height = 9 ft E Length of Full height wall= 6.458 ft Max Height of opening = 0 ft % of full height walls = 100% Shear Resistance Adjustment Factor, Co = 1 (2015 SDPWS Table 4.3.3.5) V= 2926 lbs (from Wind calcs) Uplift Anchorage, T = Vh / CoEU = 4078 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 453 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 498.5 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.2Sos)D = 83.7 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net Uplift = 3807 lbs Uplift from above floor = o lbs Net Uplift = 3807 lbs Hold Downs Required Shear capacity of 5/8 dia anchors = 1856 lbs (NDS Table 11E, LRFD) Minimum required spacing= 4.10 ft Use 5/8" dia Anchors at 4'-0" on center. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 247.1 psi Use double Stud at Ends Design of First Floor, South Shear Wall Full length= . 7 67 ft Wall Height = 94 c Length of Full height ...u— 27.Ei7 4 Hoax Height of epeniRg — 04 of of full h..ight ,. alk - 100 V = 3619 lbs (from Wind calcs) 1 pli4 A..Ch OFage T _ Vh / G9 Li — 417-7 lbs (2015 SDPWS Eqn 4.3 8) Arca of Ml 2)9 stud is 449-4i..0. tensiaR/....mppeesien StFeSS iS 71 A% f354 Use do -Able St -w -d at Fndg (3) 16"X108" portal frames were used for lateral resistance in this section. Design of First Floor, West Shear Wall Full length = 46.25 ft E Length of Full height wall= 46.25 ft % of full height walls = 100% Shear Resistance Adjustment Factor, Co = Wall Height = 9 ft Max Height of opening = 0 ft 1 (2015 SDPWS Table 4.3.3.5) V = 4053 lbs (from Seismic talcs) Uplift Anchorage, T = Vh / CoEU = 789 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 88 plf (2015 SDPWS Eqn 4.3-9) 7/16" min w/ 8d Nails @6" edge spacing = 357.1 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.2Sps)D = 157.3 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net Uplift = -2849 lbs Uplift from above floor= o lbs Net Uplift = -2849 lbs No Hold Downs Required Shear capacity of 5/8 dia anchors = 1856 lbs (NDS Table 11E, LRFD) Minimum required spacing = 21.18 ft Use 5/8" dia Anchors at 4'-0" on center. Area of (2) 2x6 stud is 16.5 int; tension/compression stress is 47.79 psi Use double Stud at Ends Design of First Floor. East Shear Wall Full length = 39.25 ft E Length of Full height wall= 39.25 ft % of full height walls = 100% Shear Resistance Adjustment Factor, Co = Wall Height= 9 ft Max Height of opening = 0 ft 1 (2015 SDPWS Table 4.3.3.5) V = 4053 lbs (from Seismic calcs) Uplift Anchorage, T = Vh / CoELi = 929 lbs (2015 SDPWS Eqn 4.3-8) Unit shear force, v = V/CoELi = 103 plf (2015 SDPWS Eqn 4.3-9) 7/16" min wl 8d Nails @6" edge spacing = 357.1 plf (2015 SDPWS Table 4.3A) Adjusted for Hem Fir and LRFD Vertical Load (0.9-0.25ps)D = 78.65 plf For Smallest Segment (0.9-0.2SDS)D + 1.0(W or E) Net uplift= -614 lbs Uplift from above floor = o lbs Net Uplift = -614 lbs No Hold Downs Required Shear capacity of 5/8 dia anchors = 1856 lbs (NDS Table 11E, LRFD) Minimum required spacing= 17.97 ft Use 518" dia Anchors at 4'-0" on center. Area of (2) 2x6 stud is 16.5 in2; tension/compression stress is 56.32 psi Use double Stud at Ends