NOTES FOR JOB: 108621827
1. SCOPE OF JOB: RETIRE CI -0038 PER WO#108621827.
2. ALL CONSTRUCTION IS TO CONFORM TO PUGET SOUND ENERGY GAS STANDARDS AND GAS FIELD
PROCEDURES.
3. SHADING INDICATES EXISTING PIPING.
(NOT ALL EXISTING PIPING IS SHADED)
4. PSE SERVICE PROVIDER OR CONTRACTOR TO CALL 1-800-424-5555 OR 811 TWO (2) WORKING
DAYS PRIOR TO EXCAVATING TO LOCATE UNDERGROUND UTILITIES.
5. EROSION AND SEDIMENT CONTROL SHALL BE PER STANDARD PRACTICE AND ANY OTHER
ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
6. ANY CHANGE IN FACILITY ORIENTATION AND PIPE ROUTING, PIPE SIZE/TYPE, TIE—IN METHOD OR
EQUIPMENT MUST BE APPROVED BY THE PSE ENGINEER ASSIGNED TO THE PROJECT.
7. ALL PIPING TO BE COATED IN ACCORDANCE WITH PSE OPERATING STANDARD 2600.1100.
8. RETURN ALL SALVABLE MATERIALS TO PSE STORES.
9• RECORD X/Y LOCATION OF ANODE AND PIPE—TO—SOIL POTENTIAL (PSP) FOR ALL ISOLATED
WRAPPED STEEL PIPE AND RISERS ON AS—BUILT.
10. SERVICE PROVIDER OR CONTRACTOR TO NOTIFY MUNICIPAL INSPECTORS PER REQUIREMENTS OF
THE STREET USE PERMIT.
11. COORDINATE CATHODIC PROTECTION WITH CORROSION ENGINEER. CONTRACTOR TO NOTIFY
CORROSION CONTROL TECHNICIAN AT LEAST TWO (2) WORKING DAYS PRIOR TO START DATE.
12. SYSTEM MAOP = 60 PSIG.
13. REMOVE ABOVE GROUND PIPE AND VALVES.
14. PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE
GAS STANDARD 2525.3600.
15 MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS
2525.3300 AND 2525.3400.
Q
00
6
0
N
0
N
3
x
0
E
>,
m
0
0-
I I
N
a�
I
rn
3
C%4
0
I
r
I
0
0
0
00
E
a�
x
0
E
—I
i
W
U
a�
0
0L
0
i
0
EX. RISERS TO BE CUT
A MINIMUM OF 30" BELOW
GRADE
EX. CNG INJECTION SITE
11�Ai r,A DDAIDIC \/ICTA I r)OD
DETAIL 1
SCALE: 1"=20'—O" 1
N
CD
0
ro
FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION)
❑
INSPECTED
STEEL AND PE
PIPE PER GOS 2450.1400 AND 2450.1500.
❑
REVIEWED
AND COMPLIED
WITH ALL CONSTRUCTION NOTES.
❑
RECORDED
ALL REQUIRED
INFORMATION ON THE AS—BUILT PER GOS 2500.1700.
❑
COMPLETED POST INSTALLATION
INSPECTION PER GOS 2525.1200 AND 2525.2700.
❑
LEFT THE
WORK AREA IN
A CLEAN AND SAFE CONDITION.
FOREMAN'S SIGNATURE:
FOREMAN'S NAME (PRINTED):
COMPANY: DATE:
4680 06/11
A0 p /
RETIRE CNG INJECTION SITE PER WO N A T / N A�.7.12020.05.27
108621827 • ' 09:25:55-07'00'
REV DESCRIPTION BY I CKR I CP I ENG I APP I PM DATE
REVISIONS
PC = PSE PRESSURE CONTROL WILL PROVIDE ITEM
PO = NON STOCK ITEM
CR = CONTRACTOR WILL PROVIDE ITEM
ORDER #--108621827 _
❑
TEST TYPE
18
SOAP
❑ AIR ❑
NITROGEN
❑ WATER
❑
/
17
START TIME
TESTED BY
DATE OFF
❑
/
16
PRESSURE TEST RESULTS ❑ P ❑ F
TEST TYPE
❑
SOAP
15
NITROGEN
❑ WATER
DATE ON
/
❑
START TIME
14
TESTED BY
DATE OFF
/
/
❑
13
PRESSURE TEST RESULTS ❑ P ❑ F
❑ TESTED BY PSE PRESSURE CONTROL,
SEE FORM
1928
❑
12
I SYSTEM MAOP
2023 03/10
❑
11
❑
10
❑
9
❑
8
❑
7
❑
6
❑
5
❑
4
❑
3
❑
2
1
ICAP, 5/8", MDPE
5200549
❑
1
1
1 CAP, 2", MDPE
5200649
CHECK I ACTUAL I ITEM I QTY
DESCRIPTION
BILL OF MATERIALS
GAS MAIN PRESSURE AND TESTING
TEST TYPE
❑
SOAP
❑ AIR ❑
NITROGEN
❑ WATER
DATE ON
/
/
START TIME
TESTED BY
DATE OFF
/
/
STOP TIME
PRESSURE TEST RESULTS ❑ P ❑ F
TEST TYPE
❑
SOAP
❑ AIR ❑
NITROGEN
❑ WATER
DATE ON
/
/
START TIME
TESTED BY
DATE OFF
/
/
STOP TIME
PRESSURE TEST RESULTS ❑ P ❑ F
❑ TESTED BY PSE PRESSURE CONTROL,
SEE FORM
1928
DESIGN PRESSI
I SYSTEM MAOP
2023 03/10
PROJECT MANAGER CONTACT INFO
MATT FOSTER
253-476-6318 CELL PHONE
matt. foster@pse.com EMAIL
PART NBR I RATING
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
REAL ESTATE/EASEMENT PERMIT
N/A N/A
FUNCTION NAME PHONE DATE
PROJECT MGR M.FOSTER 253-476-6318
ENGINEER T.TRAN 425-424-7816
DRAWN BY L.MAXWELL 425-424-7474 N/A
CHECKED BY A.STOUFFER 452-424-7818
COUNTY EMER SECTION GAS WK CTR APPROVED BY
THURSTON 49 PGRPCO12 CP APP
1/4 SECTION OP MAP PLAT MAP
SW 13-17-1 280.038 281.042 MAPPING
PUGET RETIRE INJECTION SITE CI -0038
SOUND YELM CNG INJECTION SITE
ENERGY BURNETT DR SE & PRAIRIE VISTA LP YELM, 98597
SAP ORDER NUMBER
108621827
DWG NUMBER REV
3D00-437
SCALE: 1" = 20'-0" 2/2