Loading...
20100044 Permit Pkg 042010City of Yelm Community Development Department Building Division Phone: (360)458-8407 Fax: (360)458-3144 Applicant: Name: AHO CONSTRUCTION Address: 5512 NE 109TH CT, STE 101 VANCOUVER WA 98662 Property Information: site Address: 10041 COCHRANE AVE SE 12 Owner: AHO CONSTRUCTION Assessor Parcel No.: 56510001200 Subdivision: Contractor Information: Name: AHO CONSTRUCTION Address: CHAD 5512 NE 109TH CT, STE 101 VANCOUVER WA 98662 Contractor License No.: Project Information: Project: NEW RESIDENTIAL BUILDING Description of Work: PLAN #1727 LOT 12 JOHNS MEADOWS Phone: Expires: 0/00/0000 Sq. Ft. per floor: First 1727 Heat Type (Electdc, Gas, Other): GAS Second Third Garage Basement Fees: Item NEW RESIDENTIAL BUILDING MECHANICAL PLUMBING a7n Contractor Fees AHO CONSTRUCTION $12,554.23 AREA HEATING $ 71.75 WATERWAYS $ 104.00 TOTAL FEES: $ 12,729.98 Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in wnformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a wntractor, I further certify that I am currently registered in/t~/}e~/Sftate off WashiOgton. Signature L 'T 'nnt'/ " /L- Date y - a~ - / ~ Firm 4"*^n l..Ov~S~C..,~ io„` ~ .1N~ Permit No.: 20100044 Issue Date: 4/20/2010 (Work must be started within 180 days) Phone: 360-491-6632 Lot: 12 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: "!~i i` City of Y~lm i36D) 458-54n~ F'EC#: OOOC7~96 4lCO/?010 1:53 F'N OF'ER:r.U TERN: 001 REEK: TRAM: 33.oona HUILDING FEfi'NITS ~oiooo5o 11.6D4.53CR AHO CONSTRUCTION i`,4~`, GREEtdHRIER 5T 5E 44 BLD-RE5'_ 11~449.79CR NECH ?1.75CR F'~ S.,.OO~R IRAN: ;,3.0000 HUILDIIIC FEh'NITS 0100045 12 377.15CR AHO COidSiRUCTION 16451 G,4EENHRIER ST 5E 45 HLD-R'E51 1_?,157.'ROCRI hiECH 7S.~=CR FL 11i.OCG'R TRAM: 33.0,]00 HUILDIPIG PERMITS ~O100r,44 11, 535.0?CR' AHO CONSTRUCTION! 10041 COCHRANE RUE SE i? HI_D-RESi 11,6~3.3?CR MECH ?1,i5CF' F'L i04.0pCR TENDERED: 354316.75 CHEC'Y AF ~.°L IED: 35.516.75- CHAPlr,OE: O,On ~. YELM COMMUNITY SCHOOLS PO BOX 476 YELM WA 98597 Clerk: Gerber Terminal: 1 Receipt: 1232241Reprint) Manual Receipt: ~iAi NA'., .oho Construction I, Aho 4I7Y2010 11:06 AM ~t~..__i_C2q~--------------- Price 1 CFtREV,2900 8340.00 MIiTG~TION 07-017 Lots~l,;;r44 & 45 -Michael Mastro Subtotal: 8340.00 Tax: 0.00 Total: 8340.00 Check 8340.00 1069 Change Due: 0.00 REPRINT RECEIPT THANK YOU a aao ooc~ r ~ iZ ~J~ OCk P1.~,~r CITY OF YELM RESIDENTIAL ssUILpING PERMIT APPLICATION FORM I DOS'! CfiC /, r~ n I° ~ ~ s~ Project Address: ~ oC-'L 'p\ ar.. Parlce~l #: ~S~(c ~S~G/(iU / Z o ~ Subdivision:~o~.wi Ilrlrad~l Lot #: Plan #:~ /~~ _ Zoning: New Construction ^ Re-Model I Re-Roof /Addition ^ Home Occupation Sign ^ Plumbing ^ Mechanical ^ Mobile /Manufactured Home Placement ^ Other Project Description/Scope of Work: A~ PvJ ~ ar.Saf e~: o~n Project Value: ( / Building Area (sq. ft) 1s` Floor :'~~~ ~2ntl Floor;, _ Garage _7?~ Deck Basement Carport Patio # Bedrooms # Bathrooms? ~' Heating: AS THER or ELECTRIC (Circle One) Are there any environmentally sensitive areas ibcated on the parcel? No If yes, a completed environmental checklist must accompany permit application. BUILDNG'®WN,_ NA:~V.o Cfl-~~r~.ca~o.-, '2. T.ne. ADDRESSSSId rVE IOq"' C~ _STE /ol EMAIL Cb.a.a~4MoCo+~saouc~_a.~.@on. CITY~c,..eo~.J~ STATE WJ+ ZIP 9 8663 TELEPHONE 3xE, - 491 - 6631 ARCI~ItTE~_ NGI'I~~-• .~v.s el' or LICENSE# ADDRESS~~~ ^O aJ E H4;`` G'•rel,_ 'EMAIL CITY UOnCov./.cr STATE ~.~A ZIP ci S68a.- TELEPHONE 360 • 6oO - 6oS4 ,~ EN RAL C®NTRA,~CsTO Ow~~-C' TELEPHONE ADDRESS EMAIL '`' CITY STATE ZIP FAX CONTRACTOR'S LICENSE # EXP DATE CITY LICENSE # TE CITY LICENSE LICENSE # TELEPHONE 36o- 737 - 0 811 CITY Copy of mitigation agreement with Yelm EXP DATECITY LICENSE if applicable. I hereby certify that the above Information is correct and that the construction on, and the occupancy and the use oT the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Yelm. .~ Applicant's Signature Date Owner 1 Contractor I Owner's A ent I Contractor's A en Please circle one.) All permits are non-transferable and will expire if work authorized by such permit Is not begun within 180 days of issuance, or if work is suspended or abandoned for a perl`~ ~ $~ d~~57V ~cll MAR 1 0 2010 105 Yelm Aoenne Weat ~ (360) 458-3835 Yelm, WA 98597 (300) 458-3144 FAX wwro.ci.yelm.uro. ua Johns Meadows Lot 12 PLAN 1727 SCALE: 1 "=20' ~sso~ ~\T 10041 Cochrane Ave. NE s~ APPROVLD ~ ~ ~~ F~ L~ Jam. Q' ~/ APR 0 7 2010 BUJ BY: -------------------- ~Ull~ QI I~~~~~ ~G_ :~r~ °.:°;~.°"` lj^~~ !`% '. °'_=: AEI ,,, , ~. ,G.,_ G::=;= " f:.^. T '' ~ TTY Affil CI':ii~Tn'14=(,~~~ ~. (~ H~_, ~ 'b -' o; cmT ?t1ir~~n~yc °~5 1?"° ,::~~J..~ _.. r';FU7 CQ6;; ~ `:u~: TTY!`; IGOY~ CCC~:FA~!E AVE s: . . ~, TF~AN: ~3.GGGG i!IJILPIi+'6 f'EGiiT~~ ?G?GGG4h "F I'CF' RHG CrNSTRUCTI~r 1GG'fi CGCHF'.A~:'E r,U~ SE °~ HI s -RE .l 755.' JCF; P TEPfDEREP. ^auGS.l'? CrE^I~. CHAF!.r,E: G. ~~G 64I22/2ees 1e: 29 '~ wrightsoft~ 3667376946 Load Short Form Entire House Area Heating & Cooling AREA HEATING COOLING PAGE 62/02 Job; Date: Apr R2, 2ooe By. ~ Project Information For. 2060 2 story, AHO Construction ~ • o Htg Clg infiltration Outside db (°F) 23 83 Method Simpllfled Inside db (°F) 68 75 Construction quality Semi-tight Design Tb (°F) 45 8 Fireplaces 1 (fight) Daily range - M •Inside humidity (°/a) 50 50 Moisture difference (gr/fb) 37 -2 HEATING EQUIPMENT Make Trade Model LAMA 1D Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 0 Btuh 0 Btuh 0 °F 927 cfltt 0.040 cfmlBtuh 0.00 in H2O COOLING EQUIPMENT Make Trade Cond Coil ARI ref no, Efficiency 0 EER Sensible cooling 0 8tuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 927 cfm Air flow factor 0.046 cfm/Btuh Static pressure 0.00 in H2O Load sensible heat ratio 0.99 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (R~ (Btuh) (Btuh) (cfm) (cfm) main floor 999 12591 12130 501 560 upper floor 1061 10701 7941 426 367 Entire House d 2060 23292 20071 927 927 Other equip loads 3225 569 Equip. @ 0.88 RSM 18142 Latent cooling 165 rnrnn.c. nnen nae°~ eor°n~ n~~ nn~ uar ~u D~yM~4~o-- L~p ovo p~Tu ~~ y~lC ~g~g~~gD MAR 1 0 1010 D Printout terrified by ACA to meet all requirements of Manual J eth~d.' °---------------- °lRfr ~ - '`' • ~ yy~IghtSOfY RlgnbGWleTM llnNareu17.0.a2 RSUOG1pe 2008-Apr-2]. 10320 AC,I.A C:10ocumente and 9eClnps\OaII1My Oocumrnt°wHO~oao,Np Celt n MJB OrlenleUon m E Papc 7 STRUCTURAL DESIGN INFORMATION GOVERNING CODE: 2006International Residential Code (IRC) 2006 International Building Code (IBC) This engineering pertains [o [he design of the Lateral Force Resisting System and a review of the home designer's framing and foundation plans. The home designer is responsible for making any necessary changes as required by these calculations to they framing and foundation plans. 1. Dead Load: A. Roof .............................................................. .....1 S Psf B. Floor ................................................................ .....10 psf C. Exterior walls .................................... ............... ..... IO psf D. Exterior walls with veneer ........................................ .... 50 psf E. Interior walls with gypboard each side .............................. .......5 psf 2. Floor live load :............................................................... .....40 psf 3. Snow load: A. Uniformly distributed snow load on roof ......................... ......25 psf 4. Wind load-based on ASCE 7-OS Method 2 Analytical Procedure : A. 3 Second Gust Wind Speed ........................................V =110 mph B. Exposure ................................................................ ...........B C. Importance fac[or ................................................. _... ....I = 1.0 D. Topographical Factor ...........:..................................... ..Kzt=1.0 E. Wind Directional Factor .............................................. Kd=0.85 F. Structure classified as ................................................ ..enclosed 5. Seismic load -based on ASCE 7-05 Section 12.14 A. Mapped Spectral Acceleration for short periods ............ ...........Ss=1.0 B. Mapped Spectral Acceleration for I second period ......... .........S1=0.34 C. Soil Site Class ................................................... ..................D D. Ductility coefficient ............................................. ...........R=6.5 E. Seismic Design Category ....................................... .................D 6. Foundation Soil Properties: A. Undisturbed sandy silt per IBC 2006 Table 1804.2...........Soil Class # 5 B. Maximum vertical bearing pressure ..................................1500 psf 7. Retaining wall lateral loads: A. Walls free to displace laterally a[ top ..................................35 pcf B. Walls restrained against lateral displacement az top ...................45 pcf 8. Concrete: A. 28 day design strength F'c ..............................................3000 psi B. Reinforcing bars ....................................... ASTM A615, Grade 60 ~~!yy.~~p V`"lsO Project QUID CONSTRVGTIOI~ - I7 Z7 'Jt~~'OQ y /4'N~ ~ Category STRUCTURAL INFORMATION Pm3ect No. Sheet SI-1 ~ ¢ce93 ~ .~ ~~ moral Eng'4~ zi6o8 N.E. 49th Circle Vancouver Washington 98682 Phone: (360) 600-6084 Fax: ~~~ ~~r1L~ MAR 1 0 ZDii, SEISMIC DESIGN BASED ON ASCE-7-05 12.14 Simplified AFtemative Structural Design Criteria for Simple Bearing Wall Systems 1'2•SD5 W SEISMIC BASE SHEAR ~ (Eq.12.1411 with F=12) V .- R Ss mapped spectral acceleration for 55:=1.00 short pa nods (Sec. 11.4.1) from USGS we b site 55 mapped spectral acceleration for Sty 0.34 1 second period (Sec. 11.4.1) Fa Site wefflclent (Table 11.41) Fa'- 1'1 Based on Soll F~ : 18 Slte Class D F„ Site mefFiciant (Table 11.42) Srns = Fa'Ss Skits =1.1 (Eq.11.41) Sett = F„•St ~ SMt = 0.61 (Eq.11.42) 11.4.4 Design spectrum response acceleration parameters 2 Sos:= 3'Sras S°s=0.73 > 0.509 SEISMIC CATEGORY 2 D PERTABLE 11.6-1 Srn ~ 3'SMt Spt = 0.41 1.2•Sps R 6.5 Table 12.141 WOOD SHEAR PANELS V:= •W R 1.2.0.73 V:= ~W V:= 0.135~W 6.5 124 Seismic Load Combinations E~ 1.3•V (Eq.12.43withredundancyfactor=l.3per123k.2) WSD:=0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS ~aers p ~`°~~ A N o - I ~ 2-r Date 3-Il• 09 By i~~ ~ Category LATERAL ANALYSIS Project No. 2~a93 Sheet L-~ C ~S G~ 21.608 N.E. 49th Circle Vancouver Washington 98682 ~Ur ;t,~ al End Phone: (360) 600-6084 Fax: (360) 944-0538 SIMPLIFIED WIND AND SEISMIC CAMPARISON WIND r 1t psf psf Wind Base Ht Shear T Length L:= 52•ft Height Ht := 17•ft SEISMIC Fr ~ Wroof Wwal I WIND= L•Hi•(11•psf + 7•psf) Seismic base Shear l~ A,~ := 52•ft•44~ft W,~ Pt~•15psf+2•(4.5•ft•57•ft)•10psf Wwa~ls ~= 2~8~ft~52•ft SEISMIC= ~P,r~•15~psf + WWe~i,~t0~psf~~0.123 WIND =159121b W~ = 3945016 SEISMIC= 5244.7216 WIND GOVERNS DESIGN fiaerso Project q N o - I -- 2'( 3t i,. 09 BYE ~ ~ ~ ~ Category LATERAL ANALYSIS P>~~q,~• sheei 2 >r G ¢~~ ~ 2i6o8 N.E. 49th Circle Vancouver Washington 98682 ~~~'al En~~~~ Phone: (360) 600-6084 FaX~ (360) 944-0538 WIND DESIGN IS BASED ON A SCE 7-05 METHOD 2 -ANALYTICAL PROCEDURE (Figure 661 VELOCITY PRESSURE qz:= .00256~Kz~ICn•ICd•V2•I (Eq.6-15) EXPOSURE B WIND SPEED (3 second gust) Vas := 110 mph IMPORTANCE FACTOR I := 1.0 TOPOGRAPHICAL FACTOR Krt:=1.0 WIND DIRECTIONAL FACTOR ICd:-0.85 Table 6-4 EXPOSURE COEFFICIENT 0'-15' Kz :=0.57 qz:=.00256~ICz~ICrt•ICd•V3a2~1 qz=15.01 (van e s /height) Z 15'-20' Ki :=0.62 qz:=.00256•Kz•ICn•ICd•V3s ~1 qz=16.32 20'-25' Ki :=0.66 qz:=.00256•Kz'Kzc'Kd~Vas2~l 9z=17.38 25'-30' Ki := 0.70 qz:= .00256~IC1•Krt~ICd~V3s2•I qz=18.43 WIND PRESSURE P:= gz•G~CP G:= 0.85 Gust factor CP pressur e coefficient AT WALLS 0=15' WINDWARD P,,:=15.01•psf~0.85~0.8 Pw=10.21 psf LEEWARD P~:=15.01•psf~0.850.5 P~=6.38psf 15 20 WINDWARD Pw ~ 16.32•psf•0.85~0.8 Pw = 11.1 psf LEEWARD P~=16.32•psf•0.85.0.5 P~=6.94psf AT ROOF 15'_20' WINDWARD Pw:=16.32•psf•0.85.0.3 Pw=4.16 psf LEEWARD P~:=16.32•psf•0.85.0.6 P~=8.32psf za_25' WINDWARD Pw:=17.38•psf•0.85~0.3 Pw=4.43psf LEEWARD P~:=17.38•psf•0.85.0.6 P~=8.86 psf fiaerso Project A ~ O - I -~ ,Z~ /i Date 3-11.09 By ~~ ~ ~ ~ Category LATERAL ANALYSIS Project No. 2( 93 Sheet ~ 3 0 Oo ¢'~ 2a.6o8 N.E. 49th Circle Vancouver Washington 98682 ~~ral En~~~~ Phone: (360) 600-6084 Fax: (360) 944-0538 WIND DESIGN IS BASED ON ASCE 7 05 METHOD 2 -ANALYTICAL PROCEDURE (Plaure 6$1 wnt. cp-o.3 4.'16 8.32 Assume psf psf Cp--0.6 8 ~ 35 9ft 6 ~' 10.2 ~f 8 ft psf windward leeward Roof Loads WindNard 4.16•psf~9•ft=37.44p1f Leeward 8.32~psf•9~ft=74.88p1f Wall loads Windward 10.2•psf~4.5~ft = 45.9 plf Leeward 6.4•psf•4.5•ft=28.8p1f fiaerso Project A N O - I .-I Z-I /i Date 3-11.09 By f~~ ~ ~ ~ Category LATERAL ANALYSIS ~Z~Oq~J' Sheet N ~ G ~S ~ z>!6o8 N.E. 49th Circle Vancouver Washington 98682 ~Ural En~~r~ Phone: (360) 600-6084 Fax: (360) 9q4-o538 wt.~o o,~, RooF W G - 141 P~~- ~9 GV Gb ~i~ o ~ ~ o ' ~ ~ ~ ~ ~ ~ i O ~ i ~ ~ i ~ ~ ~ ~ O ~ ~ i i ~ ~ i O ~ i ~ ~ ~' ~ ~ O ~ ~ _ ` __ - __ ` i _______________ ~ _________~ O i I ' 1U7 ~ \ \ i i ~ ~ J ~ ~ ~ \ `\ i O i ~I u • i ` i _ _ ~ O 1 , i _______~ ~ O i ~ I ~ ~ / / ~ ~ i i ____ __ - __ i i i ~ l+n uO Project nH O I~ Z7 Date u ~6~ q By ,~,.„f4 ~ Category ~Ys1S 2A~ 4 ~ Project No. Sheet „la. , ATE 21.93 ao ;C~ ~' 21608 N.E. 49th Circle Vancouver Washington 98682 F 6 8 ~'ral En~'4 ax: (3 0) 944-053 Phone: (360) 600-6084 W I r1 Q O N w.~t-t-5 31~z 3102 ® 4co5~ d ~2L13 ~~0 Project AF{O ~'12'I j~y~pq BY,4r„~Q. Category lATena.~ ANALYSIS Project No. 2(o9~j Sheet ~-~ ~ ~~ ~ 2i6o8 N.E. 49th C4rcle Vancouver Washington 98682 F 6 8 ~ral EII~4 ax: (3 0) 944-053 Phone: (360) 600-6084 __ ~ 33 SHEAR WALL DESIGN Pdl Pdl Wdl ~ v Y u ~_ P (~ P:= wind .~ ~ V := seismic h R=Holdown 1(/ Force Based on 2006 IBC Basic Load Combinations 1605 31 0.6D + W 0.6•D + 0.7 E Overturning Moment: Resisting Moment Holdown Force (Equatbn 16-14) (Equatbn l6-15) M,r := P~h LZ Mr~ 0.6•~Wai+Wwau)•(Z +0.E+•Pdi•L Mot - Mr R := L ~dersO Project A N O - I .-~ 2_( Fi Date 3-11.09 By f~~ ~ ~ Category LATERAL ANALYSIS Project No. 2b93 Sheet ~~ ~ O~ e,~~ 21608 N.E. 49th Circle Vancouver Washington 98682 ~4ra1 En~~~~ Phone: (360) 600-6084 Fax: (360) 944-0538 Right Elevation Shear Walls Wind Force P:= 3102.16 Length of wall L:=14~ft+11ft+4ft+4ft P Shear v:= L 4 ~ft Overturning Mme: P•9•ft•33 ft Moment (`}'ft)z Resisting Mr:=.6•(15~psf~23~ft+10~psf•9~ft)~ 2 +500.16~4~ft Moment MoC - Mr Holdown = -176 I b Force 4~ft Left Elevaton ShearWalls Wind Force P = 3102~Ib+ 154616 Lengthofwall L:=22•ft+20~ft P Shear v:= ~ Overturning 22'ft M~:= p.y.ft._ Moment 42•ft (22•ft)Z Resisting M~:=.6~(15•psf~23ft+10~psf~9~ft)~ 2 +500~16~22~ft Moment Mot - Mr Holdown = -237516 Force 22~ft P = 310216 L=33ft v=94plf M~ = 338416~ft M, = 40881b~ft P = 4&481 b L=42ft v=110.67 p1f O M~ = 21912 I b ~ft Mr = 7416216 ~ft ~del'SO Project A , 1 O - I -~ 2.-~ H YI Date 3- I1- 04 By Pry ~ ~ rn ~ Category LATERAL ANALYSIS Project No. 2~ag3 Sheet L-~ ~ . ~~ ~;~ 27,608 N.E. 49th Circle Vancouver Washington 98682 ~ e Leal En~~9 Phone: (360) 600-6084 Fax: (360) 944-0538 Shear Walls at Front Elevation at living Room Wind Force P:= 2613.16 Length of wall L~ 3•ft+5ft L=Bft P Shear v:= L~ v=326.63pif Overturning 3 Moment ~ ~- P 9 ft 8 3~ft)2 Momelig Mr~ .6~(15•psf•3•ft+t0~psf~9~ft)~( 2 +500•Ib•3•ft Mot - Mr Holdown 3 ft = 2318.1316 Force Shear Walls at Rear Elevatio Wind Force P:= 4654.16 Length of wall L:=6•ft+8•ft+10ft+4ft P Shear v:= - L Overturning 4 Moment 28 N T'(t to (4'ft)Z Resisting Mr:=.6~(15•psf•3~ft+10~psf~9~ft)~ 2 +500~Ib•4•ft Moment //Mr ~-l Holdown = 833.9316 Force 4~ft Mat = 8818.8816~ft Mr = 1864.516•ft P = 4654 Ib L=28ft v=166.21p1f plot = 5983.7116•ft M~ = 26481b•ft fiaerso l~~ rro~eet A N o- I ~ z-~ Date 3- l l- 0 9 By fk~ ~ ~ Category LATERAL ANALYSIS Project No. 2693 Sheet L ~ ~ G~ ¢~~ 2i6o8 N.E. 49th Circle Vancouver Washington 98682 ~~ral En~'9~ Phone: (360) 600-6084 Fax: (360) 944-0538 fiaerso Project A {~ O - I "I z~ Date 3-II• 09 By Pry ~ `~ Category LATERAL ANALYSIS PTO~ec[ No. 2b93 Sheet L I° ~ Gr, ~'~ 2i6o8 N.E. 49th Circle Vancouver Washington 98682 ~ ~ bra] Eng~9 Phone: (360) 600-6084 Fax: (360) 944-0538 ~~OF F~.AM ~ N (~ Inld = Is psF W~ =25psF o 4 ` z ~ 1 o ~ i N i o 0 4 {~ . , ~ C '~ ~' o O ~` ryi ~~ vi + ~ } ~ i i O _ _ \ __ _ __ ` i i i ________________________~ ` o i , \ \ i i ~ ~ i ~ i ~ `\ ~ i ~ \ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ /g l ~ ______ I \ _ ~ __~__ ~ ~ 1 l _ • (..'d s 31~1r ~c{r w,. = 3x25 s1a 1+A 1770 Project ~K Q I~ Z7 Dat~ D By Category ~f~M4tJ(~ P oject No. 21.93 Sheet F-I ~ ~fi zi6o8 N.E. 4gth Circle Vancouver Washington 98682 ~ ~ 4 Phone: (360) 600-6084 Fax: (360) 944-0538 ral En~ "('tapcl~ Boor= l,oaoS 4xs @EL12 Qldl~l~ MA R . ~~~ ®. ~. ~~ ~ ,---- u 4X9 rYp _ ~. ^ OPT • RO CAR II F~~~I ® f$EAT ROOM GB@s~ IC ~I { 4Yte II i~ 8 N~r~ 4xg 11 ~_.~;--------~; ;~ 1 I. jG II (((iii % .~\ I II ----___-_ ____-_-~-----------------~_m etfiNV2 ~ •~' ~•• ..~_....__-_..~_ Pe 'C 4xi2 -------~ Xl't ~xio ~+~0 Project /ql{O I'12'I 3~~/09 liy ~~ Category ~ILAM I rI (~ Project No. 2ro93 Sheet ~=2 ~ ~ '~ ~' 2i6o8 N.E. 49th Circle Vancouver Washington 98682 6 ) F 8 -0 ' ~ral Ent` ax: (3 0 53 944 Phone: (360) 600-6084 Multi-Loaded Beamf 2006 International Building Code (OS NDS)) Ver: 7.01.10 By: Anne ,Anderson Structural Engineering on: 03- 11-2009:3:16:12 PM Protect: AHO 1727 -Location: GDHR - 3 car Summary: 5 IN x 9.25 IN x 9.0 FT / #2 -Douglas-Fir-Larch - Drv Use 3 . Section Adequate By: 9.0% ConVolling Factor: Section Modulus /Depth Required 8.86 In Center Span Deflections: DLD-Center- 0.06 IN Dead Load: Live Load: LLD-Center- 0.10 IN = U1081 Total Load: TLD-Center- 0.16 IN = U664 Center Span Left End Reactions (Support A): LL-Rxn-A= 1125 LB Live Load: Dead Load: DL-Rxn-A= 707 LB Total Load: TL-Rxn-A= 1832 LB Bearing Length Required (Beam only, support capacity not checked): BL-A= 0.84 IN Center Span Right End Reactions (Support B): LL-Rxn-6= 1125 LB Live Load: Dead Load: DL-Rxn-B= 707 LB Total Load: TL-Rxn-6= 1832 LB Bearing Length Required (Beam only, support capacity not checked): BL-8= 0.84 IN Beam Data: Center Span Length: L2= 9.0 FT Center Span Unbraced Length-Top of Beam: Lug-Top= 0.0 FT Center Span Unbraced Length-Bottom of Beam: Lug-Bottom= 9.0 FT Live Load Duration Factor. Cd= U 1.00 360 Live Load Deflect. Criteria: U 240 Total Load Deflect. Criteria: Center Span Loading: Uniform Load: wL-2= 250 PLF Live Load: Dead Load: wD-2= 150 PLF Beam Self Weight: BSW= wT-2= 7 407 PLF PLF Total Load: Properties For: #2-Douglas-Fir-Larch Fb= 900 PSI Bending Stress: Fv= 180 PSI Shear Stress: Modulus of Elasticity: E= 1600000 PSI Adjusted Modulus of Elasticity: E-Min= 580000 PSI Fcyerp= 625 PSI Stress Perpendicular to Grain. Adjusted Properties Fb' (Tension): Fb'= Adjustment Factors: Cd=1.00 CF=1.20 Fv': Fv'= Adjustment Factors: Cd=1.00 Design Requirements: Controlling Moment: f"1= 4.5 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controlling Shear: V= At a distance d from left support of span 2 (Center Span) Critical shear created by combining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Sreq= Area (Shear): Moment of Inertia (Deflection): S- Areq= A= Ireq= 1080 PSI 180 PSI 4121 FT-LB 1539 LB 45.79 IN3 49.91 IN3 12.82 IN2 32.38 IN2 83.44 IN4 230.84 IN4 ~3 Multl-Loaded Beamf 2006 International Building Code (05 NDS)1 Ver: 7.01.10 ev: Anne ,Anderson Structural Engineering on:03-11-2009:3:18:45 PM Project: AHO 1727 -Location: HDR Summary: 3.5 IN x 9.25 IN x 9.5 FT / #2 -Douglas-Fir-Larch -Dry Use Section Adequate By: 92.3% Controlling Factor: Section Modulus /Depth Required 6.67 In Center Span Deflections: Dead Load: DLD-Center= Live Load: LLD-Center- Total Load: TLD-Center- CenterSpan Left End Reactions (Support A): Live Load: LL-Rxn-A= Dead Load: DL-Rxn-A= Total Load: TL-Rxn-A= Bearing Length Required (Beam only, support capacity not checked): BL-A= Center Span Right End Reactions (Support 6): Live Load: LL-Rxn-B= Dead Load: DL-Rxn-B= Total Load: TL-Rxn-B= Bearing Length Required (Beam only, support capacity not checked): BL-6= Beam Data: Center Span Length: ~_ Center Span Unbraced Length-Top of Beam: Lug-Top= Center Span Unbraced Length-Bottom of Beam: Lug-Bottom= Live Load Duration Factor: Cd= Live Load Deflect. Criteria: U Total Load Defied. Criteria: U Center Span Loading: Uniform Load: Live Load: wL-2= Dead Load: wD-2= Beam Self Weight: BSW= Total Load: ~ wT-2= Properties For: #2- Douglas-Fir-Larch Bending Stress: Fb= Shear Stress: Fv= Modulus of Elasticity: ~ E_ Adjusted Modulus of Elasticity: E-Min= Stress Perpendicular to Grain: Fc~erp= Adjusted Properties ' Fb'= (Tension): Fb Adjustment Factors: Cd=1.00 CF=1.20 ' Fv': Fv = Adjustment Factors: Cd=1.00 Design M= 0.05 IN 0.05 IN = LI2298 0.10 IN = U1110 475 LB 508 LB 983 LB 0.45 IN 475 LB 508 LB 983 LB 0.45 IN 9.5 F-f 0.0 FT 9.5 FT 1.00 360 240 100 PLF 100 PLF 7 PLF 207 PLF 900 PSI 180 PSI 1600000 PSI 580000 PSI 625 PSI 1080 PSI 180 PSI 2335 FT-LB 4.75 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 ConVOlling Shear: V= 826 LB At a distance d from right support of span 2 (Center Span) Critical shear created by wmbining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Sreq= 25 95 IN3 Section Modulus (Moment): S= . 49.91 IN3 Area (Shear): Areq= 6.88 IN2 A= 32.38 IN2 Moment of Inertia (Deflection): Ireq= 49.91 IN4 1= 230.84 IN4 F-~ Multi-Loaded Beamf 2006 International Building Code (05 NDS)1 Ver: 7.01.10 Bv: Anne ,Anderson Structural Engineering an: 03-11-2009:3:19:18 PM Project: AHO 1727 - Location: PB Summary: 5 IN x 9.25 IN x 16.0 FT / #2 -Douglas-Fir-Larch - Drv Use 3 . Section Adequate By: 10.5% Controlling Factor: Section Modulus I Depth Required 8.8 In Center SDan Deflections: Dead Load: DLD-Center- Live Load: LLD-Center= Total Load: TLD-Center= Center Span Lefl End Reactions (Support A): Live Load: LL-Rxn-A= Dead Load: DL-Rxn-A= Total Load: TL-Rxn-A= Bearing Length Required (Beam only, support capacity not checked): BL-A= Center Span Right End Reactions (Support B): Live Load: LL-Rxn-B= Dead Load: DL-Rxn-B= Total Load: TL-Rxn-B= Bearing Length Required (Beam only, support capacity not checked): BL-6= Beam Data: Center Span Length: ~_ Center Span Unbraced Length-Top of Beam: Lug-Top= Center Span Unbraced Length-Bottom of Beam: Lug-Bottom= Live Load Duration Factor: Cd= Live Load Deflect. Criteria: U Total Load Deflect. Criteria: U Center Span Loading: Uniform Load: wL-2= Live Load: Dead Load: wD-2= Beam Self Weight: BSW= Total Load: wT-2° Properties For: #2- Douglas-Fir-Larch Bending Stress ~ Fb= Fv= Shear Stress: E_ Modulus of Elasticity: E-Min= Adjusted Modulus of Elasticity: Stress Perpendicular to Grain: Fc~erp= Adjusted Properties ' Fb'= (Tension): Fb Ad)ustment Factors: Cd=1.00 CF=1.20 ' FJ: Fv = Adjustment Factors: Cd=1.00 Design Requirements: M= Controlling Moment: 8.0 Ft from left support of span 2 (Center Span) Critical moment created by wmbining all dead loads and live loads on span(s) 2 Controlling Shear: V= At a distance d from right support of span 2 (Center Span) Critical shear created by combining all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Sreq= Area (Shear): Moment of Inertia (Deflection): S- Areq= A= Ireq= 021 IN 0.30 IN = U641 0.51 IN = U379 600 LB 416 LB 1016 LB 0.46 IN 600 LB 416 LB 1016 LB 0.46 I N 16.0 FT 0.0 FT 16.0 FT 1.00 360 240 75 PLF 45 PLF 7 PLF 127 PLF 900 PSI 180 PSI 1600000 PSI 580000 PSI 625 PSI 1080 PSI 180 PSI 4065 FT-LB 935 LB 45.16 IN3 49.91 IN3 7.79 IN2 32.38 IN2 146.30 IN4 230.84 IN4 F- 5 ~OJ~.Ip pc[.IoN 1 r ___ __ ___ __ __ __ __ ___ __ __.__ ___ __ ___ ___ I I I I II I j l 1 I I 1 I 1 I I I I 1 ' 1 I I I I I I I I I I I I I I I I I I I I lII I I; I 1 I I 1 I I I 1 I I i ~ tl I I I I I I I I 1 I 1 I I + I I I i I I I I V> I I I 1 I I I I 1 I I I~ I l l l l l l l i ~ I l l l li ~ 1 1 h A h h • M h h - h ! I 4 ` I I I 1• Ij I 1 I ~ I I I I I I I I I I I I I I I II II 1 11 1 I 1 I I 1 1 I I 'I I I II ~ ~ I II ~~. ~ .~ ___ l _ __ ___ ____ ______ I h ~ I r-----~-- " 1 I I I Ilii l i I I I I I I I I I l II II I I I I I I I I II I II II 11 I ~ ( I I I I _ I I 1 II~~ I{ `_~~ h _ h _ ~ I~ II~~ ~ ~ 2BX2gX12 ; ; I 1 ~ ~ I I' 1 Ilia ~8ao ~ ; ' ~---------- -- -- -- ---~ . ~; ' I; II~~ I' .' ~~ __-___ . r ' I i . i ' L'--'--'- X 1 1 -------'-----'-- ' I '1 i , i I _______ - I N ry ~P1+~ O Project ~ ~ ~ ~72~ Date 3~6~09 By~~ Category ~(LAMIIJ~ Project No. Zv93 Sheet F-(o a ;~ zi6o8 N.E. 49th Circle Vancouver Washington 98682 -0 8 60) F ( ~ moral En~9 944 53 ax: 3 Phone: (360) 600-6084 Foundation Dedan Soil Bearing Pressure SBP:= 1500~psf (assummed) LARGEST ALLOWABLE POINT LOAD ON 12" WIDE PROCTOR FOOTING -ONE STORY HOUSE: total engaged area A:= (18 In + 6•in + 18~in)~12•In A = 3.5ftz Allowed Load SBP~A = 525016 ALLOWABLE LOAD ON PAD FOOTINGS: Size Area 18"diameter A:=9•In•9•In•3.14 24" diameter A:= 12•In~12~1n~3.14 20'k20° A = 20~In~20~1n 28'k28" A:= 28~In~28~1n 32'k32" A:= 32~In•32•in Pall = 264.9.416 Pall = 471016 Pall = 4166.716 Pall = 8166.716 Pall = 10666.716 ALLOWABLE LOAD ON CONTINUOUS FOOTING: Capacty Pall = 1500•psf•A Pall := 1500~ps"f~A Pall := 1500~psf~A Pa11:= 1500•psf~A Pall := 1500•psf•A 12 Inch wide: Capacity 1500 psf X 12 Inches = 1500 plf el+s Q Project Q N 0 Pl A N 1'127 Date 3-II•oq By Ate' ~ Category ~Ra.M(n-C~ Project No. 293 Sheet F7 ~ 'tti+A ~ 2t6o8 N.E. 49th Circle Vancouver Washington 98682 ~'ral En~t' Phone: (360) 600-6084 Fax: (360) 944-0538 U O U ~i F U d e ] ~ o a~ s~¢° ~, 3 a o ;: • "' ~ N {A rj ~ O z o `° U N N ~ v Vt , o ~S~Q iw m g k_oa Sm ~ ~~°~ ~d ~ B a ~t3 p w w o'a i ~ o ~aw§ ~~ ~ ~ ~~. o w°'yo aZ ~ ~ ~ (~WQy rc w m ~ ZZ (Fj1 N rV- 0 ~ ~~ 1~ ~ZOu w~ ~ ~i ~~ ~_Q~ WW nn a a OJem a ~N Q ~ ~L~1 NB Z m N3 Ra ZOr NZ U pW ~~ (lU3 ~m° m 4~ ~ uw m~~ ~ ~ ~~ ~a~~ g itQ~ °1~ o~ ~ ~~~ ~ ~~m ~~ ~u "~ ~~~~ ^4'L~ 00 ~u rU r~LLzQ W~ t)~~ °~m ~~0 ~~ ~~, N Q X 0 W~ ~o z ~ff~ d ~~o wz~~ a~~~ 00 g~go u~ ~~~ ~~~~ Fmk .wa 3~a ~~m ~~ ~~W~ =33 ~~~ C1~~ mj ~a~ ~~a N rc ~:; u$p °~a jNW Vryam rc 0 Qa~ LL b(g~5 a6 g ~6~ ~~ ~,o~ ~, ~: Q nOadd~~ ~~~~ ~ ~' o ~ ~~W~kw~~ m ~ ~~~ ~~o m~ ~~~~ ~ a9~ ~_o~ ~ L~ ~~~ ~gbp ~g~. E ~~ :~w RR ~~ KF ~ ~ ~ ~~~ ®- u § S 3~~~ E ° U alY°~~ ~~~ ~ g ~a ° ~ISZ~ ~~o~ ua a . ~} G ~~ a ~a 3m Frl ~~ ~~w p~ ~QU dma boOa ~Ud ~L ia~ ~~~ ~~ a~ ~~ s° In a m~ ~_ 00 ~~ mp p ~L w ~~ sU 3 ~ ~ ~ w l~~ mrc 3 fi rc az b w w °~ ~ "~~ Om ~ w~ m~ z ~ w U m ~~ ~ N m'~ WW ~~ Q (((~~~ Z Ory Qy°I yU~O a a w~V ZO ry ~ ¢ O UZ ZT ap ~ °~ ~ mp pm d g~w o~ ui? Wm w ~S z~~ ° oo A u k o o~' ~ va ~~~ a ~ ~~ m o a a~ z~' ~ o~~ ~~ ~ y~yw~ ~~ m^^~? ~~ Z i1tt2 °U L Yk 3i~ a ~,LL ~~ ~ ~o~ =0 Q, °ap NU a\I ~~h ~~ ~i Zm3 ~~ ~'yQ 4~~ WW j V~ou og ~ ~~a~ ~~ ~° r~w~ e~ ~~ ~~ s ~ wg ~~ g~ ~w zw ~ Lp ~a~r >; pmi°_u rc~~ ~~o ~~~ro =~~ ~~~p ~~~ Q dGr ~~~_ o~~ Zp~°~ mmWmO w~m Up~ u~ow°~ ~=o ~~~Qg ~ON~~W az~ °~W R' N m~ U p,LLg~ ~~w ~~°~ ~°w§u ° aN&~~~ w~Z: w~wm :~~ww. NUL i~.~w mu~n ~~~ ~u~ ~_~~~ §mdt~~ ~~~ a~~z ~wood~ ou^ ~~~~ ggz 77u~~Quu lS~ rc~~o hmga~d 4'g~ ~zN~ tt77 m~k 3~ i-~_ ~s~~~a m~~ n~.~ a m g "~ N j ~W f o~ ~ ~~' m s 3°~ i z~w a ~~ ~ ~ aU~ p u`~ N m ~ a~ v ~Pa o =1t a ~ zmy o a o $ ~ w~~ e ~zm a ~S m a aLV ~3~ ~~ ~~~ ~ ~ ~0~ ~ N l' j a uY pYi GQ 4~ U j WOpm V >o~~ ~~ aVQ ~ U Qylp U UU_.m(W1y ~ NLN u a ym~ _ Y ~W yoO SF~ W ~ W~N W` ~pw~ am wr ~ ~ oa~ ~¢ ~~~~ Vw 3p~ ~ ~~ ~wo ~C m~~~ m~ mss m ~s mo= ma ~~ ~o ~~ ~ tpi~ ~ ~o ~~~LL~~ o o '0 w L p~ N aw ~ wg ~ ~° ff 0 LL W Wj i~ WV j a a ~F 2 a NOQ m~LL ° rc~ds ~~ ~"-~~ ° i~8 0~ ~O x a a.o 2~ n~~ ^'~~ a p ~ o ~ ~~ w ~ m ~WS LL w a o~~ 0~ N m ems wo ~ a~ ass ~~ ~~ ~°9 ~~ m ~Q O~- oLL ~ o~ F ~~ ~ ~~ ~~~ gg c ~8 ~ 3~3rc 'kt§u ~o w 6~ W~a s z j ~i pz ff~ ~ Q~, ale wa °" ~LL^ ? ~s ~~o w $w ~ dm CLF 1~ U z w O ~~< N ~ ~ r ~ f z E Q ~ l ~:Q 0 ~ °~o a~ gW~ o~~ p~~ u~ ~~l1yyy4 ya4 myi~0 3 (~1yLLy1jj~~am~ZQVVU~~II Nii O I{II V ~a~V F m_WWWr Q ~ia~4~m~go~~?Q233., ~ ~ m a W 4m V O~JI Y~~~mWWWJ~rLL'LL' ~{ z a'^ u Q LL~i~L£E:z iiOaa~a~~ rc ~W° w °~ } ~ w ~' ' `z ~a~ 0 a a ~ w d j u~ W ~~ LLQ~ ~~= wa w ~ Q~LL j~~ ~ ~ ~~ ~ ~ ' ¢~ YYw ttw ~ ~ ~ qw ~~ Z°` o u~a mi >a~ww ~i~~z~ w~~u~w=u~~ r~ aic~~mmmus~~~~owwu~°w,~,~ y aw~ W~~i 8 3 urx uY~a U1-w,dma~itl~44 u~~ ' am ' m aa uoowwwwwLLn a a mm m u NOllly/~313 1NObd ~ONI ~N0110f4~1SN00 Ofi'G (1d31J LZLI w N'dld ~V~ 7NI'I Ivon~rmisw~ onv emac ®Lnrna,ldm 3-NJS laO1SlQ AVLI S3s63Dad 1l~IlJfl'J -cudsb swlsw>I'+la a3rvx asb 3~n3a3a3ze anon srolsrv3wa N3111 a3n -as3a 3n1 of Id311 Laod3a of aro 61tl1$sl W m Sa0aa3 Ei'J! `FAIYJ Ol L'aOllfl2 iYJ ~J01JVtllN/`J 3ML'.0 ullrelsx~3:13r1 sl LI aorma L6w09V 33lMMVM lOHN~ Jai -~S3a 311's~3 319WW13 01 Ndld SIHL i1 N01102tld3eb 311 NI 3x41 Ia>9 fiVn 1d.3LLV 1L3n3 3l MJI191119~ d0/@N 6340'J 1V'JOl @M s3am aumlrti ~mnuvn nLn aaro -tuna w 3roa 3e Lsru ~ - ~w'I rouau -LSWn arv I.ar1 rolssll.erad n31 -11MT llIIXLLM O3JMOad3a 39 Ol LON 61 QNV AINO 9NIdl1f9 $ll i7 roI1~l61YA 3111 b1J 51 Mld S £6b0-bSZ (09£) Z99S6 tlh1 7annoaneA 101 alms i~If100 91601 3N Z [ SS oxl t >NOlionxisHOo E02[91'll .0-.1'.%'3l0'Xi rsarlise,seslL~u.NC d \OI1'd~313 l~iil?J ® Il_i ® ~ '_i'J501L "YY. d'49 '-l C ldO if P"i Lrt 3JVV>JYJ '1~ 0562 `X?Y'_b ()3d3nOJ ? 'a ISIS 'a cs uu aoold wr.l CN'G -$fGH ~9tYlOCd 3E Ol S°J E00C9i 11 lS4(I1S 8/5 Z6) LZLI .NVIo Lwaa scavoe L31AOJ >*'9/5 ilrn Ll+oa-, 3*Ill 9allla'~_ r~l:do _ Ivns_ ro-=o rvauve ~ ~voe .L-.u awl a~a~.a ~~[ =; arvro 3mavo 6~ CONSTRUCTION l iNC. PLAN• 1T1T (91 5/8 STUDSJ II.Ibl0w3 OPTI~'4 3 cdR GdRY E LEA T ELEVATION PLAN•nzTrszs/asruDS/ 5512 NE 109th COURT Suite 101 Vancouver, WA 98662 (360)254-0493 s xdN Is EcR THE fLTJETRICTKN cF ae &IILDIIG aiLr AND Is Not To eE REPROWCED wrtuour wRlr- TEN PERnlsslai ERCM duD caasr- TaerICN I, rtw. . uxx rust B= oaaE M dccora- a<E wITH NAnoNAL ~ILOae woes am LwdL coDES duorcR fF.CNLATIRS. LE EVERY 4iTElYPT NAS BEEN tiCDE M THE PREPdRgTIW LE TNI9 PLA4 TO ELMINAIE EWdDRS, THE DESri- NER CAN4Df WARAViEE XidMST EFROR li IS iVE RE °I81LIY a THE ccRTRACTax oR BuaoER ro d'A TO REPCRf TI¢M TO THE DESG- NER IiIEN OASfN51CN5 H4VE FRcC'DENLE O/ER PALED DIYENSI(MS REPRO- pCTION PROCESSES Hdi DISTIX2T SCdLE. CO?YRIGHT ®]099 dH0 CCNSTRICTIGN I, INC. ~T1.3 PLAN • Il2l (LEFT) AHO GONSTRUC T ION, ING. RFdR FI FvdTION RIDGE LTE IB'-6 15/16' CONSTRUCTION 1 INC. 5512 NE 109th COURT Suite IOl Vancouver, WA 98662 (360)254-0493 5 PLAti IS FOR THE LQ151RIGiIQJ OF pff &IILDTJG ONLY A`ID IS `IDi iD 5E REPRDDUCED wrtucurwRlt- iEN F£q'llsslGN FRP'1 dH0 CRLSi- aicrall,MC. zs To ee FooTA~E '-OUSE AND rmw FLOaz: Dll $o VISIBLE COVERED F'^v~RLN-. QB `a]' ~, G-dRYaE'. bl 5p. Fi. GPi 3GD G4RK-E- }d9 $D. Fi. 3''> RIG-~=T ELEVATION PLAN" nzT rlma s/a sTUOS7 SCALE Y'•I'-0' II'6]09° - L1Jp. MAST BE DONE M 4CCLfm- NKE WiH NdiIONAL &IILDMG CODES AYD lOCP1 CODES AfQ7/Pi REGIILdiIp15 LE EVERY ditEFQ'l NA$ E'£EN MACE N THE PREPARATIW CF iH15 PLAN i0 ELRiPld1E ERFORS, THE CESG~ NER CAM1Y01 CNARAVIEE dGAMSi I ERPIXL li IS THE RESPONSIBILrtY CF iHe CRIiRdCiCR GR Bl11LDER t0 CIEIX FCR E,070R5 OR OMI%IQ15 AYD i0 REFVR' ! TffN .O iHE CESG- IffR ITIEN DIIT1151q!$ HdVE REC=DENCE OVER SCdLED DR£NSIONS. R=Pfd~~ gCiION PROCESSES HdY DISiORf Y?LE. COPYRIGHT 8l¢03 AHO CCNStRllGTILN I, INC. ,~~.~ PLAN' Il2l (LEFT) AHO CONSTRUG i ION, INC. FRONT ELEVATION PLAN" Il?- (IB4 5/8 STUD57 11165° CONSTRUCTION 1 INC. PLAN' Il7l 1104 5/8 STUDS) 1116]003 GPII(.N4 i GGR GLRAG= LEFT ELEVATION PLAN•n4~/Im45/asruos/ $C4E: ~'• 1'-0' 1116]099 5512 NE 109th COURT Suite 101 Vancouver, WA 98662 (360)254-0493 i R W 19 FCR THE LR151gICiKl1 Lf Olff 2UILDMG ONLY AND IS NOi i0 BE (EPROgIGED WITHOUi LLRIi- lEN f£p'11551LN FR'a'1 dH0 WJ.ST- gILiIGN I, ML. . LGR. TLST BE DQl A' ALCOWI- A'CE WTH NATIONAL EUIIDMG CODES PND LCCdL CWES.4VD/GQ f~GIILATKT~S. LE E~ERf 4i1c`IPi HAS BEEN NADE M THE PfEPARdiIGN Cf iH15 PLAY i0 ELRiMdTE ERRORS, THE DESG- NER CAMIOi WARNREE GGAMSL ERROR IT IS i:E RESfq~SIBILrtY 6 THE LGNIRALTg2 OR &IIIDER i0 LHEIX FLR EWQI.R OR LHI%IONS dtD i0 REPORI TIF11 TO THE CESIG- NER TTEN DRfrN51GN9 HdVE FRELEpENLE OJER SCALED DRIEKSICfLS. RcNY- pKTIGN PROCE53EE HAY DIETIXtf $LdLE COPYRIGHT 8 ]¢0B dHD GpJ5TR11CTILN I, INC. r~ ~.~ PLAN' Il2l (LEFT) ANO CONSTRUCTION, ING. ar=ea >=i Fvarln>` SCREE~.ED F0.nDA}Ipt vENIS n sa. n. FER Iso sc. Fr. cF FOLNDGTION GRE 41 I I I I I I I I I I I I Joys.. 3: o.c. ..m- ii - 3EGn PGCKEi9 W/IR' LIRSPAGE 3~ nlNlrnn eEARIw ~A I II I I I I I I I I I III i I I I JJyL~? i I !L i J i /~ Li-E~i ''i l =-Ty Ji-{TT'-J--iµq TT I I I -~ IvI HG1E pl ]CP Gi dN F'f'MI WSS~F£LTBER£~V CGT1._ I I orze/i cw II. La CP/ i AL BAIN I ~ I (i l8 bk B"JRA.. PApS I I O I I I I AIFJ I i I I m I I i0/L'ICCCAFId. d~ cR/LL ¢ysusm BmN C eaav °-_I'unF~e~ z IC'I` I I ~ e<hw src earw i }I I _ _ J is-a I I I I I I I -iEnOVE ?CCTIKa AVG ~~'~~`E I-VB'-~G DEGKh'G GN FdJNDAtIpI StEn W4__ B EFGINECRED JOIEi WIFH TH,RD CAR OPTILN i ~ (S1E nGVFA2i11RE5 J019T LCYDr) I l ~ I i l I I I I I 11 I M1 I I d'.35D0 Pil COrvC. SLGB i '.JN CGnPACTEJ GEAVJLA3 FILL ~ III} W/I/B' PEi FOOT SLOPE i0 DOUR '~ ~ ! I ~ III N I I I I I ! I. I i _ _... C L _. _- I ( MI PL=V°li?l 939".0E3 CONSTRUCTIONIINC. 5512 NE 109th COURT Suite 101 Vancouver, WA 98662 (360)254-0493 iHls R4J Is EGR THE CONS¶d1CtbN CF C!E EllILDIlG ONLT AND IS NO} }O BE F£FftOgICED WITHOJi'Ntli~ tEN PEfdII551LN !'RP'1 AMO CR15T- RCi ON I, INO. ALL LKR'C tW3i BE DONE M ACCfiF:J- AWE WTH NA110VA'. BJILDRYa LODES A~9 LOCAL CODE9 Am/OR REGIILA}Ip15, LLHILE Ey£Rf 411E`IPf HAS SEEN MADE M iNE FREPAWTILN OF THI9 PLA4 TO ELRIMA}E EIF[JPS, THE DESG- NER CANY)T (fJARAN}EE AGAWSi ERROR IT 13 LVE fE`FtlN51BILltt (F THE COVTRACTCR OR 511LDER TO CVffIX FOR ERROR" OR CWIISSICNE NO i0 REPOKi i4£M i0 THE DESG- NER WRITTEN D11ENEtp.45 HAVE PRE4DENCE OvER SCALED DR£NSIOW. f~FRO- DJDTICN PROCESSES MAT DISTORT xALE COPYRIGHT ®}000 4H0 CIXJ51t31CTIGN I, INC. ~_2.~ PLAN •Il2l CLEFT) AHO CONSTRUCTION, INC. FOUNDATION PLAN CONSTRUCTTON I INC. 5512 NE 109th COUA"C Suite 101 Vancouver, WA 98662 (360)254-0493 4. 5 Rdl: IS iOR t4E COJSiR1LtION GF ONE &IILDIKa ONLT AND IS NOi TO BE REPRI~JOED WRHLVt LLRIt- iEN I£,@11551LN iRR1 dH0 CLNST. pICTILN I, MC. . uaac rust eE DoI.E IN accora- NCE WiH YATIgL1L 9ULLDRG CODES ND LCCN. CODES AVDttR f$fiJLAiKNS. LE EVERT AilErpl HA9 SEEN ItdpE N THE PREPARATON Oi THIS RAN t0 ELR1MAtE E~Dq, it£ DESG- NER GdK101 WARANfrE dGAPLSi ERA' R R IS LVd: REYi~151BILRY GF THE CON1RdCTOR p2 &IILpER i0 GHEIX FGR ER6Y~S:a OR OI'II%IONS d1.D t0 REPORf iHEH'O Tff DESIG- NER OVER EOdLED DIrENAUAi R=_FRP g1LTICN fFLCE55E5 MdT DIStORt OCdLE. COPYRIGHT ®1008 AHO CgJ5TR1CTION I, INC. ~~.~ PLAN' I12~ (LEFT) ANO CONSTRUCTION, INC. IHnlu a nno AI nu I'-9• PTTC dCCF99 PA%PGELAT !R?3 YENi9 d5 FER C1AF d o d ~ a 0 ~~ ~~ o ID o~ \ `--- a 11 ~I1]f£J 0 1 - MdN 0.00R LME ....._.._ PC%M LRE ~~~=~ GIVER ifdL:S IOF 1-'L,~1N PLAN• 1128 VB' . I'~m' ILW 1009 R05 VENTS 69 F£R f/AE S.Q YrhVPACTNRED 1Po199E5 ~ 34' OL. F Q R-30 M°.AILATICN R-3B IN911LATIR.' R-30 AT VNJLTS R-30 AT vFLLT9 005 13 ' DRl"WdLL GPTIQNL VA1Li 6HOL1 LLL9 I CEILINGS T f~ MASTER ~~ BEE ELEVATION ~ w_ PLANS PGR EM=RIOft ~~ PMISHES DINING ROOM wp BED 2 MASTER ~ 44 PLATE LN 4x< P09T QJ EIBxO CGNC. PAD W/ 55~ FELT BETL£EN POST 1 GLNGRETE PLAN • Il2l BUILD ~NC~ CROS~J' -SEOT~ON - ~ PLAN • I12~ IIK]mD9 gCALE I/4'.I'-0' 11.161mY] ~~~ CONSTRUCTION 1 INC. 5512 NE 109th COURT Suite 10I Vancouver, WA 98662 (360)254-0493 iHl9 PLAY 19 POR THE CLNB1R1LtION Lf CTff &11LDRIG ONLT dND IS NOT ro BE REPRODUCE) WITHPlt LLRIt- TEN FEFSfISBICN FRCH 4H0 CCNBt- 2Ci'ONI,INO dLL II4RC I'AA9i BE DOSE M A000fm- dlCE WTN HdTIONAL W ILDPG CODE dtO LOCAL OWES AND/pi FEGULdTILNS OHILE EVERY diTB'PT Nd5 BEEN NdpE PI THE f'REPdRATION LF Lu15 RAN TD ELR1Md¢ EFRL£], iNE pE9G- NER CdNgf GIIARANIEE b+dMSi ER, aR li 15 THE RESPCNSIBILRT Lf THE CLnfRACTOR OR d11LDER LD C10:IX FOR ERA OR CMIBSIONB AVp TO REPORT R4S1 TO i4ff DEEKa- NER WRITTEN DR^EN51CN5 NAVE FfL-CEDENCE OVER 9CdLED DIL¢N51R:5 REFRO- DICTIGN FR'KEBSEB ttAT DISTORT 9CCLE COPTRIG-HT p ]P.OB 4H0 CON9TPolCTILTI I, MG. I .Y3 PLAN " Il2l (LEFT) AHO GONSTRl1CTION, INC. 'TELL CODE ILI4G '-I p• JTL 91OMG ER c. E iVF_D fdXX '.G Iffl1CRAVE 9MGLE 9Tpii HOMES EW 11ER CPdi gPPRw idK FIYFi lEOdfm EP'£R i 9CREL FLEXIBLE WAtER CRM. 9EI°J'lIC 91RAFPRG ENCIRCLMG t44K FROM BDTH 51DE9 FLEXIBLE Gd9 CQ+TL gNCUCR wd-R uEdreR .O BA9E-B/SE i0 FLGV'R RgISE eILOi LIGHT b' dBOVE FIN. FUR dFPMG ELEVATION yIEUJ AHD CONSTRUCTION 1 INC. 5512 NE 109th COURT Suite 101 Vancouver, WA 98662 (360)254-0493 5 FlN: IS FOR THE CQVSTRICTKN CF ONE &IILDRw CNLi q`ID Is NOi TO BE REPR-J'JCED WITHdJi LLWi- tEN PER71551R~1 FRq`i dVp LCNSi- pILTILN I, MC. - YURC IA5T BE WTE M ALCLRJ- 4V~E WTH NdTICNdL ?UILDAG CODE A"9 LCCN. CODES AIJD/OF REGNLdiIp15. LE EVERT gT1E'iPl HAS BEEN MADE M THE PFEPq¢4TION CF iHlS RdN TO ELMMd1E ElAOR9, THE DESw- NER CdINOI GIgRAVTEE dGAMST ERROR IT Is THE RE°.F0r441BILIY LF iNE CLNTRdGLGR OR &IILD`_R i0 GHEIX Fq2 ERR<JRS LR Cf11%IQ19 aro TD REPORT T~ErI ro THE DESw~ NER ITTEN DMENBILN$ HdVE fi~OEDENCE OVER °..CALED DII¢NVl(~5. REIRO- DucTIDN FxccESSES ndr DISiDRi scdLE. GOPYRIGUT ®3008 qH0 CGfJBTFJCTIgJ I, ING. ~~.h9 PLAN •1~2~ (LEFT) AHO CONSTRUCTION, ING. rec. n II c SIGRETE IN $PGLE $TGRI" HRff6 JbJp ]X6 L-va• x v LAG xlaw O RExIBLE WdiER C01.TL SIDE9 39 TEdR CQN091LKN pJ'4RG • 15• RiLi iM• osB sHEATHIrG nAV.FdGTIFED iR1154E9 R-30 BLdLYN NyJLdild Vl' GYP°JP1 BARD CEILRG 1%°^wLID BLO:XIIG LIM1£1.'i9 A9 PER LADE iRl% f/,T 1E`CtGRS AS PER (ADE (]13x6 tLp PLdiE <rB GPEI:M'i HEADER'L/1-916'CEILIII'a HEIGIfl9 (TTP) 4nU OPETIING HEdDER W/e-Wi' • 9'-I K' CEILRG HEICl1t5 (ttP) 1M' OSB SMEAtHPG • TTVCK' ITTP) VgPLR BAtRER 1 VMTL $IDRG (oR viol-RavK rTrn~ sIpMG) 3x6 WALL SND$ .16' OG R-ll BPiT N%YAibN V(' 6TPWI20ARD UALL9 Vl' PARII0.E BOgRD (WE,H REO'JIREDI i ve^ RTYY)pp pER~rtG ft-39 BAn °~W.AtIPI BL//X POLTETI*LErvE GROIND COVER ]nb $..L^ E RAtE 3x6 F!1-c°^~-11- RE 1t~AF~ 91LL RAZE O S/0'R I0' ANCWR BOLi9. 6'-0' OG Aim ngxmm n• FRrn ENO aF RATE A1D No aoEER THAN s-Im uo• x s• x va' BEdRRG PLArEs 6'rRNpdncN wdu5 (6' x m• ccNRNiRx Fmrme. • m •a rERncx • ae• ot. nRL P'RKKtAIEp ARAN PIPE WI Cp14lED R'N•'K R GRdY£L 3/a' H W IW dF+PQyvED FILLER YEMBR< NEiE REOJIRED) (]) tl cGNiMKL4 NOftIZQIIALB FLExIELE ILLdiER ORAL FI W/iLBOARp ]x4 LEWER $EISYIC SiRAFP RG ENCIRLLMG iA`K FRR'1 20tH 9bE9 RExIELE GAS CRM A4LWR WATER 1FAlER iO BAEE~BAEE iO R..GR RGI52 PILOT LGHi L9' aBOr~ PIN wR ~T "~ x--~15~I==~~~ ELE~/ATION yIELU CONSTRUCTION 1 INC. 5512 NE 109th COURT Suite 101 Vancouver, WA 98662 (360)254-0493 HIS %.dN IS GOR THE CCNSIRICTILN Lf DNE &IILDRG ONLY A4D IS NOT TO BE REFFOgCEO IIMi4YN1i Wi:i- iEN PERMI%KTV FRL1 M AH'J CONSL- pILTION I, MC LLL vA"%R15i BE DLn'E M ACCfAID- dNCE WTH NATIONAL BIILDRG LADES dNp LOCAL CODES NID/OR REWLATI(M5. RILE EY£RY At1E1'FT NA$ BEEN HARE M iFE PREPAFgiILN 6 THIS PLAY TO F1%MdiE ERRORS. iNE DESG- NER CAVJOi GJARq'J1EE dGPMSi ERROR IT IS i4ff RESFCMSIBILItt LF THE fLTi1RACtOR OR BJILDER LO CVEIX FOR ERRORS OR USISSIONS AYD t0 fEPCRf ifffM TO LHE pE5!G~ NER RTtEN D%ENSIONB HAVE Pf.£CEpENOE OVER SCN.FD DIt1EV51gJS f£R%'- DICi LN F4C(.ES'£5 I'IAY DISiC4f SCALE. COPYRIGHT ®]~B qH0 GONSTRJGtIGn' I. INC. ~~.I PLAN " Il7l (LEFT) ANO CONSTRUCTION, INC. _ ~m~ ~g ~g 1 aog~g~ L° frfr 0 ~~~ L ~ R $~~ m~ ~~ gg ~~ R3'~ 8 es•~ R~y ~~~ ~ ~ m ~m fl i~ ~ oa R ~ P T (~ m= ~~_ ~ o A D r r r~ D Z ~[~ ' A~ \L~ K~c~ fm°m mr. ~ 'o vo £° pp~ ~ ` vi~ ~ ~ o p ~ ~ ~~ e 4 ~ Fz € ~a ° € ~~ m 7 a y ~ q N~ ~ ~~ ~ ~ ~ ~~ ~ ~ € m~ y wok a 9 ~n~ HEIGHi O4 d e x~s A r 4 ~~ 6m y zW ~U q ~k T~~ ?s°n -'~ ~€~ ~9o n~ oa~ 29$ CA :€ ~~ is 7 oT~ ~~^ S:~° oA ~i ~N~ ~~i R8 ~€ °~o ~ io ~ € ~ c p m~~~~~~o~~m€-~~g~F~ax~ 0 0 0 0 0 0 ~~~~~mg~°~€~~~~o~Fam c~ ~ a ~ a s ~£~~€2m~,~a~~maem~N ~ -9 a 9 7 9 s ~fA o3 A`~L ~aN ;~9°~8~9`e mo 8 ~ ~ S 8 €~ ~~ p~F~ °~~.~~t 8g ~ ~ ~ F~ Pa 5°. ~N C 3~ ~ R q R oR oR oR o ~ RG g m€ ~ m e~ „a Gi3"~o ~~ _: .~ v ~ a~ a~ g e., a'E~ n= o x o gg ~o a o e o o k F ~ Ra ~yzmG 3o R R% R R R ~: o ^~ : fi b ~o ~~ ko $ e e e e$ S • ~ 3 o m ~- y ~ o k 9 R R R R R R N QO s ~ ~'4 G~ 80 ~2 0 0 0 o a o ~Q a F ~'~€p 9tld G :, a C S ~ ~ Fg ~ ~Y~ ~s £y R R A R R R + ° o~ ~~ ~ m ~ ~ m m ~o P 3 ~. ° ~ PLANS AND NOTES e Anderson Structural Engineering d rso r ~~~ =: 4 ~ z ~ z ~ ~ en '~ 1 ti `` \ Aho Construction ? m 2608 N.E. 49th Circle Vancouver Washington 98682 4 H`£~yo; g Pian 1 f 2'] ~~a~ E~a~ Phonr. (360) 60o-6o8q Fax: (360) 944-0538 ~S ~ a