Traffic control plansTRAFFIC PLANS INDEX SHEETMOBILE WORK ZONE(TREE TRIMMING PROJECT)TCP SHEET 1...............................SHOULDER WORK/MINOR ENCROACHMENTTCP SHEET 2...............................SHOULDER WORK/SIDEWALK IMPACTEDTCP SHEET 3...............................ONE LANE ALTERNATING WITH FLAGGERSTCP SHEET 4...............................ONE LANE ALTERNATING WITH FLAGGERS - SIDEWALK IMPACTEDTCP SHEET 5...............................LANE SHIFT TWO WAY WIDE LANE ROADTCP SHEET 6...............................LANE SHIFT MIDDLE TURN LANE BORROWEDTCP SHEET 7...............................THREE-WAY INTERSECTION WITH FLAGGERSTCP SHEET 8...............................FOUR-WAY INTERSECTION WITH FLAGGERSTCP SHEET 9..............................CUL DE SAC - DEAD END STREETTCP SHEET 10.............................MIEDIAN/BOULEVARD INSIDE LANE CLOSUREPSEPUGETSOUNDENERGYTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGSHOULDERWORKW21-5UTILITYWORKAHEADW21-7X'X'ADJACENT AVEWORK STUTILITY
WORK
AHEAD W21-7X'UTILITYWORKAHEADW21-7 UTILITYWORKAHEADW21-7X'X'PLACE W21-7 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCED WARNINGAREASUTILITYWORKAHEADW21-7UTILITYWORKAHEADW21-7 X'X'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NTREELINELEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMOBILE WORK ZONETREE TRIMMING PROJECTNotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.NOT TO SCALETCP - 1 SHOULDER CLOSUREPSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 1 of 12
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGSHOULDERWORKW21-5UTILITYWORKAHEADW21-7X'7 11 11 71111ADJACENT AVEWORK STUTILITY
WORK
AHEAD W21-7R9-9SIDEWALK
CLOSEDR9-9SIDEWALKCLOSEDX'X'UTILITYWORKAHEADW21-7 UTILITYWORKAHEADW21-7X'X'PLACE W21-7 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCED WARNINGAREASUSE OTHER SIDESIDEWALK CLOSEDAHEADUSE OTHER SIDE
SIDEWALK CLOSED
AHEADNEAREST ADJACENT STCROSSABLE CORNEROR CROSSWALKUTILITYWORKAHEADW21-7UTILITYWORKAHEADW21-7 X'X'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 2 SHOULDER CLOSURE WHERE SIDEWALK IS IMPACTED28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 2 of 12
ONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4X'X'X'ROAD
WORK
AHEAD W20-1W20-7ASTOPFLA
GGE
R
STOPFLA
GGE
R WORK STkeep S/W openFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
X'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1ADJACENT ST
50' min50' minCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 3 ONE LANE ALTERNATING WITH FLAGGERS28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 3 of 12
ONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4X'X'X'ROAD
WORK
AHEAD W20-1W20-7ASTOPFLAGG
ER
STOPFLAGG
ER
R9-9SIDEWALK
CLOSEDR9-9SIDEWALKCLOSEDWORK STNEAREST ADJACENT STCROSSABLE CORNEROR CROSSWALKNEAREST ADJACENT STCROSSABLE CORNEROR CROSSWALKX'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1MAY RESTRICT PARKINGIF NEEDEDUSE OTHER SIDESIDEWALK CLOSEDAHEADUSE OTHER SIDE
SIDEWALK CLOSED
AHEAD
CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 4 ONE LANE ALTERNATING WITH FLAGGERSSIDEWALK CLOSED28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 4 of 12
16min16minRIGHT
KEEP
R4-7BRIGHTLANESHIFTSX'X'X'ROADWORKAHEADW20-1W1-4RX'X'ROAD
WORK
AHEAD W20-1W1-4RX'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1MAY RESTRICT PARKINGIF NEEDEDMAY RESTRICT PARKINGIF NEEDEDmaintain (2) 11' lanesRIGHTKEEPR4-7BW2-401CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NTREELINELEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 5 LANE SHIFT - TWO WAY WIDE LANE ROADNotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 5 of 12
RIGHT
KEEP
R4-7BX'X'X'ROADWORKAHEADW20-1W1-4RX'X'ROAD
WORK
AHEAD W20-1RIGHTKEEPR4-7BX'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1W2-401MAY RESTRICT PARKINGIF NEEDEDMAY RESTRICT PARKINGIF NEEDEDCENTERTURN LANECLOSEDCENTER
TURN LANE
CLOSEDCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NTREELINELEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP-6 LANE SHIFTMIDDLE TURN LANE BORROWEDNotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 6 of 12
ONE LANE
ROAD
AHEAD W20-4X'X'X'ROAD
WORK
AHEAD W20-1W20-7AONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAG
GERSTOPFLAG
GE
R
STOPFLAGG
ER
X'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1*See Sheet 4 for sign configurationif sidewalk is closedCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 7 THREE-WAY INTERSECTION28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 7 of 12
7 11 11 71111ADJACENT AVEWORK STONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4X'X'X'ROAD
WORK
AHEAD W20-1W20-7ABEPREPAREDTO STOPW3-4
X'X'X'ROADWORKAHEADW20-1 W20-7A BEPREPAREDTO STOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ER
STOPFLAG
GE
R
STOPFLAGG
ERSTOPFLAGG
ER
X'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 8 FOUR-WAY INTERSECTION WITH FLAGGERS(UNSIGNALED INTERSECTION)28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 8 of 12
X'X'WORK STADJACENT AVE
SHOULDERWORKW21-5UTILITYWORKAHEADW21-7FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
KFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETREELINELEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTCP - 9 CUL DE SACNotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 9 of 12
X'ROAD
WORK
AHEAD W20-1WORK STL/2 TAPER SEE CHART12 11 11 12W4-2LLEFT LANECLOSEDAHEADW20-5LX'X'X'ROADWORKAHEADW20-1X'X'PLACE W20-1 SIGNSON ALL ADJACENT STREETSWITHIN ADVANCEDWARNING AREASROADWORKAHEADW20-1 ROADWORKAHEADW20-1ARRW-BRD
CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NMOBILE WORK ZONETREE TRIMMING PROJECTNOT TO SCALETCP - 10 MEDIAN/BOULEVARD INSIDE LANE CLOSURE28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCAUTIONBOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTREELINENotes:1. All signs and spacing to conform to the MUTCDand King County, WA standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. All vehicles shall stay as far rightas possible and shall adjustits spacing to accommodate changing sight distance and otherfield conditions.4. Mobile work is continuously moving or stoppedfor a brief period of time, less than 15 minutes.5. Should the work duration continue on longer than the 15minute Maximum the Work Zone Traffic Control Setup shallbe reconfigured and adjusted to meet the requirements ofthe Short Duration Stationary Right Shoulder Closure Set-up.6. This typical may be used for vehicle based operations suchas setting up stationary traffic control (placing cones, drumsand signs),but is not to be used for operations that involveworkers on foot performing roadway and/or appurtenancerepairs.7. No-park signs shall be in place 48 hours before job start.PSEPUGETSOUNDENERGYAsplundh Mobile Work ZonesTypical Scenario TCP's December 3, 2018gregory.harwood@pse.com(425) 424-6425SHEET 10 of 12