PSE 105093786 ADAM SCHMIER DUPLEXN
Vicinity Map
46.9435, -122.6074
Owner / Developer Contact Info
officeATTN:
ADAM SCHMIER
310 COUNTRY ESTATES DR.
RAINIER, WA 98576
CYNTHIA SCHMIER 360.894.5210
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
508138404 105093786
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA 105093786N/ADESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
J. SUTTON .8.25.20
N/A .N/A
S. FOX .8.18.20
REDT # ( RW-116838 )YELM
ADAM SCHMIER DUPLEX
1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 4 UNITS
210-212 JEFFERSON AVE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105093786
N/A 1 OF 2
THURSTON N/A N/A QSTHLE
19SW-T17N-R02E N/A N/A
1702E075 1702E116 1702E075 YEL-25
COMCAST
MARK TORRES
360.357.1230
CENTURY LINK
MICHELLE PALMER
360.956.7692
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DON BETTENCOURT
206.445.5958
Don.Bettencourt@pse.com
x
x
x x
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
CYNTHIAFROMREMAX@GMAIL.COM
VAULT DETAIL @ V01
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
JOINT TRENCH DETAIL
NOT TO SCALE JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
SITE
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Combustible walls using a reduced-flammability transformer. Gas
service meter relief vent.3 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Generators, customer-owned transformers, fire sprinkler valves,
standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and reduced flammability oil.
100 FT
FUSE @ 40T
SW#T84396
FEE
D
YEL
25
212
210
BLDG A
2 UNITS
~1250 SQF
BLDG B
2 UNITS
~1250 SQF
J
E
F
F
E
R
S
O
N
A
V
E
NW
RAIL
R
O
A
D
S
T
N
WEDWARDS ST N
W
204
202
#2ACSR CN#4 C
U C397.5 AACCBA397.5 AACCBA#
6
C
U
CNTYPICAL PSE
EASEMENT
(2) 4/0
(2) 4/0
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
V01 TO METER LOCATION
108
RE-FUSE @ 65T
#4 C
U CRAIL
R
O
A
D
S
T
N
W
W
Y
E
LM
A
V
E
202
108
106
'A'
'B'
61'
55'60'
(2) 4/0
(2) 4/0
BLDG A
2 UNITS
~1250 SQF BLDG B
2 UNITS
~1250 SQF
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
V01 TO METER LOCATION
FUSE @ 40T
SW#T84396
NEW 1/O AL
EIS524-CØ
#4 C
U
RE-FUSE @ 65T
#4 C
U C#2ACSR
#4 C
U
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
J. SUTTON .8.25.20
N/A .N/A
S. FOX .8.18.20
REDT # ( RW-116838 )YELM
ADAM SCHMIER DUPLEX
1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 4 UNITS
210-212 JEFFERSON AVE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105093786
1" = 50'2 OF 2
THURSTON N/A N/A QSTHLE
19SW-T17N-R02E N/A N/A
1702E075 1702E116 1702E075 YEL-25
COMCAST
MARK TORRES
360.357.1230
CENTURY LINK
MICHELLE PALMER
360.956.7692
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
6.8.2020
303 306 278
0 0 5
303 306 283
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 340'
17 1,250
65 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #210
2
1250
200A
ELEC
18.5KW
65
1.6 @ V01
1.0 @ V01
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
LOT 210 3 V01 2 4/0 -
LOT 212 3 V01 2 4/0 -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 37.5KVA 0.7 2.23 18,700 AMPS 1.70 12,300 AMPS
DEVELOPER TO PROVIDE TYPICAL 10' PSE
FRONTAGE EASEMENT FOR OPERATION
AND MAINTENANCE OF PSE EQUIPMENT.
EASEMENT TO BE CLEAR OF ALL
BUILDING OVERHANGS AND FOUNDATION
FOOTINGS
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #212
2
1250
200A
ELEC
18.5KW
65
1.6 @ V01
1.0 @ V01
SITE SPECIFIC NOTES
At P02 (559410-147417) 2007 CLASS 4 - 45'
-INSTALL (1) 2" PRIMARY RISER ON NEW S/O BRACKETS (RIS2CSS) 6042.1000
-TAP-OFF CLAMP (2153100)
-ALUM "H" CONN (2167000)
-FUSE @ 40T (3412500), TAP 'C' PHASE
-INSTALL SW#T84396
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LINK BREAK CUTOUT
& SURGE ARRESTER (TSU1C1) STD 6043.1000
At P01 (559393-147397) 1993 CLASS UNK - 45'
-INSTALL 1Ø C/O W/ LOAD INTERRUPTER CUTOUT (DLS115L) 6022.1000
-FUSE @ 65T (3412600), TAP 'C' PHASE
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
ASBUILT
LOCATION
XING
LENGTH
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 'A''B'ELEC ONLY 2 DB120 1 ( )'ECL 70 PRIMARY
2" DB120 GREY PVC = 70 FT 2" PVC PLUG /CAPS = 2
-REMOVE EXISTING CUTOUT & 15T FUSE (SW# Y1243)
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559428
147397
42"x48"x38"
Unistrut HH
Matid: 7663001
37.5KVA MP TRF
120/240
Matid: 6247050
1 1
MINU1SR 6045.1010 CØ
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
P02 V01 2 1 270 1 ---212 165 1/0 AL JKT 380 --EIS524 -1.5
2" PVC (FT) & BENDS =270 1 0 0 0 1/0 AL JKT TOTAL (FT) =380 1.5 TTL (Gal)
NEW CONDUIT DIAGRAM
PRIMARY 2"
CONDUIT LEGEND
CUST. OWNED
NOT TO SCALE
EX OVERHEAD CIRCUIT MAP ########
SCALE: 6" = 1 MILE
SITE
EX UNDERGROUND CIRCUIT MAP ########
NOT TO SCALE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #212 #HP
N/A
N/A
100A
ELEC
2KW
65
1.6 @ V01
1.0 @ V01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #210 HP
N/A
N/A
100A
ELEC
2KW
65
1.6 @ V01
1.0 @ V01