2020.0022 211 Jefferson Ave Nw Yelm Permit Setl'*J 1lfo3JI117 TRiTfo fi*h General Notes: These structural notes supplement the drawings. Any discrepancy found among the drawings, these notes, and the site conditions shall be reported to the Engineer, who shall correct such discrepancy in writing. Any work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk. The Contractor shall verify and coordinate the dimensions among all drawings prior to proceeding with any work or fabrication. The Contractor shall coordinate between the architectural drawings and the structural drawings. The architectural dimensions are taken to be correct when in conflict with the structural drawings. The Contractor is responsible for all bracing and shoring during construction. All construction shall conform to the applicable portions of the latest edition of the International Building Code except where noted Design Criteria: U) 1. Live Load = 40 PSF (Floors) 00 ao = 25 PSF (Snow) 2- Dead Load = 15 PSF (Roof) C6 i�: = 12 PSF (Floor) 'Co L = 10 PSF (Walls) = 150 PCF (Concrete) 3. Partition = 10 PSF (Floors) 4. Wind = 2015 IBC Exposure B @ 110 mph 5. Earthquake = 2015 IBC = C6 Site Class = D = co a) co Design Cat. = D �o Use Group = I c R = 6.5 co Cd = 4 O - Wa = 3 6. Soil = 1500 PSF, Assumed bearing capacity H LU = 38 PCF, Assumed Active Fluid Pressure 0LU = 350 PCF, Assumed Passive fluid Pressure W--�--� = 0.45, Assumed Coefficient of Friction o .� T_ = 110 PCF, Assumed Soil Density Concrete & Reinforcing steer: 1. All concrete work shall be per the 2015 IBC Chapter 19. 2. All reinforcing shall be ASTM A615 Grade 60 except as shown on the plans. Steel: 3. Concrete shall be in accordance with ASTM 150. f = 2500 PSI @ 28 day slump = 4" maximum, 6% Air entrained. 4. Garage slab and exterior slabs to have minimum thickness of 4" with 6x6 W 1.4x1 A W W F with vapor barrier. This is at the owner's option to reduce slab cracking. Crack control joints the responsibility of the contractor 1. Anchor bolts shall be ASTM A307. Caro entry: 1. 2X structural framing shall be #2 Douglas Fir. 4x structural members shall be #2 Douglas Fir. 6X members shall be #1 Douglas Fir. 2- Provide solid blocking in floor system below all bearing walls and point loads. 3. 2X joists shall be kiln dried and stored in a dry area prior to installation. The moisture content of all wood shall be less than 15%. 4- Floorjoists shall be by Boise Cascade or other approved manufacturer. Joist to be installed and braced per manufacturer's requirements. 5. Roof trusses shall be by a pre -approved manufacturer and constructed according to the specifications of the Truss Plate Institute. Truss shop drawings must be stamped by a licensed engineer and be on site at the time of construction. Preliminary truss drawings must be reviewed prior to construction. It is the truss manufacturer's responsibility to inform the engineer of record of any changes from the preliminary truss lay -out. Girder trusses to have a minimum of bearing studs equal to number of plies of truss. All girder trusses shall have Simpson HGT tie down at either end to match number of plies. Truss manufactures are responsible for all bracing of the trusses including end wall bracing and all other bracing between the building and the trusses unless specifically shown otherwise on the drawings. Contractor to coordinate bracing with engineer of record as required. 6. Glue laminated beams shall be 24F -V8 for cantilevered or continuous beams and 24F -V4 for simple spans. (Fb = 2,400 PSI) (Fv = 190 PSI) (E = 1,800,000 PSI) (FcL = 650 PSI) 7. Continuous and cantilevered glue laminated beams shall not be cambered. All other glue laminated beams shall be cantilevered for L/480. See the framing plans for any exceptions. 8. All manufactured lumber shall be by Boise Cascade and have the following structural properties: Versa Lam (VL) (Fb = 2,800 PSI) (Fv = 280 PSI) (E = 2,000,000 PSI) (FcL = 750 PSI) 9. Sheathing at roof and floor shall be laid with face grain perpendicular to supports and end joints staggered 4'-0" on center. Provide 1/8" space at panel edges as required by panel manufacturers. Floor sheathing shall be nailed 6" o.c. edges and 12" field with 10d's and roof sheathing shall be nailed 6" o.c. edges and 12" o.c field with 10d's unless otherwise noted on the drawings. 10. Block and nail all horizontal panel edges at designated shear walls. 11- All beams to be supported by a minimum of a solid post that matches the width of the wall and the width of the beam unless noted otherwise. A 6x beam bearing in 2x6 wall will be a 6x6. Provide solid squash blocking to match in floor system and match post size in foundation. Contact Engineer of record for any deviations. 12. All fasteners in contact with pressure treated lumber will meet the below requirements. All fasteners including nuts and washers in contract with pressure treated lumber shall be hot -dipped zinc coated galvanized steel, stainless steel, silicon bronze or copper. Fasteners other than nails, timber rivets, wood screws and lag screws shall be permitted to be of mechanically deposited zinc coated steel in accordance with ASTM B 695, Class 55 minimum. Fasteners exposed to weather must meet the requirements of the pressure treating manufacture's minimum. IN ADDITON, the contractor shall coordinate connector/fastener coating requirements with recommendations from connector/fastener manufacturer and type of pressure treating chemical and retention being used. See Section 2304.10.5 of the 2015 IBC for additional information. 13. All GW B to be installed per the IBC and Gypsum Association's publication for the Application and Finishing of Gypsum Board, GA -216 Hardware: All connection hardware shall be Simpson "Strong Tie". Connection hardware exposed to the weather or soil shall be treated as in steel above. CA UTION: PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS AND BRACE PER TRUSS COMPANY RECCOMENDATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING REQUIRED FOR PLACING TRUSSES. NOTE THESE DRAWINGS DO NOT INCLUDE ANY TEMPORARY SHORING OR BRACING. PRECISE ENGINEERING RECCOMENDS ALL SHORING AND BRACING BE DESIGNED AND DETAILED BY A LISENCED ENGINEER. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS. T t 'r1. 3'-4f4n 0 21-911 FOUNDATION / F 0 FRAM 31 -mil SCALE: 1/4" = I'-0" D req Jesus,Kam 9�� Pen ecos a 21=1 J Avenue _rtliw - r_ a. SITE PHOTO SITS 15�AN, SCALE: 1/8" = 1'-0" 210 JEFFER50N AVE. SHEET INDEX A -I SITE PLAN - FOUNDATION / FRAMING PLAN - STRUCTURAL NOTES A-2 FOUNDATION DETAILS A-3 FIRST FLOOR PLAN - SECOND FLOOR PLAN - SHEAR WALL NOTES A-4 UPPER FLOOR / LOWER ROOF FRAMING PLAN - FRAMING DETAILS A-5 UPPER ROOF FRAMING PLAN - DETAIL - WALL TYPES A-6 'A' SECTION - '8' SECTION - 'C' SECTION - ROOF PLAN - ELEVATIONS A-1 GENERAL NOTES - NAILING SCHEDULE - WINDOW INSTALLATION DETAIL - WATER HEATER SUPPORT DETAIL fD m 0 U i i U) � J W 00 ao LO CD O�ObbH � eP i i 0 a a� 0 Q a v Ln O N O N \ N O E a� 3 Z v Q c 0 a� a� U) ti W 00 ao LO CD U_ C_ C6 i�: a^)' W TT1 �/ ♦ 'Co L C� � W U LJJ 00 0-) E w ^` " M W — o = C6 � V♦ = co a) co U �o U c > ::D U co Z w Q O - L O � CL 0 a a� 0 Q a v Ln O N O N \ N O E a� 3 Z v Q c 0 a� a� U) ti Lii LO CD U_ M C� co LJJ 00 0-) E Z O (� o � W Zz Q Z 2i J > ::D U LL. Q Z w Q y.s L O Z 0 H LU L 0LU IY W--�--� 0 U o .� T_ C) U Z ti ' z W 'q:t Z Z Q LU 2i M r` Z J 0 O O O M 0 a a� 0 Q a v Ln O N O N \ N O E a� 3 Z v Q c 0 a� a� ti LO CD M C� L E o � W U_ Z U > Q y.s L O u _CIO L 0 > o .� T_ Q U CV N N a 0 � Q 0 0 a a� 0 Q a v Ln O N O N \ N O E a� 3 Z v Q c 0 a� a� A-2 Project Number Sheet Number OF Sheet Contents Project Title A Duplex for: Cynthia Schmier Drawn By Checked By Date Date Structural Engineer Precise Engineering Inc. Reproduction or re-use of these drawings without the written permission of the Design Team is prohibited.TTARK N ENHAH.DDLORAH N E F SSIO OPR N E E NAL G IRE1011 Mellen Street Centralia, Wa. 98531 Ph. 360-736-1137211 Jefferson Ave. NE Yelm, Wa. 98597 ADVANCED DRAFTING SERVICES 1011 MELLEN STREET CENTRALIA, WA. 98531 360 - 736 - 4751 PLANNING - DESIGN - DOCUMENTATION TYPICAL SHEAR WALL NOTES Use 5/8" dia. by 10" Anchor Bolts (AB's) with single plates and 5/8" dia. by 12" AB's with double and 3x plates spaced as shown on the drawings. AB's shall have 7" of embedment into footing, shall be centered in the stud wall, and shall project through the bottom plate of the wall and have a 3x3x 1 /4 plate washer. There shall be a minimum of two bolts per piece of sill located not more than 12 inches or less than 4 inches end of each piece. Anchor bolts to be galvanized per the below requirement (Fasteners in contact with pressure treated lumber). At existing foundation use 5/8" diameter Simpson Titen HG bolts with minimum of 4" embedment into the existing concrete. All wall sheathing shall be 1/2" CDX plywood, 5/8" T1-11 siding, or 7/16" OSB with exterior exposure glue and span rated "SR 24/0" or better. All free sheathing edges shall be blocked with 2x4 or 2x6 flat blocking except where noted on the drawings or below. All nails shall be 8d or l Od common (8d common nails must be 0.131 inch diameter, Senco KC27 Nails are equivalent. If 10d common nails are called for the diameter must be 0.148 inches, Senco MD23 Nails are equivalent). Nail size and spacing at all sheathing edges shall be as required below or as in the drawings. Nail spacings shall be 12" o.c. for all field nailing except as noted. Hold downs are Simpson "Strong Tie" and shall be installed per the manufacture's recommendation. Equivalent hold downs by United Steel Products Company "Kant -Sag" that have ICBO approval can be substituted in place of Simpson hold downs. All floor systems must be blocked solid below member that the hold down is attached to. This block should be equal to or larger than the member the hold down is attached to and be placed as a "squash block". All double and triple studs shall glued and nailed together with 1 Od's at 3" o.c. for each layer. All 4x studs are to be #2 DF and all 6x studs are to be #I DF when used for hold downs and shear walls. FASTENERS IN CONTACT WITH PRESSURE TREATED LUMBER All fasteners including nuts and washers in contractwith pressure treated lumber shall be hot -dipped zinc coated galvanized steel, stainless steel, silicon bronze or copper. Fasteners other than nails, timber rivets, wood screws and lag screws shall be permitted to be of mechanically deposited zinc coated steel in accordance with ASTM B 695, Class 55 minimum. Fasteners exposed to weather must meet the requirements of the pressure treating manufacture's minimum. IN ADDITON, the contractor shall coordinate connectorifastener coating requirements with recommendations from connector/fastener manufacturer and type of pressure treating chemical and retention being used. See Section 2304.10.5 of the 2015 IBC for additional information. ALL WALL STUDS AND ROOF TRUSS TOP CHORDS AND SECONDARY FRAMING LUMBER SHALL BE DOUG -FIR #2 OR BETTER. NOTE: MST STRAPS attaches to (2) 2x or 4x studs in wall above and below unless noted otherwise. Nail all holes with 16d sinkers. Double studs may be use as a substitute for 3x nominal framing call out below. Studs MUST be glued and nailed together with (2) lines of 10d's at 3" on center staggered. Horizontal blocking for shear walls nailed with 8d's shall be minimum of 2x flat and shear walls nailed with 10d's shall be minimum of 3x flat. SHEAR WALL SCHEDULE 1A sheathing nailed with 8d's at 6" on center all edges. HOLD DOWN SCHEDULE It is the responsibility of the contractor to locate hold down anchor bolt to accommodate all structural framing. Anchor bolt to be located nearest the corner or opening at the end of the shear wall. All foundation vents to be a minimum of 12" off centerline of the anchor bolt on either side. Holdown stud to be coordinated with shear wall panel edge framing requirements. Larger stud size controls * For holdown anchor bolt embedment greater that foundation depth, thicken footing for 2'-O" either side of holdown anchor bolt to a depth that provides for 3" clear below the bottom of the anchor bolt. Provide (2) additional #4 x 3'-0" pieces of longitudinal rebar at this location. OA HD U2 attaches to concrete foundation with a Simpson SST13 16. HDU2 attaches to double 2x studs or 4x or 6x stud with (6) Simpson SDS 1/4 X 3 Wood Screws in wall above. FLOOR TO FLOOR STRAP 10 VISTA 49 Simpson MSTA 49 is a floor to floor strap that is centered on the rim joist. The strap attaches to a minimum of a single stud in the wall above and below. Shear wall boundary member and Holdown member requirements will usually control member size. Install per Simpson's requirements. ie A6 61COND FLOOR PLAN, r M 30' Ilk Ilk 12'-2" 5'-8" 12'-2" 4040 EGRESS WALL :_2 ' (01-101, �r N 1 EC4 FAN MIN, 50 CFM WALL - 1 1 SMOKE DETECTOR 5'-4" %I 12668 7u4DRYER tg LUan M N Ca WASH R mFAN TOILE MIN. 50 CFM PROVIDE HOT AND COLD HOSE BIBS FOR AUTO WASHER AND VENT FOR DRYER PROVIDE DRAIN FOR e WASHER 8 LIVING ROOM 40"' COAJ OL 1111111111Z#2 STAIR NOTE: MAX. RISE TO BE 13/411 MIN. RUN TO BE 10" 11/2"0 RAIL BETWEEN 34" AND 38" ABOVE UNIT (D THE STAIRTTOR E036" CLRWIDTH AND OPEN BALLUSTERS TO PLACED LO 12 �� NOT PASS SUCH TBETWEEN.A 4110 HERE MAY Q `r A 2'-6" 5'-112" 2'-411 11" 3 _2V4u 8' ---r SMOKE DETECTOR ENTRE' < o� < FN.P.I D. STEP(S) 10 _Q M FAN MIN. 100 CFM LO KIT Fl. E10Cq LAND 0 - .� D.W. - Ei 1 s ;r NOOK <r 5'-11�4n 2. I PR VID 52" 1YPE 'X' BELOW STAIR Z U1 LO NT*'" cK/ s" -77 WD. STEP(S) H P 2'-4" 1 II" 1 10'x7' O.N. DOOR ENERGY COMPLIANCE (SMALL DWELLING UNIT: IS CREDITS REQUIRED) A la EFFICIENT BUILDING ENVELOPE (0.5) 5c EFFICIENT WATER HEATING 5c ELECTRIC HEAT PUMP WATER HEATER w/ MINIMUM EF OF 2.0 (1.5) 15' 2.0 CREDITS PROVIDED SMOKE DETECTOR NOTE: ALL SMOKE DETECTORSa TYPICAL SHEAR WALL CALL OUT TO BE CARBON MONOXIDE SEE SHEAR WALL SCHEDULE DETECTION EQUIPPED ANDO TYPICAL HOLDOWN CALL OUT SEE INTERCONNECTED w/ BATTERY HOLDOWN SCHEDULE BACKUP. FIREWALL NOTE: PROVIDE 5/8" TYPE 'X' G.W.B. AT WALLS BETWEEN GARAGE AND DWELLING FROM THE GONG. SLAB TO THE ROOF SHEATHING OR G.W.B. -9 CEILING LU 0 1 N UNIT 2 GARAGE 10'xi' O.H. DOOR 15' FIRST FLOOR PLAN. U) HOWER ti SHELF AND POLE 00 o C1�5/5 MBO. eP WARDROBE L co CD UJ 00 9068 BI -PASS W 0 z 00 52 Q LU Q) r� Z N C6 LC� U WALL - 4 () ^ ♦ co MIN. CRN co (0 ^ N ^� d C 5DM 2 e � � N 0 LL Q v 3'-4" 2'-8" 2668 SMOKE DETECTOR DETE OR 2668 M S 10KE TECTOR � N IL Q �Q6 LU LIVING ROOM 40"' COAJ OL 1111111111Z#2 STAIR NOTE: MAX. RISE TO BE 13/411 MIN. RUN TO BE 10" 11/2"0 RAIL BETWEEN 34" AND 38" ABOVE UNIT (D THE STAIRTTOR E036" CLRWIDTH AND OPEN BALLUSTERS TO PLACED LO 12 �� NOT PASS SUCH TBETWEEN.A 4110 HERE MAY Q `r A 2'-6" 5'-112" 2'-411 11" 3 _2V4u 8' ---r SMOKE DETECTOR ENTRE' < o� < FN.P.I D. STEP(S) 10 _Q M FAN MIN. 100 CFM LO KIT Fl. E10Cq LAND 0 - .� D.W. - Ei 1 s ;r NOOK <r 5'-11�4n 2. I PR VID 52" 1YPE 'X' BELOW STAIR Z U1 LO NT*'" cK/ s" -77 WD. STEP(S) H P 2'-4" 1 II" 1 10'x7' O.N. DOOR ENERGY COMPLIANCE (SMALL DWELLING UNIT: IS CREDITS REQUIRED) A la EFFICIENT BUILDING ENVELOPE (0.5) 5c EFFICIENT WATER HEATING 5c ELECTRIC HEAT PUMP WATER HEATER w/ MINIMUM EF OF 2.0 (1.5) 15' 2.0 CREDITS PROVIDED SMOKE DETECTOR NOTE: ALL SMOKE DETECTORSa TYPICAL SHEAR WALL CALL OUT TO BE CARBON MONOXIDE SEE SHEAR WALL SCHEDULE DETECTION EQUIPPED ANDO TYPICAL HOLDOWN CALL OUT SEE INTERCONNECTED w/ BATTERY HOLDOWN SCHEDULE BACKUP. FIREWALL NOTE: PROVIDE 5/8" TYPE 'X' G.W.B. AT WALLS BETWEEN GARAGE AND DWELLING FROM THE GONG. SLAB TO THE ROOF SHEATHING OR G.W.B. -9 CEILING LU 0 1 N UNIT 2 GARAGE 10'xi' O.H. DOOR 15' FIRST FLOOR PLAN. U) co ti C^ 00 o LO •• O�ObbH � eP U) co ti a�00 00 CD C6 L co CD UJ 00 z O W (v U z z Q LU Q) r� Z N C6 LC� U N M �o () ^ ♦ co =3W co (0 ^ a U) ti W U_ C6 L co E UJ 00 z O Al Q z z Q LU Q ti LO C6 L E 11� Al S_ Z U v) > e y L 0 < ' (L -CZ }+ L N U_ ^� d UN 63 IL a` � � N LL Q A-4 Project Number Sheet Number OF Sheet Contents Project Title A Duplex for: Cynthia Schmier Drawn By Checked By Date Date Structural Engineer Precise Engineering Inc. Reproduction or re-use of these drawings without the written permission of the Design Team is prohibited.TTARKN E NHAH.DDLORAH N E F SSIO OPR N EE NAL G IRE1011 Mellen Street Centralia, Wa. 98531 Ph. 360-736-1137211 Jefferson Ave. NE Yelm, Wa. 98597 ADVANCED DRAFTING SERVICES 1011 MELLEN STREET CENTRALIA, WA. 98531 360 - 736 - 4751 PLANNING - DESIGN - DOCUMENTATION A-5 Project Number Sheet Number OF Sheet Contents Project Title A Duplex for: Cynthia Schmier Drawn By Checked By Date Date Structural Engineer Precise Engineering Inc. Reproduction or re-use of these drawings without the written permission of the Design Team is prohibited.TTARKN E NHAH.DDLORAH N E F SSIO OPR N EE NAL G IRE1011 Mellen Street Centralia, Wa. 98531 Ph. 360-736-1137211 Jefferson Ave. NE Yelm, Wa. 98597 ADVANCED DRAFTING SERVICES 1011 MELLEN STREET CENTRALIA, WA. 98531 360 - 736 - 4751 PLANNING - DESIGN - DOCUMENTATION A-6 Project Number Sheet Number OF Sheet Contents Project Title A Duplex for: Cynthia Schmier Drawn By Checked By Date Date Structural Engineer Precise Engineering Inc. Reproduction or re-use of these drawings without the written permission of the Design Team is prohibited.TTARKN E NHAH.DDLORAH N E F SSIO OPR N EE NAL G IRE1011 Mellen Street Centralia, Wa. 98531 Ph. 360-736-1137211 Jefferson Ave. NE Yelm, Wa. 98597 ADVANCED DRAFTING SERVICES 1011 MELLEN STREET CENTRALIA, WA. 98531 360 - 736 - 4751 PLANNING - DESIGN - DOCUMENTATION A-7 Project Number Sheet Number OF Sheet Contents Project Title A Duplex for: Cynthia Schmier Drawn By Checked By Date Date Reproduction or re-use of these drawings without the written permission of the Design Team is prohibited. 211 Jefferson Ave. NE Yelm, Wa. 98597 ADVANCED DRAFTING SERVICES 1011 MELLEN STREET CENTRALIA, WA. 98531 360 - 736 - 4751 PLANNING - DESIGN - DOCUMENTATION