Loading...
2020.0026 Truss LayoutGLTJC37 (3) MUS26 (9) Furnace Platform Product 2x4 Solid Block Qty 06 2x4 Vent Block Blocking List 47 QUANTITY HANGER CARRIED MEMBER HANGER SCHEDULE CARRYING MEMBER USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER = Truss left end indicator. 6-10D6-10DMUS2609 TJC3703 6-8D6-8D J01 J01 M01J01J02(2)M02(2) J02(3)40-00-0015-00-0017-06-00 5-00-00 5-06-0043-00-006-08-00 13-04-00 16-00-00 2-00-0038-00-00 36-00-00 2-00-0038-00-00 2-00-00 1-00-00 5-00-006-00-00 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP02 BP02 BP02 BP02 BP02 C01 C02 B01 B03A01 A03DA05BP02 B02F(5)A02(9)A04(7)12-00-00THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See the individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of wood trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179 BUILDER : PROJECT : DATE : DRAWN BY : SCALE: 20815 67th Ave NE Arlington, WA 98223 Phone: 1-360-925-4155 JOB #:RT - 1 ADDRESS : Dale H Quote Acct 679636 Yelm creek 2108-2 plan JCA 11/17/2020 2543968