2020.0026 Truss LayoutGLTJC37
(3)
MUS26
(9)
Furnace
Platform
Product
2x4 Solid Block
Qty
06
2x4 Vent Block
Blocking List
47
QUANTITY HANGER CARRIED
MEMBER
HANGER SCHEDULE
CARRYING
MEMBER
USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER
OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER
= Truss left end indicator.
6-10D6-10DMUS2609
TJC3703 6-8D6-8D
J01
J01
M01J01J02(2)M02(2)
J02(3)40-00-0015-00-0017-06-00 5-00-00 5-06-0043-00-006-08-00 13-04-00 16-00-00
2-00-0038-00-00
36-00-00
2-00-0038-00-00
2-00-00
1-00-00 5-00-006-00-00
BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01 BP01
BP02 BP02 BP02 BP02 BP02
C01
C02
B01
B03A01 A03DA05BP02
B02F(5)A02(9)A04(7)12-00-00THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.
These trusses are designed as individual building
components to be incorporated into the building design
at the specification of the building designer. See the
individual design sheets for each truss design identified
on the placement drawing. The building designer is
responsible for temporary and permanent bracing of the
roof and floor system and for the overall structure. The
design of the truss support structure including headers,
beams, walls, and columns is the responsibility of the
building designer. For general guidance regarding
bracing, consult "Bracing of wood trusses" available
from the Truss Plate Institute, 583 D'Onifrio Drive;
Madison, WI 53179
BUILDER :
PROJECT :
DATE :
DRAWN BY :
SCALE:
20815 67th Ave NE
Arlington, WA 98223
Phone: 1-360-925-4155
JOB #:RT - 1
ADDRESS :
Dale H Quote Acct 679636
Yelm creek 2108-2 plan JCA
11/17/2020
2543968