Loading...
0000.0017 2020.11.16 NHD RL 1318 AC (A) Palisades Lot 215' 22' 2' 26' - 6' 30 1 I L J 13'_5" C�iiy�l►[�i�►y�l 3 30 1 I L J 16' 9'-9' w < Q 7 a ❑ Q V � Q 12' 56' tl3 ' 00 00 8' STEM ON 16' FTG. I V) 4' THK, CONC, SLAB ON ,006 VISQUEEN VAPOR BARRIER & I COMPACTED SAND/GRAVEL I 1N BASE w/ R-10 x 24' @ SLAB I I PERIMETER I I oho I I I I 12'-6" ~' 8' STEM ON 36' FTG. I I J I I I I I II--------___--------� I I I � I I 1 I 4" CONC. SLAB 0/ 2 4" COMP. FILL 51.1 SLOPED 2" TOWARD DOOR I I 1 I 1 '4--6" STEM ON 16" FTG. 1 I I I I I I I L___-__.�-�. I — -r — — — — — 2' 8'-3' R❑ 21' 93' 16'-3" R❑ 932 12' 19'-6" I I I I I I I II N I N / N I ■ I • � � i 5-6 5-6 5-6 5-6 5- 11 24 24 24 24 24 I L I L5'-11* 1 I 51_3# I I I L_� 1 L ------J � I L1j 4' N. Illw-lw 31'-1 41_6' I 8" STEM ON 16" IIIAZA-ii 71O_(}N 31_6. FOUNDATION PLAN 1/4'=1'-o' NOTES: F❑❑TING SCHEDULE 30 1 30'x3O'xl2' (4)#4 E,W ' %" ANCHORS @ 30" o/c U.N.O 24 1 24"x24'x8' (2)#4 EV =PT. LOAD LL • W V coo ao m e"v M � 7� M M --t00 �n N W � Q �R! • V � M M --t00 �n �R! c Ca coo v U o n O � a � Q en X � m � C � � � C Y C qJ W M L :r -1- ll� N DATE: Nov. 2020 DRAWING NUMBER ^ A 11318A H J❑IST 16'o/c TE ❑ v w 3 C � � 0 > C) a 0 �- � U 2'x6' @ 16'o/c P❑NY W ALL w/7I16' SHEATHING w/ 8ci @ 4'o/c EDGE NAILING Vo A,B, @ 30'o/c00 MIN. 2 PER STEP Q Q E cd cc d1 x 60 „� kr) •� W �_o U N �. + C� r --a m rn 0 a z f C2)#4 IN FTG, 8 A: ' • . x 4Y2' MAX a -0 / r r� MIN. 16 1 -TYPICAL E❑UNDATI❑N WALL w .c 5' MAX BACKFILL HT. PRI❑R T❑ COMPLETION ❑F BASEMENT SLAB AND FIRST FLOOR DIAPHRAGM --------------- #5 VERT. @ 9'o/c (ALT HO❑K)L, #4 H❑RIZ, @ 18'o/c eAi T unnv' MIN. 24' BETWEEN STEPS 2'x6' @ 16'o/c P❑NY W ALL w/7I16' SHEATHING w/ 8ci @ 4'o/c EDGE NAILING Vo A,B, @ 30'o/c00 MIN. 2 PER STEP Q Q E cd cc d1 x 60 „� kr) •� W �_o U N �. + C� r --a m rn 00 !� cid ".. d �; it e a L -16'--J 2 -GARAGE FOUNDATION WALL SLAB ❑Ic /c N❑TES, 1 (3) 10d PER BLOCK 2 J❑IST PER PLAN 3 FLOOR BEAM PER PLAN 4, PLYWOOD SHEATHING 5. BLOCKING 6. 4x OR 6x POST WITH SIMPSON A35 EACH SIDE 7. CONCRETE FOOTING & EDGE NAILING 9, 2x WOOD CLEAT ❑R SIMPSON POST CAP 3 -TYPICAL INTERIOR SPREAD FOOTING. MTS J FTG. RF PIPE IN DRAIN ROCK 'ED IN FILTER FABRIC 4 -BASEMENT RETAINING WALL POST PER PL 5 -TYPICAL CONC. SLAB 4 CONT, THICKENED EDGE SLAB 8' 24' MAX S' N" 6-TYP, EDOTING/STEMWALL STEP STEM WALL PER PLAN G w .c 00 m rn 00 !� cid n L N r1 � o0 0 a bn G .c NO m rn r � L r1 � o0 0 bn X On a W go M N SCALE: AS SHOWN DATE: Nov. 2020 DRAWING NUMBER 11318A S1.1 6'x6' PT POST w/ACE6 POST CAP AND ABU66 POST BASE 2'x10' PT LEDGER w/C2)LEDGERL❑KS @ 16'c/e 6'x6' PT POST w/ACE6 POST CAP AND ABU66 POST BASE DTT1Z R 48'o/c w/3/8'm LAG SCREW z V Q x12 � HF#1 h•�I ►-� c1� 6 PT n � U FIRST FLOOR FRAMING h LI^� ry � a b • ALL WINDOW/DOOR HDR TO BE 4"x10" HF#2 U.N.O 0 = Ir '� o s p o G o tu w a 0 x CU 6'x6' PT POST w/ACE6 POST CAP AND ABU66 POST BASE DTT1Z R 48'o/c w/3/8'm LAG SCREW � z V Q � ct h•�I ►-� � V Q � ct h•�I ►-� c1� 00 n � FIRST FLOOR FRAMING h LI^� ry � a b • ALL WINDOW/DOOR HDR TO BE 4"x10" HF#2 U.N.O = Ir '� SCALE: AS SHOWN DATE: Nov.2020 DRAWING NUMBER 11318A S2 V � h•�I ►-� c1� 00 n � FIRST FLOOR FRAMING h ry � a b SCALE: AS SHOWN DATE: Nov.2020 DRAWING NUMBER 11318A S2 V � h•�I �A r� � n � FIRST FLOOR FRAMING ry NOTLS: b • ALL WINDOW/DOOR HDR TO BE 4"x10" HF#2 U.N.O = • ALL WINDOW/DOOR HDR JACK STUDS TO BE (1)2x U,N.O °� o p o G o tu w SCALE: AS SHOWN DATE: Nov.2020 DRAWING NUMBER 11318A S2 N J U) z 4 LL 2 Lln 0. 0 0 0 Ln J x w a 2 Ff ul 0 2 Lu 7 ua cn m m 0 ti 0 L1 Q co r tn z V Q 0) C Q Q Q) J N co M U 06 m r clJ Z u� m _ Z J Ln J w E J Q] 7 �6 co r m r r t N u aj 0 L CL 0 J Z S s qj 2.1 ar 1/4'=1'-D' x12' GL HDR (12'-0'—LONG) 6'x6' PT POST w/ACE6 POST CAP/BASE (3)2x OR 4x POST CTYP — HDR — --E MANUFACTUREg1TRUSSES @ 24'o/c (BYOTHERS) 2"x8' @ 24"o/c OVERFRAMING (TYP,) w La ty MANUFACTURED TRUSSES @ 24'o/c (BY I❑THERS) ofx HUCQ610 HANGER I I — I HDR ' MANUFACTUFfD TRUSSES @ 24'o/c (Y OTHERS) w A 'x6' PT POST w/ACE6 POST CAP/BASE 0 V LLJ� V� W GIRDER y SER F. v a � I~ ¢ ham" UPI v rte-► 00 V co 4a 0 N 0 Qmt GC z z Qa FAT VALLEY ❑ •fir O ow c1d ❑ ❑ U ¢ d 0 LL HUCQ612 HANGE �i 30x12' GL MDR C19'-6' LONG) 6'X1o' 'x6' PT POST w ACE6 POST CAP AND ABU66 P❑ST BASE MANUFACTURED TRUSSES @ 24'o/c (BY OTHERS) ROOF FRAMING NOTES: ■ ALL WINDOW/DOOR HDR TO BE 4"x$" HF#2 U.N.O • ALL WINDOW/DDOR HOR JACK STUDS TO BE (1)2x U.N.O U � I~ o ham" UPI v rte-► 00 V co 4a 0 0 0 Qmt °O u Qa FAT VALLEY •fir O � c1d N M M N ov y. n 00 ■( N r--� HUCQ612 HANGE �i 30x12' GL MDR C19'-6' LONG) 6'X1o' 'x6' PT POST w ACE6 POST CAP AND ABU66 P❑ST BASE MANUFACTURED TRUSSES @ 24'o/c (BY OTHERS) ROOF FRAMING NOTES: ■ ALL WINDOW/DOOR HDR TO BE 4"x$" HF#2 U.N.O • ALL WINDOW/DDOR HOR JACK STUDS TO BE (1)2x U.N.O I~ bA ham" UPI V co 0 -0 n 0 Qmt °O u Qa FAT VALLEY •fir O � � M M N ov y. n 00 ■( N r--� I �w Cl v7 L a SCALE: AS SHOWN DATE; Nov.2020 DRAWING NUMBER 11318A C� IJPS f Fy F� al I _ GIRDER TRUSS — 6'x10' HDR HDR HDR MANUFACTU ED TRUSSES ►-� @ 24'o/c (BY OTHERS) HUCQ612 HANGE �i 30x12' GL MDR C19'-6' LONG) 6'X1o' 'x6' PT POST w ACE6 POST CAP AND ABU66 P❑ST BASE MANUFACTURED TRUSSES @ 24'o/c (BY OTHERS) ROOF FRAMING NOTES: ■ ALL WINDOW/DOOR HDR TO BE 4"x$" HF#2 U.N.O • ALL WINDOW/DDOR HOR JACK STUDS TO BE (1)2x U.N.O I~ bA ham" UPI V co 0 -0 n 0 Qmt °O u Qa •fir O � M N ov y. n 00 ■( N �w Cl v7 L SCALE: AS SHOWN DATE; Nov.2020 DRAWING NUMBER 11318A C� SHEARWALL SCHEDULE MARK MINIMUM SHEATHING EDGE NAILING FIELD I NAILING SOLE PLATE NAILING SILL PLATE CONN, 2 FNR ® 7/16" CDX ONE FACE 8d 0 6"o.c. d 0 12"o.c. (2)164 ® 16"o/c 5/8"dia. 0 48" a.c. w/ 2x BTM. PLATE ZL 7/16" CDX ONE FACE 8d ® 4"o.c. Bd ® 12"o.c. (2)16d ® 12"0/c 5/8"dia. ® 36" o.c. w/ 2x BTM. PLATE ® 7/16" CDX ONE FACE 8d 0 3"o.c. 5d 0 12"o.c. (2)164 ® 8. o/c 5/8"dia. ® 30" o.c. w/ 3x BTM. PLATE ® 15/32" CDX ONE FACE 10d ® 4"o.c.10d ® 12"o.c. (2)16d ® 8"o/c 5/8"dia. 0 24" o.c. w/ 3x BTM. PLATE ® 15/32" COX ONE FACE 1 O ® 3"o.c.1Od ® 12"o. c. (2)16d @ 6"0/c 5/8 -dia. ® 18" o.c. w/ 3x BTM. PLATE SHEAR WALL—N—LET—El—to L ALL STUDS AND BLOCKING SHALL BE HF#2 ALL TOP AND BOTTOM PLATES SHALL BE HF#2. ALL SHEATHING EDGES SHALL BE BACKED WITH 2x OR WIDER FRAMING UNLESS OTHERWISE NOTED (SEE NOTE#2). SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. 2. WHERE SHEATHING NAILING IS A A OR GREATER, F❑UNDATI❑N SILL PLATES AND ALL FRAMING MEMBERS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE 3 --INCH NOMINAL MEMBER AND SILL PLATES NOT BE LESS THAN A SINGLE 3—INCH NOMINAL MEMBER. 3. NAILING CRITERIA IS BASED ON IBC 23D63 AND AF&PA SPDWS TABLE 4.3A FOR CD PLYWOOD AND HF#2 FRAMING, WIRE STAPLES MAY BE SUBSTITUTED AS OUTLINED IN THE STRUCTURAL NOTES, OTHER SUBSTITUTI❑NS MUST BE VERIFIED IN WRITING BY THE STRL, ENGINEER, 4. H❑LDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY SHEARWALLS, SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. REFER TO THE APPROPRIATE CONNECTOR DETAILS FOR ADDITIONAL INF❑RMATI❑N REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. 5 ANCHOR BOLTS MUST BE EMBEDDED INTO CONCRETE OR GROUTED CMU A MINIMUM OF 7', AND SHALL BE PLACED TO PROVIDE A MINIMUM OF 2` GROUTED CLEAR TO THE FACE OF FORMED CONCRETE (PROVIDED 3" CLEAR FOR CONCRETE CAST AGAINST S❑IL) G. EDGE OF ANCHOR BOLT WASHER SHALL BE WITHIN 1/2" OF SHEAR WALL SHEATHING BASEMENT SHEARWALL PLAN 3116'=i'-4' 8d @ 3'o/c GRID TO HDR C2)10cl LSTA24 STRAP ?i6 OSB/PLYWOOD 8d @ 3'c/c TO ALL. PLATE, STUDS AND BL❑CKING STHD14 (2)%'m ANCHOR BOLTS AL FRAME (SEE DET 3116`=I' -O' AL FRAME (SEE DET 4 FIRST FLOOR SHEARWALL PLAN THDI4RJ � w 33 u 0 W cd - � I -PORTAL FRAME ELEVATI❑N (GARAGE) M M NTS 7 AL FRAME (SEE DET 3116`=I' -O' AL FRAME (SEE DET 4 FIRST FLOOR SHEARWALL PLAN THDI4RJ � w � 00 cd - � I -PORTAL FRAME ELEVATI❑N (GARAGE) M M NTS 7 'u 0 A ■� i�/� Fr -"I 3 r..i a 0 0 POEM � N - B - =1 DO AL FRAME (SEE DET 3116`=I' -O' AL FRAME (SEE DET 4 FIRST FLOOR SHEARWALL PLAN THDI4RJ � w � 00 00 � N M M M 7 A N 3 r..i a > y. r- •r a� ,�4- .tet• ISCALE. AS SHOWN ■ ' DATE: Nov. 2020 , DRAWING NUMBER 11318A S4 � m M A �� 3 r..i > &PON =1 N �a C� o v M �¢ 41,o ISCALE. AS SHOWN ■ ' DATE: Nov. 2020 , DRAWING NUMBER 11318A S4 STRUCTURAL NOTES: DESIGN CRITERIA; 1. BUILDING CODE: 2015 INTERNATIONAL BUILDING CODE 2. VERTICAL LOADS: ROOF FLOOR SNOW LOAD 25 psf LIVE LOAD 25 psf 40 psf DEAD LOAD 15 psf 12 psf 3. LATERAL LOAD FORCES TRANSMITTED BY DIAPHRAGM ACTION TO WOOD SHEARWALLS AND THENCE TO FOUNDATION WHERE DISPLACEMENT IS RESISTED BY PASSIVE PRESSURE AND SLIDING FRICTION OF EARTH. 4, SNOW DESIGN DATA (ASCE 7-10) FLAT SNOW LOAD, Pf: 23.1 psf SNOW EXPOSURE FACTOR, Ce: 1.0 SNOW IMPORTANCE FACTOR, Is: 1.0 THERMAL FACTOR, Ct: 1,1 5. WIND DESIGN DATA (ASCE 7-10) WIND SPEED: Vult=110 mph RISK CATEGORY: lI EXPOSURE CATEGORY: B 6. SEISMIC DESIGN DATA (ASCE 7-10) SEISMIC FORCE RESISTING SYSTEM: WOOD SHEARWALLS RISK CATEGORY: Ii SEISMIC IMPORTANCE FACTOR,Ie:=1 MAPPED SPECTRAL RESPONSE ACCELERATION: Ss=1.6, S1=0.5 DESIGN SPECTRAL RESPONSE ACCELERATION: Sds=1.0, Sd1=0.55 SITE CLASS: D SEISMIC DESIGN CATEGORY: ❑ SEISMIC RESPONSE COEFFICIENT,Cs: 0.154 RESPONSE MODIFICATION COEFFICIENT,R: 6.5 EQUIVALENT LATERAL FORCE PROCEDURE (ASCE 7 12.8.1) DESIGN BASE SHEAR: 7.6k 7. SOIL PROPERTIES BEARING CAPACITY: 1,500 psf LATERAL CAPACITY: 250 psf/ft GENERAL: 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CONTRACT DRAWINGS. 2, DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE BUILDING. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING AND GUYS IN ACCORDANCE w/ ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. ANY DEVIATION MUST BE APPROVED PRIOR TO ERECTION. 3- ALL ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. ANY DEVIATION MUST BE APPROVED BY OSHA PRIOR TO ERECTION. 4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION PROCEDURES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND BE RESOLVED BEFORE PROCEEDING WITH THE WORK. 6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED SUBJECT TO REVIEW BY THE ENGINEER. 7. ALL DETAILS DESIGNATED AS STANDARD OR TYPICAL SHALL OCCUR IN ADDITION TO ANY OTHER SPECIFIC DETAIL CALLED OUT. 8. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OR ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE REPORTED TO THE ENGINEER SO THAT THE PROPER REVISIONS MAY BE MADE, MODIFICATIONS TO DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER. 9. FOR CONCRETE FOOTINGS: FOOTING DEPTH TO BE MIN. 12" TO PREVIOUSLY UNDISTURBED SOIL OR UNDISTURBED FILL. ALL EXTERIOR WALLS TO BE SUPPORTED ON CONTINUOUS FOOTINGS. PIPE PENETRATIONS TO BE SLEEVED. 1. FRAMING LUMBER SHALL BE HEM -FIR NO. 2; AND HEM -FIR NO. 2 FOR ALL TOP AND BOTTOM PLATES (GRADES ARE TYPICAL UNLESS OTHERWISE NOTED ON PLANS), LUMBER TO BE GRADE MARKED PER WCLIB SPECIFICATIONS. 2. STRUCTURAL SHEATHING SHALL BE APA RATED PLYWOOD, EXPOSURE 1, SHEATHING CONFORMING TO EITHER COMMERCIAL STANDARDS P51-83, APA PRP --108, OR VOLUNTARY PRODUCT STANDARD PSE -92. PROVIDE MINIMUM OF 3/8" EDGE DISTANCE ON ALL NAILS AND 1/8" EXPANSION JOINTS BETWEEN ALL PANEL EDGES. MINIMUM SHEATHING REQUIREMENTS ARE AS FOLLOWS: ROOF SHEATHING TO BE 15/32" C -D INT -APA RATED PLYWOOD WITH EXTERIOR CLUE, P.I. 24/0 (USE 5 -PLY FOR PANELIZED ROOFS). NAILING 8d 0 6 INCHES ON CENTER AT PANEL EDGES AND 12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. SUB FLOORING TO BE 23/32" T&G C -D EXTERIOR/EXPOSURE 1 -APA RATED PLYWOOD WITH EXTERIOR GLUE , P.E. 48/24. GLUE AND NAIL WITH 10d AT 6 INCHES ON CENTER AT PANEL EDGES AND 12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. 3. NAILING SHALL CONFORM TO TABLE 2304.10.1 OF THE INTERNATIONAL BUILDING CODE UNLESS NOTED OTHERWISE. USE COMMON NAILS THROUGHOUT UNLESS NOTED OTHERWISE. 4. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY DETAILED OR APPROVED IN WRITING BY THE STRUCTURAL ENGINEER. 5. PROVIDE 3"x3"x1/4" (USE GALVANIZED 0 P.T. MEMBERS) PLATE WASHERS UNDER HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD UNLESS NOTED OTHERWISE. ALL FASTENERS IN CONTACT WITH PRESSURE TREATED TO BE HOT DIPPED GALVANIZED. 6. BOLT HOLES SHALL BE NOMINAL DIAMETER OF BOLT PLUS 1/16" UNLESS OTHERWISE NOTED. LAG BOLT PILOT HOLES SHALL BE PRE -DRILLED TO 60% OF THE NOMINAL DIAMETER OF THE LAG BOLT UNLESS OTHERWISE NOTED. 7. ALL SILL PLATES SHALL BE BOLTED TO THE FOUNDATION WITH 5/8" MIN 0 STEEL BOLTS SPACED AT 48" o.c. MAX, (EMBED 7" MIN. INTO CONCRETE OR MASONRY). SEE PLANS AND DETAILS FOR SPECIFIC REQUIREMENTS WHERE OCCUR. 8. ALL FRAMING LUMBER IN CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURE TREATED. (SEE NOTE 1 FOR MINIMUM GRADE INFORMATION) 9. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR PLYWOOD USED IN SHEAR PANELS AND DIAPHRAGMS. 10. STUD NOTCHING: BEARING - 25% NOTCH, 407. BORING (60% BORING a DBL) NON BEARING - 40% NOTCH, 60% BORING HOLES NO CLOSER THAN 5/8" TO FACE OF STUD CONCRETE. NOTES: 1, MINIMUM 28 DAY STRENGTH 3,000 PSI (f'c=3,000 PSI), UNLESS NOTED OTHERWISE 2. ASTM A615 (Fy=60 KSI) DEFORMED BARS FOR ALL BARS. NO TACK WELDING OF REINFORCING BARS ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE BY THE STRUCTURAL ENGINEER. LATEST ACI CODE AND DETAILING MANUAL APPLY, 3. MINIMUM SPLICE LENGTHS: #4 BAR --24" LAP; #5 BAR -30" LAP; #6 BAR -42" 4. MINIMUM CLEAR COVERAGE: CAST AGAINST EARTH -3"; #6 BAR OR SMALLER -2" SHEARWALL SCHEDULE HOLDOI]ITN SCHEDULE MINIMUM EDGE FIELD SOLE PLATE SILL PLATE MARK SHEATHING NAILING NAILING NAILING CONN. 2 FND. (14) SDS SCREWS 25' SSTB28 1 3/4' 7/16" CDX 7/8' DIA (20) SDS SCREWS 25' SSTB28 1 3/4' (2}16d 16"o/c 5/8"dia. ® 48" o.c. ZL ONE FACE 8d 0 6"o.c. d 0 12"o.c. (4) w/ 2x BTM. PLATE SIMPS❑N A35 CLIP AT EACH 7/16" CDX FLOOR JOISTS/RO❑F RAFTERS OUTRIGGER (2)15d ® 12 "o/c 5/$„dia. 0 36" o.c. GABLE END TRUSS - ONE FACE 8d @ 4"o.c. d @ 12"o.c. WOOD w/ 2x BTM. PLATE ® 7/16" CDX 7. 10d @ 6' O.C. BOTTOM (2)164 ® 8 -o/c 5/8"dia. 0 30" o.c. TRUSS CHORD TO WALL TOP ONE FACE 8d 0 3"o.c. Sd 0 12"o.c, w/ 3x BTM. PLATE ® 15/32" CDX SIMPSON A35 CLIP EACH END (2)164 ® 8"o/c 5/8"dia. 0 24" o.c. TRUSSES PER PLAN ONE FACE 10d @ 4"o.c.10d C 12"o.c. l w/ 3x BTM. PLATE 3FACEDx (2)16d ® 6"o/c 1PLATEc ONE 10d @ 3"o.c.10d @ 12"o.c. 0 w/83x8 BTM. SHEARWALL N❑TUt 1. ALL STUDS AND BLOCKING SHALL BE HF#2 ALL TOP AND BOTTOM PLATES SHALL BE HF#2. ALL SHEATHING EDGES SHALL BE BACKED WITH 2x OR WIDER FRAMING UNLESS OTHERWISE NOTED (SEE NOTE#2). SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY, 2, WHERE SHEATHING NAILING IS A ® OR GREATER, FOUNDATION SILL PLATES AND ALL FRAMING MEMBERS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE 3 -INCH NOMINAL MEMBER AND SILL PLATES NOT BE LESS THAN A SINGLE 3 -INCH NOMINAL MEMBER. 3. NAILING CRITERIA IS BASED ON IBC 2306.3 AND AF&PA SPDWS TABLE 4.3A FOR CD PLYWOOD AND HF#2 FRAMING. WIRE STAPLES MAY BE SUBSTITUTED AS OUTLINED IN THE STRUCTURAL NOTES. OTHER SUBSTITUTIONS MUST BE VERIFIED IN WRITING BY THE STRL. ENGINEER. 4, H❑LDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS ❑F MANY SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ❑N THE PLANS, REFER TO THE APPROPRIATE CONNECTOR DETAILS FOR ADDITIONAL INFORMATION REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. 5 ANCHOR BOLTS MUST BE EMBEDDED INTO CONCRETE OR GROUTED CMU A MINIMUM OF 7', AND SHALL BE PLACED TO PROVIDE A MINIMUM OF 2' GROUTED CLEAR TO THE FACE OF FORMED CONCRETE (PROVIDED 3" CLEAR FOR CONCRETE CAST AGAINST SOIL). G. EDGE OF ANCHOR BOLT WASHER SHALL BE WITHIN 112- OF SHEAR WALL SHEATHING HIILD❑WN NOTES, 1. ALL THREAD BOLTS SHALL CONFORM TO ASTM A307 2 MIN, CONCRETE COMPRESSIVE STRENGTH F'c=3,000 psl, 3. HD11/8 REQUIRES A 6x6 MIN. POST SIZE, HDU2/4/5 REQUIRES (2)2x MIN. POST SIZE, HD19 REQUIRED MIN. 6x8 POST SIZE U.N.❑ 4. MINIMUM EDGE DISTANCE SHOWN IS FOR FORMED CONCRETE EXPOSED TO SOIL OR WEATHER, FOR CONCRETE CAST AGAINST SOIL PROVIDE 3' CLEAR TO ANCHOR BL1LT. 5. NAILS TO H❑LDOWN POSTS SHALL BE 10d COMMON. (16d SINKERS MAY BE USED WITH PRIOR WRITTEN APPROVAL BY THE STRUCTURAL ENGINEER), ROOF TRUSS PER PLAN DIAPH. EDGE NAILING 1 0 EACH TRUSS SHEARWALL--/ EDGE NAILING B -TRUSS TO SHEARWALL CONN NTS (1) HOLDOI]ITN SCHEDULE MODEL ANCHOR BOLT THRU BOLTS EMBEDMENT MIN. EDGE OR NAILS LENGTH DISTANCE HDU2 5/8' DIA (6) SDS SCREWS 21' SSTB24 1 3/4' HDU4 5/8' DIA (10) SDS SCREWS 21' SSTB24 1 3/4' HDUS 5/8' DTA (14) SDS SCREWS 25' SSTB28 1 3/4' HDU8 7/8' DIA (20) SDS SCREWS 25' SSTB28 1 3/4' HIILD❑WN NOTES, 1. ALL THREAD BOLTS SHALL CONFORM TO ASTM A307 2 MIN, CONCRETE COMPRESSIVE STRENGTH F'c=3,000 psl, 3. HD11/8 REQUIRES A 6x6 MIN. POST SIZE, HDU2/4/5 REQUIRES (2)2x MIN. POST SIZE, HD19 REQUIRED MIN. 6x8 POST SIZE U.N.❑ 4. MINIMUM EDGE DISTANCE SHOWN IS FOR FORMED CONCRETE EXPOSED TO SOIL OR WEATHER, FOR CONCRETE CAST AGAINST SOIL PROVIDE 3' CLEAR TO ANCHOR BL1LT. 5. NAILS TO H❑LDOWN POSTS SHALL BE 10d COMMON. (16d SINKERS MAY BE USED WITH PRIOR WRITTEN APPROVAL BY THE STRUCTURAL ENGINEER), ROOF TRUSS PER PLAN DIAPH. EDGE NAILING 1 0 EACH TRUSS SHEARWALL--/ EDGE NAILING B -TRUSS TO SHEARWALL CONN NTS (1) I. 16x1 @ 6' ❑,C, 2. NOTES: (2) L EDGE NAILING FLOOR SHEATHING 2. CONTINUOUS FASCIA WITH (2) 6. SHEARWALL BELOW - 10d NAILS INTO EACH SHEATH AND NAIL PER DIAPHRAGM EDGE NAILING PER PLAN OUTRIGGER @ 24' O.C. (3) 3, 2x4 OUTRIGGER @ 24' ❑.0 3. 4, (2) 10d NAILS PER TRUSS (4) 5, SIMPS❑N A35 CLIP AT EACH (5) FLOOR JOISTS/RO❑F RAFTERS OUTRIGGER JOIST 6. GABLE END TRUSS - (6) Ir SHEATHING AND NAILING PER WOOD BEAM PER PLAN SHEARWALL SCHEDULE (7) 7. 10d @ 6' O.C. BOTTOM 00 TRUSS CHORD TO WALL TOP o R.. PLATE B. 2x4 BRACE @ 48' O.C. WITH SIMPSON A35 CLIP EACH END 9, TRUSSES PER PLAN 12 -TRUSS GABLE END TRUSS NTS T�_TI==TT==71=;TT---I IT-��-Tf -IT-_T I II II II II I I I! ! !I I! II If !1 II II 1 F` - 71_ _ Tr _ _ ,1Da---1 ! @-11 1 K 11 11 1 I II II I1 !I !I II 11 I I II II fl 11 II 11 11 I ! II !I 11 11 II � II II I F=:�1==:ff I 11 II II II I 1 11 11 11 II II II 41 I ! II 11 I! II II II II I ! II fl fl 11 11 11 f 1 ! 11 !I E I! 11 II II 11 I 1 I! II 1! II II II I I L- J1-4-11 --I L-4- _U IL J L.4- --a-[ ODOUBLE TOP PLATE w/ EDGE NAILING (STAGGER (F TOP PLATE SPLICE AND NAILING PER PLANS. SEE SHEARWALL SCHEDULE FOR LUMBER GRADE, LAP 4'-0" MINIMUM. CENTER SPLICE ON STUD. aB EDGE NAILING AT ALL PANEL EDGES. BACK w/ d HOLDOWN PER SCHEDULE AND PLAN 2x BLOCKING OR BACKING PLATE SIZES @EDGE NAILING TO HOLDOWN POST (FULL HEIGHT) w� SOIEyRWALLLSCHEDUSTUD LEDREQUIREMENTS STUDS ® 16" o.c. Q EDGE NAILING TO POSTS. TRIM STUDS E@P.T. SILL PLATE w/ EDGE NAILING & ANCHOR AND KING STUDS BOLTS PER SHEARWALL SCHEDULE (PROVIDE A MINIMUM OF 5/8"dic. ANCHOR BOLTS 0 O BEARING STUD FOR HEADER 48" o.c.) 1 -TYPICAL W❑❑D SHEARWALL ELEVATION NTS 1) 2) 3) NOTES: 1. TOP PLATE SPLICE OVER STUD ONLY. 2. DOUBLE TOP PLATE 3. WOOD STUDS 5 -TYPICAL SPLICE ❑F W❑OD TDP PLATE NTS N❑TESr I. 16x1 @ 6' ❑,C, 2. EDGE NAILING 3. 2x BLOCKING 4. FLOOR SHEATHING 5. JOISTS PER PLAN 6. SHEARWALL BELOW - SHEAR PANELS OVER RIM SHEATH AND NAIL PER DIAPHRAGM EDGE NAILING PER PLAN SHEARWALL SCHEDULE 9-J❑IST AT W❑❑D STUD WALL NTS SIMPSON ST36 STRAP TIE ACROSS TOP PL OR BEND VERT TO POST DOUBLE TOP PLATE (2) 16dBEAM SIMPSON ST STRAP TIE SIMPSON LTP5 EA FACE DOUBLE TOP PLATE BEAM DOUBLE TOP PLATE (2) 16d A35 CLIP SIMPSON ST STRAP TIE ! DOUBLE 2 X STUDS, MINIMUM DOUBLE 2 X STUDS, MINIMUM DOUBLE STUD A) BEAM PERPENDICULAR B) BEAM PARALLEL C) BEAM ❑N TOP PLATE 2 -TYPICAL W❑❑D BEAM T❑ W❑❑D FRAMING MTS rtti 3 -TYPICAL WO❑D FLUSH BEAM NTS NOTFS: ❑ 1. (1) NOTES, NOTES, BASE (2) 1. FLD❑R/ROOF SHEATHING I. DOUBLE EDGE NAILING SHEAR PANELS OVER RIM 2. DIAPHRAGM EDGE NAILING PER PLAN 2. FLOOR SHEATHING (3) 3. 2x4 FLAT BLOCKING 3. JOIST PER PLAN (4) 4, FLOOR JOISTS/RO❑F RAFTERS 4. JOIST HANGER PER PLAN :z Ir 5. WOOD BEAM PER PLAN ct 24 Q� 3 -TYPICAL WO❑D FLUSH BEAM NTS NOTFS: ❑ 1. SHEARWALL PER PLAN 2, BASE PLATE NAILING 3, SHEAR PANEL EDGE NAILING 4. BREAK SHEAR PANELS OVER RIM 5. 16d @ 6'o/c 6. PLYWOOD SUBFL❑QR 7, FLOOR JOIST PER PLAN 8. (2)2x PLATE, PT BOTTOM PLATE S -TYPICAL FLOOR TO FLOOR WALL CONN, NTS (1) NOTES! (2} 1. FLOOR SHEATHING 2, DIAPHRAGM EDGE NAILING PER PLAN (3) 3. 2x4 FLAT BLOCKING (4) 4. FLOOR JOISTS 10 -TYPICAL FLOOR BLOCKING NTS SHEARWALL SHEA' PER I Bd/10d @ 6'o/c SOLE PLATE NAILIN 8d/lOd @ 6'o/ 8d/lod @ 6'a/ 4 -TYPICAL W❑❑D FLO❑RIR❑❑F BLOCKING NTS FLOOR SHEATHING NG 'JSTS 3/c TO TOP PLATE 7-FL❑❑R TO INT SHEARWALL NTS 'o/c 6'a/c 11 -TYPE 3/4/5 SHEARWALL EDGE NAILING NTS o1�fo�N z ❑ ❑ DQ [t Lu W cd � a a, vs o r.., r 04 .PON :z Ir TA ct 24 Q� G� 00 �--i o R.. � z SCALE: AS SHOWN DATE- Nov.2020 DRAWING NUMBER 11318A w � DQ [t C= o cd � a a, vs o r.., r 04 .PON :z Ir r ct 24 Q� G� 00 �--i o R.. SCALE: AS SHOWN DATE- Nov.2020 DRAWING NUMBER 11318A w � DQ M vs ct r.., r .PON :z Ir r SCALE: AS SHOWN DATE- Nov.2020 DRAWING NUMBER 11318A M vs r.., .PON :z [o o R.. � Q o all l 0 0 v W r� SCALE: AS SHOWN DATE- Nov.2020 DRAWING NUMBER 11318A