Loading...
2021.0074.BP0005 Structural_Drawings_Water_Tank_TCOMM911_Yelm_Water_Tank_LDC_202102091.GENERAL 1.1.ALL CONSTRUCTION SHALL CONFORM TO THE 2018 INTERNATIONAL BUILDING CODE. REFERENCE TO OTHER STANDARDS OR CODES SHALL MEAN THE LATEST STANDARD OR CODE ADOPTED & PUBLISHED. 1.2.DRAWINGS SHOW TYPICAL & CERTAIN SPECIFIC CONDITIONS ONLY. FOR DETAILS NOT SPECIFICALLY SHOWN, PROVIDE DETAILS SIMILAR TO THOSE SHOWN. 1.3.EXISTING STRUCTURES & UNDERGROUND UTILITIES/STRUCTURES ARE ON DRAWINGS FOR CLARITY ONLY. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS & ELEVATIONS BEFORE STARTING WORK. NOTIFY STRUCTURAL ENGINEER IN WRITING OF ANY INTERFERENCE AND/OR DISCREPANCIES THAT MIGHT EXIST. 1.4.THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING TEMPORARY SUPPORTS, ETC., IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 1.5.COORDINATE STRUCTURAL CONTRACT DOCUMENTS WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING & CIVIL. NOTIFY STRUCTURAL ENGINEER OF ANY CONFLICT AND/OR OMISSION. 1.6.COORDINATE & VERIFY FLOOR, ROOF AND WALL OPENING SIZES & LOCATIONS WITH ARCHITECTURAL, MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS. FOR ADDITIONAL OPENINGS NOT SHOWN ON THE STRUCTURAL DRAWINGS, SEE ARCHITECTURAL & MECHANICAL DRAWINGS. 1.7.FOR DIMENSIONS NOT SHOWN, SEE ARCHITECTURAL DRAWINGS. 1.8.REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS BY THE STRUCTURAL ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW & CHECK SHOP DRAWINGS BEFORE SUBMITTAL TO THE STRUCTURAL ENGINEER. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS & OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, & DIMENSIONS SPECIFIED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS ALSO RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION. 1.9.STRUCTURAL DESIGN DRAWINGS SHALL NOT BE REPRODUCED AS SHOP DRAWINGS. CONTRACTOR & THEIR SUBCONTRACTORS SHALL PREPARE ORIGINAL SHOP DRAWINGS. 1.10.CONTRACTOR SHALL REVIEW & STAMP ALL SHOP DRAWINGS BEFORE SUBMITTAL FOR REVIEW. PROPOSED FABRICATION CHANGES FROM DESIGN DRAWINGS SHALL BE NOTED IN SHOP DRAWINGS. ANY DISCREPANCIES BETWEEN ARCHITECTURAL & STRUCTURAL DRAWINGS SHALL BE NOTED TO BE VERIFIED ON SHOP DRAWINGS. 1.11.COMPLETE SHOP DRAWINGS FOR CONSTRUCTION OF ALL APPLICABLE SPECIALTY ITEMS INCLUDING CURTAIN WALL GLAZING SYSTEMS, LIGHT GAUGE STEEL FRAMING, ORNAMENTAL GUARDRAILS, SKYLIGHTS, METAL GRATING & STAIRS SHALL BE SEALED & SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON & SHALL BE AVAILABLE AT THE JOB SITE DURING THE TIMES OF INSPECTION. 1.12.RISK CATEGORY = II 1.13.DESIGN GRAVITY LOADS: DEAD LOADS: EQUIPMENT______________________________SEE PLAN LIVE LOADS N/A SNOW LOAD: DESIGN SNOW LOAD, Ps 25 PSF 1.14.WIND LOADS: ULTIMATE WIND SPEED (3 SEC. GUST), V ult 97 MPH NOMINAL DESIGN WIND SPEED, V asd 75 MPH EXPOSURE CATEGORY C INTERNAL PRESSURE COEFFICIENT, GC pi ±0.18 1.15.SEISMIC LOADS: SEISMIC IMPORTANCE FACTOR, I e 1.00 MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS: (SHORT SECOND) S s 1.290 (1-SECOND PERIOD) S1 0.465 SITE CLASS D DESIGN SPECTRAL RESPONSE ACCELERATION COEFFICIENTS: (SHORT SECOND) SDS 0.860 (1-SECOND PERIOD) SD1 0.596 SEISMIC DESIGN CATEGORY D 1.16.FULL-BUILDING LATERAL ANALYSIS HAS NOT BEEN PERFORMED ON THIS STRUCTURE AS THE ADDITIONS SHOWN IN THIS SUBMITTAL PACKAGE DO NOT INCREASE THE GOVERNING LATERAL FORCES BY MORE THAN 10% AS ALLOWED BY EXCEPTION #2 PROVIDED IN THE 2018 INTERNATIONAL BUILDING CODE, SECTION 1103.3. 1.17.ANALYSIS PER EQUIVALENT FORCE METHOD 2.STRUCTURAL STEEL 2.1.STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED & ERECTED ACCORDING TO AISC "MANUAL OF STEEL CONSTRUCTION," FOURTEENTH EDITION , & AISC 360-10 "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS." 2.2.SUBMIT SHOP DRAWINGS PREPARED IN ACCORDANCE WITH THE LATEST EDITION OF AISC MANUAL "DETAILING FOR STEEL CONSTRUCTION." DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED & REVIEWED BY STRUCTURAL ENGINEER & ARCHITECT. 2.3.UNLESS NOTED OTHERWISE ON DRAWINGS, ALL STRUCTURAL STEEL SHAPES, PLATES, & BARS SHALL CONFORM TO ASTM A36 (FY = 36KSI). 2.4.STEEL PIPE SHALL CONFORM TO ASTM A53, GRADE B (FY = 35KSI). 2.5.ALL FIELD BOLTED CONNECTIONS SHALL BE MADE WITH HIGH STRENGTH THREADED FASTENER ASSEMBLIES (H.S. BOLTS) THAT CONFORM TO ASTM A325 OR A490. 2.6.CONNECTIONS MADE WITH H.S. BOLTS SHALL COMPLY WITH RCSC "SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS." IN BEARING TYPE CONNECTIONS, TIGHTEN BOLTS TO DEVELOP AT LEAST A SNUG-TIGHT CONDITION. ALL OTHER CONNECTIONS SHALL BE TIGHTENED TO DEVELOP MINIMUM BOLT TENSIONS REQUIRED FOR SLIP CRITICAL OR DIRECT TENSION CONNECTIONS. 2.7.PAINT STRUCTURAL STEEL IN ACCORDANCE WITH THE ARCHITECT'S SPECIFICATIONS. DO NOT PAINT CONNECTIONS DESIGNED AS FRICTION TYPE OR TO BE WELDED. 2.8.ALL STEEL THAT IS TO BE PERMANENTLY EXPOSED TO WEATHER SHALL BE HOT-DIP GALVANIZED. 2.9.GALVANIZED COATING SHALL CONFORM TO ASTM 525, G60. 2.34.REPAIR ANY GALVANIZED AREAS THAT ARE DAMAGED BY HEAT AND STICK METHOD IN ACCORDANCE WITH ASTM-A780, A1. REPAIR USING ZINC-BASED ALLOYS (HEAT-STICK METHOD). PAINT CONTAINING ZINC DUST SHALL NOT BE USED FOR REPAIRS. 2.35.THE STRUCTURE IS DESIGNED TO BE STABLE IN ITS COMPLETED FORM. THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURE'S STABILITY DURING CONSTRUCTION. PROVIDE NECESSARY BRACING & SHORING AS REQUIRED. 2.36.SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL MISCELLANEOUS STEEL NOT SHOWN ON STRUCTURAL DRAWINGS. 2.37.MINIMIZE FIELD WELDING. 2.38.FIELD PAINTING & TOUCH-UP SHALL BE PERFORMED ON ALL FIELD JOINTS OF STEEL THAT HAVE HAD A SHOP COAT OF PAINT. 2.39.DO NOT WELD THROUGH GALVANIZING OR PAINT. 2.40.SUBMIT SHOP DRAWINGS PREPARED IN ACCORDANCE WITH AISC MANUAL "DETAILING FOR STEEL CONSTRUCTION." DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED & REVIEWED. 2.41.STRUCTURAL STEEL SHOP DRAWINGS & ERECTION DRAWINGS SHALL BE ORIGINAL & SHALL BE SUBMITTED FOR APPROVAL PRIOR TO FABRICATION. REPRODUCIBLE PRINTS MADE FROM CONTRACT DRAWINGS ARE NOT PERMITTED. 3.MAGNET MOUNTS 3.1.ALL MAGNETS SHALL BE MAGLOGIX MAGNAHOIST, UNLESS NOTED OTHERWISE. SEE DETAILS FOR EXACT MODEL NUMBER. 3.2.MANUFACTURER SHALL PREPARE THE MAGNAHOIST MAGNET FOR PERMANENT INSTALLATION IN AN EXPOSED ENVIRONMENT BY OVER PACKING ALL VOIDS WITH GREASE AND FILLING ALL POSSIBLE INTRUSION AREAS WITH A SILICON BASED BARRIER. 3.3.TANK SURFACE SHALL BE SMOOTH AND NO MORE THAN 0.04" OF PAINT OR PRIMER AT THE INSTALLATION LOCATIONS. CONTRACTOR SHALL PROVIDE REPORTS OF DRY FILM THICKNESS PRIOR TO MAGNET INSTALLATION. CHANGES TO THE PAINT (REMOVAL, ETC.) REQUIRES PRIOR APPROVAL BY PROPERTY OWNER. 3.4.TANK STEEL WALL THICKNESS SHALL BE A MINIMUM OF 3/8". 3.5.TANK ROOF THICKNESS SHALL BE A MINIMUM OF 3/16". 3.6.ALL MAGNETS SHALL BE INSTALLED ON A FLAT SURFACE UNLESS MODIFIED WITH V-BASE PER MANUFACTURER RECOMMENDATION FOR CURVED SURFACE. 3.7.TANK FINISHES SHALL INCLUDE: 3.7.a.TNEMEC PRIMER SERIES 3.7.a.a.MATCH SERIES NUMBER TO PUBLIC WORKS WATER DISTRICT TNEMEC PRIMER MODEL NUMBERS. 3.7.a.b.MATCH NUMBER OF COATS TO PUBLIC WORKS WATER DISTRICT COAT APPLICATION SPECS. 3.7.b.TNEMEC EPOXY SERIES 3.7.b.a.MATCH SERIES NUMBER TO PUBLIC WORKS WATER DISTRICT TNEMEC EPOXY MODEL NUMBERS. 3.7.b.b.MATCH NUMBER OF COATS TO PUBLIC WORKS WATER DISTRICT COAT APPLICATION SPECS. 3.8.THE CARRIER SHALL PROVIDE MAINTENANCE AND A VISUAL INSPECTION ON AN ANNUAL BASIS OR WHEN ANTENNA EQUIPMENT IS CHANGED, WHICHEVER COMES FIRST. CONSULT THE MAGNET MANUFACTURER ON WHEN TO REPLACE THE MAGNETS. 4.SPECIAL INSPECTIONS 4.1.STRUCTURAL TESTS AND INSPECTIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. 4.1.a.THE INSPECTOR SHALL BE HIRED AND PAID FOR BY THE CARRIER. 4.1.b.THE INSPECTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE APPROVED STRUCTURAL PLANS AND SHALL SUBMIT PROGRESS REPORTS AND INSPECTION REPORTS TO THE BUILDING OFFICIAL AND TO THE STRUCTURAL ENGINEER OF RECORD. 4.2.SATISFY MINIMUM INSPECTION AND QUALITY CONTROL REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. 4.3.SPECIAL INSPECTION PERFORMED BY MANUFACTURER OR A THIRD PARTY TESTING AGENCY IS REQUIRED FOR THE INSTALLATION OF MAGNETS. TESTS SHALL SHOW THAT THE MAGNETS INSTALLED ON THE EXISTING STEEL THICKNESS MEET OR EXCEED THE REPORTED PULL STRENGTH. 4.4.SEE THIS SHEET FOR SCHEDULE OF SPECIAL INSPECTIONS. PROJECT SCHEDULE OF SPECIAL INSPECTIONS MATERIAL/ACTIVITY SERVICE APPLICABLE TO THIS PROJECT Y/N EXTENT AGENT DATE COMPLETED 1705.2 STEEL CONSTRUCTION 1. FABRICATOR AND ERECTOR DOCUMENTS (VERIFY REPORTS AND CERTIFICATES AS LISTED IN AISC 360, CHAPTER N, PARAGRAPH 3.2 FOR COMPLIANCE WITH CONSTRUCTION DOCUMENTS) SUBMITTAL REVIEW Y EACH SUBMITTAL 2. MATERIAL VERIFICATIONS OF STRUCTURAL STEEL SHOP (3) AND FIELD INSPECTIONS Y PERIODIC 6. STRUCTURAL STEEL BOLTING: A. INSPECTION TASKS PRIOR TO BOLTING (OBSERVE OR PERFORM TASKS FOR EACH BOLTED CONNECTION IN ACCORDANCE WITH QA TASKS LISTED IN AISC 360, TABLE N5.6-1 Y OBSERVE OR PERFORM AS NOTED (4) B. INSPECTION TASKS DURING BOLTING (OBSERVE THE QA TASKS LISTED IN AISC 360, TABLE N5.6-2 Y 1) PRETENSIONED AND SLIP-CRITICAL JOINTS Y OBSERVE (4) A) TURN-OF-NUT WITH MATCHING MARKINGS Y PERIODIC B) DIRECT TENSION INDICATOR Y PERIODIC C) TWIST-OFF TYPE TENSION CONTROL BOLT Y PERIODIC D) TURN-OF-NUT WITHOUT MATCHING MARKINGS Y CONTINUOUS E) CALIBRATED WRENCH Y CONTINUOUS 2) SNUG-TIGHT JOINTS Y PERIODIC C. INSPECTION TASKS AFTER BOLTING (PERFORM TASKS FOR EACH BOLTED CONNECTION IN ACCORDANCE WITH QA TASKS LISTED IN AISC 360, TABLE N5.6-3 Y PERFORM (4) STRUCTURAL GENERAL NOTES S-1.0 Network Services, LLC SOLUTIONSMOTOROLA SHEET NUMBER SUBMITTALS DATE: DRAWN BY: CHECKED BY: SITE DESCRIPTION BYDATE SHEET TITLE REV APPROVAL STAMP www.LDCcorp.com 20210 142nd Avenue NE Woodinville, WA 98072 F 425.482.2893T 425.806.1869 S u r ve yin g Eng ineer ing Pla nn in g Woodinville 1851 Central Pl S, #101 Kent, WA 98030 KentTCOMM9-1- 1 POLICE ·FIRE ·MEDICAL 9 · 1 · 1 YELM WATER TANK 901 RHOTON RD NW YELM, WA 98597 2-09-21 EJV GJS REFERENCE PLAN NOTES: 1.DO NOT SCALE FROM PLANS. PLANS ARE FOR REFERENCE ONLY. 2.SEE ARCHITECTURAL DRAWINGS FOR EXACT PLACEMENT OF RACKS AND BATTERIES WITHIN EQUIPMENT SHELTER. 332 332 1 S-3.0 1 S-3.0 5 S-3.0 OMNI, SEE ARCH. ATTACH TO HANDRAIL POST PER MANUFACTURER OMNI, SEE ARCH. ATTACH TO HANDRAIL POST PER MANUFACTURER MW ANTENNA, SEE ARCH (E)WATER TANK STRUCTURAL PLAN S-2.01STRUCTURAL REFERNCE PLAN 22"x34" SCALE: 1/4" = 1'-0"11"x17" SCALE: 1/8" = 1'-0" Network Services, LLC SOLUTIONSMOTOROLA SHEET NUMBER SUBMITTALS DATE: DRAWN BY: CHECKED BY: SITE DESCRIPTION BYDATE SHEET TITLE REV APPROVAL STAMP www.LDCcorp.com 20210 142nd Avenue NE Woodinville, WA 98072 F 425.482.2893T 425.806.1869 S u r vey ing En gineer in g Pla nn ing Woodinville 1851 Central Pl S, #101 Kent, WA 98030 KentTCOMM9-1- 1 POLICE ·FIRE ·MEDICAL 9 · 1 · 1 YELM WATER TANK 901 RHOTON RD NW YELM, WA 98597 2-09-21 EJV GJS 2'-0" \A1;2'-0" 1'-0" \A1;1'-0" 1'-0" (E)3/8" STEEL TANK WALL SEE ARCHITECTURAL SHEETS FOR ANTENNA & ANCILLARY EQUIPMENT INFORMATION. ATTACH TO PIPE PER MANUFACTURER'S RECOMMENDATIONS MAGNET, TYP. MOUNT BRACKET, TYP 1 S-3.0 (E)1/4" STEEL TANK WALL MOUNT PIPE 2 STD. (OD= 2.38")1'-0"CONTRACTOR NOTE: 1.ANTENNA OR ANCILLARY EQUIPMENT PER ARCHITECTURAL. ATTACH TO MOUNT PIPE PER MANUFACTURER'S RECOMMENDATIONS. MOUNT BRACKET, TYP. MAGNET, TYP. C/ MW ANTENNA 1'-0"2 S-3.0 TYP. 4' MW DISH, SEE ARCH (MAX WEIGHT 85#) 138.0' AGL 4'-0"4'-0"\A1;1'-6 7/8"3'-11 1/2"\A1;3'-11 1/2"8'-0"\A1;8'-0"1'-1 5/8"VHF ANTENNA, SEE ARCH (MAX WEIGHT 32#). ATTACH TO SUPPORT PIPE PER MANUFACTURER'S RECOMMENDATIONS.PIPE 3 1/2 STD (O.D. = 4.00") L3-1/2x3-1/2x1/4 KNIFE PLATE w/(2) 5/8"Ø BOLTS 3'-0"4 S-3.1 6 S-3.1 (E)HANDRAIL 6"(E)TANK SHELL 5 S-3.1 (E)HAND RAIL HORIZONTAL VHF ANTENNA, SEE ARCH MAST PIPE 4'-0" \A1;4'-0"4'-0"\A1;4'-0"4'-0"3 S-3.0 KICKER ANGLE, SEE ELEVATION 4MW ANTENNA ATTACHMENT 22"x34" SCALE: 2" = 1'-0"11"x17" SCALE: 1" = 1'-0" 1MW ANTENNA ATTACHMENT 22"x34" SCALE: 1" = 1'-0"11"x17" SCALE: 1/2" = 1'-0" NOT USED 23SECTION @ NEW KICKER 22"x34" SCALE: 3/4" = 1'-0"11"x17" SCALE: 3/8" = 1'-0" STRUCTURAL DETAILS S-3.0 5KICKER ENLARGED PLAN 22"x34" SCALE: 1" = 1'-0"11"x17" SCALE: 1/2" = 1'-0" Network Services, LLC SOLUTIONSMOTOROLA SHEET NUMBER SUBMITTALS DATE: DRAWN BY: CHECKED BY: SITE DESCRIPTION BYDATE SHEET TITLE REV APPROVAL STAMP www.LDCcorp.com 20210 142nd Avenue NE Woodinville, WA 98072 F 425.482.2893T 425.806.1869 S u r vey ing En gineer in g Pla nn ing Woodinville 1851 Central Pl S, #101 Kent, WA 98030 KentTCOMM9-1- 1 POLICE ·FIRE ·MEDICAL 9 · 1 · 1 YELM WATER TANK 901 RHOTON RD NW YELM, WA 98597 2-09-21 EJV GJS MOUNT PIPE PL1/4"x3"x0'-6" w/(2)5/8"Ø BOLTS, ORIENT LONG SIDE IN LINE WITH MOUNT PIPE. (E)2x2x1/4 ANGLE HANDRAIL POST 3/16 MOUNT PIPE 1/2"Ø ANVIL U-BOLTS, TYP. 1/2" L3x3x1/4 w/(1)5/8"Ø BOLT EACH END L3x3x1/4, 6" LONG w/(1)M20 BOLT MAGLOGIX MAGNAHOIST MXL-2200 LIFTING MAGNET 1 3/4"\A1;1 3/4"5 3/4"\A1;5 3/4"1 3/4" \A1;1 3/4"1 1/8"\A1;1 1/8"1 1/8"\A1;1 1/8"1 7/8"\A1;1 7/8"1"\A1;1"1 7/8"MAGNET, TYP. WELDED PLATE CONFIGURATION, SEE ELEVATION 1/2" \A1;1/2"5 3/4" 2 S-3.1 PL1/2"x5"SQ (1)5/8"Ø BOLT MAGLOGIX MAGNAHOIST MXL-2200 LIFTING MAGNET (E)TANK KICKER PL1/2"x7"x1'-3" w/(4)M20 BOLTS, (1)TO EACH MAGNER 3/16 KICKER, SEE ELEVATION PL1/4"x4"x0'-6" (1)5/8"Ø BOLT MW MAST PIPE 3/16 4MAST PIPE ATTACHMENT 22"x34" SCALE: 6" = 1'-0"11"x17" SCALE: 3" = 1'-0" 1MAGNET ATTACHMENT 22"x34" SCALE: 6" = 1'-0"11"x17" SCALE: 3" = 1'-0"2MAGNET LAYOUT @ KICKER 22"x34" SCALE: 6" = 1'-0"11"x17" SCALE: 3" = 1'-0" 6MAGNET ATTACHMENT @ KICKER 22"x34" SCALE: 3" = 1'-0"11"x17" SCALE: 1 1/2" = 1'-0" STRUCTURAL DETAILS S-3.1 5KICKER ATTACHMENT 22"x34" SCALE: 6" = 1'-0"11"x17" SCALE: 3" = 1'-0" Network Services, LLC SOLUTIONSMOTOROLA SHEET NUMBER SUBMITTALS DATE: DRAWN BY: CHECKED BY: SITE DESCRIPTION BYDATE SHEET TITLE REV APPROVAL STAMP www.LDCcorp.com 20210 142nd Avenue NE Woodinville, WA 98072 F 425.482.2893T 425.806.1869 S u r vey ing En gineer in g Pla nn ing Woodinville 1851 Central Pl S, #101 Kent, WA 98030 KentTCOMM9-1- 1 POLICE ·FIRE ·MEDICAL 9 · 1 · 1 YELM WATER TANK 901 RHOTON RD NW YELM, WA 98597 2-09-21 EJV GJS