2020.0363 ROW Permit Issue 12.07.2020ROW Permit Date Issued:
12/07/2020
Permit #:
2020.0363.ST0037
Applied Date:12/07/2020 Issue Date:12/07/2020 Expiration Date 02/15/2021
Proposed Use:WATER TIE IN FOR THE NEW YMS, COATES RD BETWEEN THE INTERSECTION OF COASTS AND
EDWARDS TO THE INTERSECTION OF COATES AND SOLBERG STREET
Physical Address:Require Sprinklers:No
Parcel #:00000 Structures:Heating:
Subdivision:Stories:Roofing:
Zoning:Bedrooms:Bathrooms:
Load:Construction Type:
Use:Code Edition:
Occupancy:Service Location:
Applicant Contractor
MIDWAY UNDERGROUND, KOSKINIEMI NEIL MIDWAY UNDERGROUND, KOSKINIEMI NEIL
PO BOX 1107 PO BOX 1107
TOLEDO, WA 98591 TOLEDO, WA 98591
Contact:Contact:
Phone:(360) 624-1304 Phone:(360) 624-1304
Fax:( ) -Fax:( ) -
Email:neil@midwayundergournllc.COM Bus Lic:
Cont Lic:
UBI:
Fees Qty Rate Amount Date Fully Paid Invoice #Amount
v Standard ROW Permit 1.00 800.00 800.00 12/07/2020 1674 800.00
800.00 800.00
Estimated Balance Due:
Conditions
Set By:DerekM Trench - Pavement Restoration shall
conform to specifications found in Chapter
2.10.140 of City of Yelm Development
Guidelines and Standard Details Dwg 2-10Resolved Date:Resolved By:
Set By:DerekM The contractor shall be responsible for all
traffic control in accordance with MUTCD.
No work shall commence until all approved
traffic control is in place.Resolved Date:Resolved By:
Set By:DerekM Temporary Street Patching shall conform to
specifications found in Chapter 2.10.130 of
City of Yelm Development GuidelinesResolved Date:Resolved By:
Initials ______Page 1
City of Yelm, Washington
106 2nd Street SE | Yelm, WA 98597
=
(360) 458-3244 | www.yelmwa.gov
All work will comply with terms as described in Chapter 15.72 YMC "Conditions for Use of Right-of-Way" and
Chapter 18.28 YMC : Engineering Specifications and Standard Details"
= =
The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days
before proceeding with any excavation associated with this permit.
=
Notify the City of Yelm Inspection Hotline @ (360) 458-8410 at least 24 hours before work commences and to
coordinate final inspection.
=