Loading...
2021.0001 ROW Permit Issue 03.10.2021ROW Permit Date Issued: 01/04/2021 Permit #: 2021.0001.ST0001 Applied Date:01/04/2021 Issue Date:01/04/2021 Expiration Date 05/01/2021 Proposed Use: Physical Address:Require Sprinklers:No Parcel #:00000 Structures:Heating: Subdivision:Stories:Roofing: Zoning:Bedrooms:Bathrooms: Load:Construction Type: Use:Code Edition: Occupancy:Service Location: Applicant Contractor HEATON SHANNON HEATON SHANNON ,, Contact:Contact: Phone:(253) 922-2787 EXT 258 Phone:(253) 922-2787 EXT Fax:( ) -Fax:( ) - Email:SHEATON@CANNONCONSTRUCTIONIN Bus Lic: Cont Lic: UBI: Fees Qty Rate Amount Date Fully Paid Invoice #Amount v Standard ROW Permit 1.00 250.00 250.00 01/04/2021 1754 250.00 v Street Cut Up To 50 Sq. Ft.1.00 200.00 200.00 v 02/11/2021 1762 200.00 450.00 450.00 Estimated Balance Due: Conditions Set By:DerekM Trench - Pavement Restoration shall conform to specifications found in Chapter 2.10.140 of City of Yelm Development Guidelines and Standard Details Dwg 2-10Resolved Date:Resolved By: Set By:DerekM The contractor shall be responsible for all traffic control in accordance with MUTCD. No work shall commence until all approved traffic control is in place.Resolved Date:Resolved By: Set By:DerekM Temporary Street Patching shall conform to specifications found in Chapter 2.10.130 of City of Yelm Development GuidelinesResolved Date:Resolved By: Initials ______Page 1 City of Yelm, Washington 106 2nd Street SE | Yelm, WA 98597 = (360) 458-3244 | www.yelmwa.gov All work will comply with terms as described in Chapter 15.72 YMC "Conditions for Use of Right-of-Way" and Chapter 18.28 YMC : Engineering Specifications and Standard Details" = = The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. = Notify the City of Yelm Inspection Hotline @ (360) 458-8410 at least 24 hours before work commences and to coordinate final inspection. =